Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance VILL CHUNI P O BAGAHAR TEHSIL KOTKHAI SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | Admitted-Finance |
| 2 | Admitted-Finance VILLAGE BANDLI P O KANDO BHATNOL TEHSIL SHILLAI DISTRICT SIRMOUR H P | BANDLI | SIRMOUR | HIMACHAL PRADESH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance R O BRAGTA BHAWAN CHOTTA SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | Admitted-Finance |
Tender Value
₹44.6 L
EMD Value
₹75,000
Closing Date
1 Mar 2023, 6:00 pmClosed
EE HPSAMB Shimla
EE HPSAMB Shimla
Restoration of rain damages at fruit and vegetable Market Yard at Bhatta Kuffar, Distt. Shimla, H.P. SH Removal of slip behind the auction platform.
2023_HPAMB_68962_1
HMB-EC-11/92-Vol-XI
Open Tender
Civil Works
Item Rate
30 days
Bhatakufar
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,360
EE HPSAMB
₹75,000
17 Mar 2023
15 Feb 2023
3 Mar 2023
15 Feb 2023
1 Mar 2023
15 Feb 2023
Amount
Demolishing cement concrete work of CC 1:4:8 mix (i/c equivalent design mix) manually/by mechanically means including disposal of material within all leads and lifts as per the direction of Engineer-in-charge.
Demolition above ground level upto floor two level including disposal of unserviceable material withinall leads and including cutting the necessary reinforcement and separating out from RCC works complete as per HP.PWD., Specifications of 1990 volume-I and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer-in charrge through all modes of transportation including head load animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machaneries tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required) a) RCC works
Extra for scraping cleaining and straightening reinforcement salvaged from R.C.C/R/B.work, including carriage of materials through all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge.
Demolition of brick work above G.L upto all floor level including stacking of serviceable materials and disposal of un-servieable materials within lead & lift In cement mortar, including carriage of materials through all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge.
Dismantling kota stone flooring kota stone laid in cement mortar upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials within lead & lifts Stone slab/flagged floors,including carriage of materials through all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge.
Dismantling of G.I sheet roofing including ridges hips valleys gutters etc. including Stacking the serviceable materials and disposal of unserviceable materials including carriage of materials through all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge.
Dismantling steel work in built up sectional in angles tees flats and channels including all gusset plates, bolts, nuts welding etc. and stacking the materials Including dismembering, including carriage of materials through all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge.
Removal of slips in all kinds of soil and Disposing of all un-servicable material in spcified manner on approved dumping site(to be arranged by the contractor) and stacking the servicable material etc. including carriage of materials through all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge. ( Any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases. Note: (i) No. Material will be issued by the department (ii) All the Unservicable/servicable materials recovered during demolition will be handed over to APMC authorities through JE incharge of work.
SANDEEP KANT SHARMA
Sohan Singh
ABHAY MEHTA
HARGOVIND RANA
Vikrant Sanjta
Mohinder Verma
GAYATRI TEGTA
Sandeep Chandel
baru ram
Ravi Kumar
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .