Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 CrAccepted-Finance 0 1 MAIN OPP SNM HOSPITAL LADAKH LEH OPP SNM HOSPITAL LEH LEH LEH LADAKH 194101 UDYAM LA 02 0000190 | LEH LADAKH | LADAKH | 194101 | ₹17.7 Cr | L1 | Accepted-Finance Being L1 |
| 2 | L2₹20.3 CrAccepted-Finance | ₹20.3 Cr | L2 | Accepted-Finance Being L2 |
| 3 | L3₹20.5 CrAccepted-Finance 00 YAKUBPUR NEAR PRIMARY SCHOOL YAKUBPUR YAKUBPUR BULANDSHAHR UTTAR PRADESH 203001 | BULANDSHAHR | UTTAR PRADESH | 203001 | ₹20.5 Cr | L3 | Accepted-Finance Being L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical rejected due to short fall of requisite documents |
| 5 | Rejected-Technical A 1305 EMPIRE BUSINESS HUB SCIENCE CITY ROAD SOLA AHMEDABAD GUJARAT 380060 | AHMEDABAD | AHMEDABAD | GUJARAT | 380060 | - | - | Rejected-Technical rejected due to short fall of requisite documents |
Tender Value
Refer Docs
EMD Value
₹43.9 L
Closing Date
6 Aug 2024, 2:00 pmClosed
Chief Engineer, Generation Wing LPDD Leh
Office of Chief Engineer, Generation Wing LPDD UT Ladakh at choglamsar Leh
Design, Supply, Instatllation and Commissioning of Grid Connected / Hybrid Solar Photovoltaic Power Plants on Government Buildings including system warranty and Comprehensive Maintenance Contract (CMC) for Five (05) years in Leh District of UT Ladakh
2024_PDNRE_13057_1
E nit no 02 of 2024-25
Open Tender
Power/Energy Projects/Products
270 days
Leh District
as per SBD
5 documents required · 5 mandatory
₹25,000
Pay and Account Officer PDC Leh
₹43.9 L
Office of Chief Engineer, Generation Wing Leh
21 Aug 2024
15 Jun 2024
7 Aug 2024
18 Jun 2024
6 Aug 2024
3 Jul 2024
29 Jun 2024
Amount
ON GRID MODE
SITC of 3kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 6 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no. (as per requirement). 4) DCDB = 1 no. 5) 3kW, 48 volt MPPT, PCU (inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirment). 8) 1C x 10 sqmm AC Copper cable = 30 mtr (as per requirment). 9) MC4 connectors = 15 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no.(as per requirement) 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement). 14) Solar meter Uni-Directional = 1 no.
SITC of 5kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 10 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no. (as per requirement). 4) DCDB = 1 no. 5) 5kW, 48 volt MPPT, PCU (inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirment). 8) 1C x 10 sqmm AC Copper cable = 30 mtr (as per requirment). 9) MC4 connectors = 15 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no.(as per requirement) 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement). 14) Solar meter Uni-Directional = 1 no.
SITC of 8kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 16 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 8kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 480 mtr (as per requirement). 7) 3.5C x 10 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 24 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 5 no. (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.
SITC of 10kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 10kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 600 mtr (as per requirement). 7) 3.5C x 16 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 30 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 6 no (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.
SITC of 15kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 30 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 15kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 900 mtr (as per requirement). 7) 3.5C x 16 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 45 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 9 no (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 3 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.
SITC of 25kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 50 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 25kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 1500 mtr (as per requirement). 7) 3.5C x 35 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 75 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 15no. (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 5 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.
OFF GRID HYBRID
SITC of 3kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 6 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3kW, 48 V MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 4 no. (Battery bank voltage =48V) 7) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirement). 8) 1C x 10 sqmm AL Copper cable = 30mtr (as per requirement). 9) MC4 connectors = 15 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.
SITC of 5kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 10 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 5 KW, 48 V MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 8 no. (Battery bank voltage =48V) 7) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirement). 8) 1C x 10 sqmm AL Copper cable = 30 mtr (as per requirement). 9) MC4 connectors = 15 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.
SITC of 8kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 16 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase,8kW, (200-850V) MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 8no. (Battery bank voltage =48/96V) 7) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirement). 8) 3.5C x 10 sqmm AL armourd AC cable = 150 mtr (as per requirement). 9) MC4 connectors = 30 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 6 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.
SITC of 10kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 10 kW(200-850V) MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 10 no. (Battery bank voltage =120V) 7) 1C x 4 sqmm DC copper cable = 600 mtr (as per requirement). 8) 3.5C x 10 sqmm AL armourd AC cable = 150 mtr (as per requirement). 9) MC4 connectors = 30 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 6 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.
SITC of 15kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 30 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 15kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6)Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 20 no. (Battery bank voltage =120/240V) 7) 1C x 4 sqmm DC copper cable = 900 mtr (as per requirement). 8) 3.5C x 25 sqmm AL armoured AC cable =150 mtr (as per requirement). 9) MC4 connectors = 45 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 12 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.
RATHORE INFRA PROJECT PRIVATE LIMITED (BID ID -130875)
Shiva Enterprises (BID ID -130923)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf