Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.7 LAdmitted-Fee/PreQual/Technical/Finance | -31.73% | ₹8.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.0 L+₹1.3 L (14.6%)Admitted-Fee/PreQual/Technical/Finance | -21.76% | ₹10.0 L+₹1.3 L (14.6%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.2 L+₹1.5 L (17.7%)Admitted-Fee/PreQual/Technical/Finance | -19.67% | ₹10.2 L+₹1.5 L (17.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹10.9 L+₹2.3 L (26.0%)Admitted-Fee/PreQual/Technical/Finance | -14.00% | ₹10.9 L+₹2.3 L (26.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.7 L
EMD Value
₹25,440
Closing Date
15 Jul 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISION SRINAGAR MUNICIPAL CORPORATION LAL CHOWK REGAL LANE
Fencing of trc taxi stand 01
2026_HAUDD_314342_13
SHORTTerm NOTICE INVITING ETENDER No. 05 of 2026-2027 Dated 02.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
54 days
trc taxi stand 01
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹605
FA/CAO AC NO 0216010200000007
₹25,440
21 Jul 2026
3 Jul 2026
17 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 4.46 | Cum | 1,725.2 | ₹7,694.39 |
| - | Dismantling Steel Work in built up Sections in Angles, Tees, Flats and channels including gusset plates, bolts, nuts, cutting rivets, welding etc including dismembering and stacking within 50 meters lead | 735.62 | Kgs | 50 | ₹36,781 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 25.66 | Cum | 6,591.25 | ₹1,69,131.48 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 134.72 | Sqm | 286.35 | ₹38,577.07 |
| - | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) | 141.5 | Sqm | 283.8 | ₹40,157.7 |
| - | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete: Hot finished welded type tubes | 632.57 | Kgs | 156.95 | ₹99,281.86 |
| - | Providing, supplying and fixing of antique Victorian vintage type decorative ornamental cast iron grill having area varying from 15 Sft to 20 Sft with a weight varying from 75 Kgs to 100 Kgs per panel including fitting charges with MS tubes by any means as per the direction os engineer in charge complete job | 60 | No. | 14,000 | ₹8,40,000 |
| - | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: two or more coats on steel work | 215.61 | Sqm | 131.85 | ₹28,428.18 |
| - | Carriage of material by mechanical Transport.
Sand/Aggregates | 34.64 | Cum | 344.49 | ₹11,933.13 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1017978.xls
BOQ • 0.30 MB
Andum45-pages.pdf
PDF • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .