Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 CrAccepted-Finance 0 1 MAIN OPP SNM HOSPITAL LADAKH LEH OPP SNM HOSPITAL LEH LEH LEH LADAKH 194101 | LEH LADAKH | LADAKH | 194101 | ₹17.7 Cr | L1 | Accepted-Finance Being L1 |
| 2 | L2₹20.3 Cr+₹2.6 Cr (14.9%)Accepted-Finance | ₹20.3 Cr+₹2.6 Cr (14.9%) | L2 | Accepted-Finance Being L2 |
| 3 | L3₹20.5 Cr+₹2.8 Cr (15.7%)Accepted-Finance 0 0 RAMNAGAR FATEHPUR ROAD KADIRABAD GRAM BUDHWAL PARGANA AND TEHSIL RAMNAGAR BARABANKI UTTAR PRADESH 225202 | BARABANKI | UTTAR PRADESH | 225202 | ₹20.5 Cr+₹2.8 Cr (15.7%) | L3 | Accepted-Finance Being L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical rejected due to short fall of requisite documents |
| 5 | Rejected-Technical A 1305 EMPIRE BUSINESS HUB SCIENCE CITY ROAD SOLA AHMEDABAD GUJARAT 380060 | AHMEDABAD | AHMEDABAD | GUJARAT | 380060 | - | - | Rejected-Technical rejected due to short fall of requisite documents |
Tender Value
Refer Docs
EMD Value
₹43.9 L
Closing Date
6 Aug 2024, 2:00 pmClosed
Chief Engineer, Generation Wing LPDD Leh
Office of Chief Engineer, Generation Wing LPDD UT Ladakh at choglamsar Leh
Design, Supply, Instatllation and Commissioning of Grid Connected / Hybrid Solar Photovoltaic Power Plants on Government Buildings including system warranty and Comprehensive Maintenance Contract (CMC) for Five (05) years in Leh District of UT Ladakh
2024_PDNRE_13057_1
E nit no 02 of 2024-25
Open Tender
Power/Energy Projects/Products
Turn-key
270 days
Leh District
as per SBD
5 documents required · 5 mandatory
₹25,000
Pay and Account Officer PDC Leh
₹43.9 L
Office of Chief Engineer, Generation Wing Leh
21 Aug 2024
15 Jun 2024
7 Aug 2024
18 Jun 2024
6 Aug 2024
3 Jul 2024
29 Jun 2024
Amount
ON GRID MODE
SITC of 3kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 6 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no. (as per requirement). 4) DCDB = 1 no. 5) 3kW, 48 volt MPPT, PCU (inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirment). 8) 1C x 10 sqmm AC Copper cable = 30 mtr (as per requirment). 9) MC4 connectors = 15 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no.(as per requirement) 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement). 14) Solar meter Uni-Directional = 1 no.
SITC of 5kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 10 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no. (as per requirement). 4) DCDB = 1 no. 5) 5kW, 48 volt MPPT, PCU (inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirment). 8) 1C x 10 sqmm AC Copper cable = 30 mtr (as per requirment). 9) MC4 connectors = 15 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no.(as per requirement) 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement). 14) Solar meter Uni-Directional = 1 no.
SITC of 8kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 16 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 8kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 480 mtr (as per requirement). 7) 3.5C x 10 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 24 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 5 no. (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.
SITC of 10kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 10kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 600 mtr (as per requirement). 7) 3.5C x 16 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 30 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 6 no (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.
SITC of 15kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 30 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 15kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 900 mtr (as per requirement). 7) 3.5C x 16 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 45 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 9 no (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 3 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.
SITC of 25kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 50 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 25kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 1500 mtr (as per requirement). 7) 3.5C x 35 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 75 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 15no. (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 5 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.
OFF GRID HYBRID
SITC of 3kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 6 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3kW, 48 V MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 4 no. (Battery bank voltage =48V) 7) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirement). 8) 1C x 10 sqmm AL Copper cable = 30mtr (as per requirement). 9) MC4 connectors = 15 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.
SITC of 5kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 10 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 5 KW, 48 V MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 8 no. (Battery bank voltage =48V) 7) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirement). 8) 1C x 10 sqmm AL Copper cable = 30 mtr (as per requirement). 9) MC4 connectors = 15 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.
SITC of 8kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 16 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase,8kW, (200-850V) MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 8no. (Battery bank voltage =48/96V) 7) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirement). 8) 3.5C x 10 sqmm AL armourd AC cable = 150 mtr (as per requirement). 9) MC4 connectors = 30 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 6 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.
SITC of 10kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 10 kW(200-850V) MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 10 no. (Battery bank voltage =120V) 7) 1C x 4 sqmm DC copper cable = 600 mtr (as per requirement). 8) 3.5C x 10 sqmm AL armourd AC cable = 150 mtr (as per requirement). 9) MC4 connectors = 30 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 6 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.
SITC of 15kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 30 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 15kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6)Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 20 no. (Battery bank voltage =120/240V) 7) 1C x 4 sqmm DC copper cable = 900 mtr (as per requirement). 8) 3.5C x 25 sqmm AL armoured AC cable =150 mtr (as per requirement). 9) MC4 connectors = 45 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 12 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.
RATHORE INFRA PROJECT PRIVATE LIMITED (BID ID -130875)
Shiva Enterprises (BID ID -130923)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .