| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 LAdmitted-Finance THIS INFORMATION IS NOT AVAILABLE IN THE PROVIDED DOCUMENT | KAMRUP METRO | ASSAM | 781005 | ₹35.0 L | L1 | Admitted-Finance |
| 2 | L2₹37.4 LAdmitted-Finance | ₹37.4 L | L2 | Admitted-Finance |
| 3 | L3₹37.7 LAdmitted-Finance RANGIYA DIST KAMRUP ASSAM 781365 | BAKSA | ASSAM | 781365 | ₹37.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SITAL BUILDERS L2 | M/S NARAYAN ENTERPRISE L3 | M/s Narzary Enterprise L1 |
|---|---|---|---|---|---|---|
| 1.00 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) exc. 1.5 sq. m but not exc. 4 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 10 | EACH | 29 ₹290 | 30 ₹300 | 170 ₹1,700 |
| 2.00 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) not exc. 1.5 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 10 | EACH | 29 ₹290 | 30 ₹300 | 155 ₹1,550 |
| 3.00 | Taking down Shutters of any description not exc 1 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 20 | PER LEAF | 19 ₹380 | 25 ₹500 | 20 ₹400 |
| 4.00 | Taking down Shutters of any description exc 1 sq. m and not exc 2 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 20 | PER LEAF | 19 ₹380 | 25 ₹500 | 25 ₹500 |
| 5.00 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc., complete all as specified and as directed by Engineer-in-charge. | 80 | SQM | 9 ₹720 | 5 ₹400 | 20 ₹1,600 |
| 6.00 | Demolition of reed, lathing, single or double, including battens and plaster or chicken wire lathing, complete all as specified and as directed by Engineer-in-charge. | 40 | SQM | 4.99 ₹199.60 | 5 ₹200 | 15 ₹600 |
| 7.00 | Hacking out old broken glass (any thickness, size, quality or description) from wooden/steel frames or aluminium, glazed with putty or fixed with beads, complete all as specified and as directed by Engineer-in-charge. | 20 | SQM | 4.99 ₹99.80 | 5 ₹100 | 12 ₹240 |
| 8.00 | M&L for resecuring or easing & adjusting without taking down of aluminium partitions/ door/ window Shutters of any description, including refixing/tightening of hinges, handles, tower bolts and other accessories with and including providing new brass CP screws, aluminium snap beading, rubber gasket, etc. (If required), complete all as specified and as directed by Engineer-in-charge. | 6 | EACH JOB | 999 ₹5,994 | 550 ₹3,300 | 25 ₹150 |
| 9.00 | M&L for 2nd class hard wood in scantling wrought timber unframed and fixed, including dismantling the existing old damaged scantling, complete all as specified and as directed by Engineer-in-charge. | 4 | CUM | 39,999 ₹1.6 L | 26,800 ₹1.1 L | 40,000 ₹1.6 L |
| 10.00 | S&F in-repair of second class hard wood plain fillets in square, rectangular or triangular in section, clean sawn, secured with nails or brads of sectional area not exc.3sqcm, complete all as specified and as directed by Engineer-in-charge. | 50 | RM | 39 ₹1,950 | 50 ₹2,500 | 20 ₹1,000 |
Updated dates
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
9 May 2026, 6:00 pmClosed
GE Rangia
GE Rangia C/O 99 APO Rangia
REP/ REPLACEMENT OF DOORS, WINDOWS, WALL CLADING, PLINTH PROTECTION, CEILING, ROOFING, TILING, PLUMBING FITTINGS AND OTHER ALLIED WORKS AT WEST WING OF HATTIGOR MIL STN UNDER GE RANGIA
2026_MES_759970_1
8021/RNG/E8
Open Tender
Civil Works
270 days
HATTIGOR
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE Rangia
₹80,000
Yes
11 May 2026
10 Apr 2026
11 May 2026
10 Apr 2026
9 May 2026
25 Apr 2026
10 Apr 2026 - 17 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) exc. 1.5 sq. m but not exc. 4 sq. m each, complete all as specified and as directed by Engineer-in-charge. | - | EACH | - | - |
| 2 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) not exc. 1.5 sq. m each, complete all as specified and as directed by Engineer-in-charge. | - | EACH | - | - |
| 3 | Taking down Shutters of any description not exc 1 sq. m each, complete all as specified and as directed by Engineer-in-charge. | - | PER LEAF | - | - |
| 4 | Taking down Shutters of any description exc 1 sq. m and not exc 2 sq. m each, complete all as specified and as directed by Engineer-in-charge. | - | PER LEAF | - | - |
| 5 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc., complete all as specified and as directed by Engineer-in-charge. | - | SQM | - | - |
| 6 | Demolition of reed, lathing, single or double, including battens and plaster or chicken wire lathing, complete all as specified and as directed by Engineer-in-charge. | - | SQM | - | - |
| 7 | Hacking out old broken glass (any thickness, size, quality or description) from wooden/steel frames or aluminium, glazed with putty or fixed with beads, complete all as specified and as directed by Engineer-in-charge. | - | SQM | - | - |
| 8 | M&L for resecuring or easing & adjusting without taking down of aluminium partitions/ door/ window Shutters of any description, including refixing/tightening of hinges, handles, tower bolts and other accessories with and including providing new brass CP screws, aluminium snap beading, rubber gasket, etc. (If required), complete all as specified and as directed by Engineer-in-charge. | - | EACH JOB | - | - |
| 9 | M&L for 2nd class hard wood in scantling wrought timber unframed and fixed, including dismantling the existing old damaged scantling, complete all as specified and as directed by Engineer-in-charge. | - | CUM | - | - |
| 10 | S&F in-repair of second class hard wood plain fillets in square, rectangular or triangular in section, clean sawn, secured with nails or brads of sectional area not exc.3sqcm, complete all as specified and as directed by Engineer-in-charge. | - | RM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
8021TENDERDOCUMENT.pdf
Tender Documents • 0.43 MB
BOQ_851240.xls
BOQ • 0.51 MB