Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
29 Sept 2026, 12:00 pm7d left
E.E. Construction Division-2, P.W.D. Jaunpur
E.E. Construction Division-2, P.W.D. Jaunpur
Janpad jaunpur me Vidhansabha Kerakat me Gomati nadi par Saroj Badewar Bhitari Ghat par Pantoon setu ke Erection marammat rakhrakhav and dismentaling ka karya pantoon pul ke chatigrast Pipon ke marammat ka karya erection hetu vividh samgraiyon ki apu
2026_CEUVZ_1185958_1
2480/4A date 27-08-2026
Open Tender
Civil Works
Fixed-rate
360 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹2.3 L
Yes
15 Sept 2026
15 Sept 2026
29 Sept 2026
15 Sept 2026
29 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | S/L wooden anchor of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails, all labour and T&P etc. required for proper completion of work as per direction of E/I.(For U/S) but excluiding cost of P.P. rope. SOR No. 26 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 16 | Nos. | 2,130 | ₹34,080 |
| 2 | S/L wooden anchor of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails & weaving packing average 90 sand filled cement bag and also incluiding anchoring with coir rope (1.5 inch dia.) all labour and T&P etc. required for proper completion of work as per direction of E/I.(For D/S) SOR No. 26 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 10 | Nos. | 2,130 | ₹21,300 |
| 3 | S/o sand filled cement bags of good quality & good condition duly filled with local sand and properly stitching with Calcutta sutli for filling in anchor, bandling etc. work including cost of all material, labour, carriage, T&P etc. and placing as per direction of E/I. SOR No. 2 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 500 | Nos. | 9.5 | ₹4,750 |
| 4 | Dragging the pontoon from dry bed on the river bank to river water pulling and rolling them in the water to bring in the proper position and making pairs of two pontoons with girder and anchoring them in D/s of pontoon bridge including all labour,T&P etc.required for proper completion of the work as per direction of E/I SOR No. 3 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 8 | Pair | 2,470 | ₹19,760 |
| 5 | Carriage of pontoons pairs from the place of anchoring down stream side of the bridge to the bridge alignment in water and fixing the same with other pontoons pair of bridge including labour T&P etc. proper completion of the work as per direction of E/I. SOR No. 4 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 1 | Pair | 875 | ₹875 |
| 6 | Additional haulage of Pontoon in River Per Km. SOR No. 5 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 6 | Pair | 800 | ₹4,800 |
| 7 | Cartage of Pontoons in shallow water or even in dry bed by rolling after disconnecting pontoons pair and then rolling and fixing the same to bridge alignment including all labour T&P etc. proper completion of the work as per direction of E/I. SOR No. 6 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 4 | Pair | 3,370 | ₹13,480 |
| 8 | Sinking of Pontoons to obtain the proper gradient as laid in dry bed by digging earth including all labour T&P etc. proper completion of the work as per direction of Engineer-in-charge.SOR No. 7 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 2 | Nos. | 985 | ₹1,970 |
| 9 | Laying of Iron anchor (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 3 | Nos. | 55 | ₹165 |
| 10 | Fixing of railing post in position incluiding making 16 mm dia. 25 cm deep hole with the help of Generator and Drill machine over sleeper and all sal edging before fixing the railing post with help of 300X16 mm size nut & bolt at 1.25 mtr. c/c in bridge including all labour, T&P as required as per direction of E/I. SOR No. 8 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) | 176 | Nos. | 32 | ₹5,632 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2231954.xls
BOQ • 0.28 MB
T1pantoonbhitari.pdf
Tender Documents • 2.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .