Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹12.8 L+₹13,751.04 (1.08%)Rejected-AOC | L2 | Rejected-AOC Reject | |
| 3 | Rejected-Technical 83 MUDUKKU STREET EDAKEELAIYUR NEEDAMANGALAM | MAYILADUTHURAI | TAMIL NADU | 609204 | - | Rejected-Technical Withdrawal Letter Sumitted |
| Sl No | Description | Qty | Unit | Venkatachalam J L2 | BALAJI K L1 |
|---|---|---|---|---|---|
| 1.001.REPAIRS TO PUE SCHOOL BUILDING NORTH FACING EIGHT CLASS ROOM RCC BUILDING (G+1) AT AGARAPOTHAKKUDI IN AYIKUDI PANCHAYAT | |||||
| 2.00 | Dismantling th existing damaged weathering course and tiles and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers. | 186.96 | sq.m | 45.98 ₹8,596.42 | 45.9 ₹8,581.46 Lowest |
| 3.00 | Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers. | 0.25 | sq.m | 7.98 ₹2 | 7.9 ₹1.98 Lowest |
| 4.00 | Chipping the existing damaged flooring and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers. | 46.36 | sq.m | 40.37 ₹1,871.55 | 40.36 ₹1,871.09 Lowest |
| 5.00 | Earth work excavation and all class of soil sub soil inlcuding cost and conveynace and all other labour charges etc., completed as per std., specification | 0.5 | cum | 246.52 ₹123.26 | 246.5 ₹123.25 Lowest |
| 6.00 | CC 1:4:8 mix using 40mm ISS metal from approved quarry to work site including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers | 0.17 | cum | 5,977.55 ₹1,016.18 Lowest | 5,977.5 ₹1,016.18 Lowest |
| 7.00 | Brick work in CM 1:5 mix using country bricks of size 8¾x4¼x2¾ including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers | 0.25 | cum | 6,097.98 ₹1,524.5 | 6,097.9 ₹1,524.48 Lowest |
| 8.00 | Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers. | 1.36 | sq.m | 277.61 ₹377.55 | 277.6 ₹377.54 Lowest |
| 9.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 42.23 | sq.m | 176.86 ₹7,468.8 | 176.8 ₹7,466.26 Lowest |
| 10.00 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. | 14.02 | sq.m | 3,867.12 ₹54,217.02 | 3,867 ₹54,215.34 Lowest |
Tender Value
₹12.8 L
EMD Value
₹12,820
Closing Date
17 Jul 2025, 3:00 pmClosed
Block Development Officer (B.Pt)
Block Development Office
SIUS 2025 26 Repairs to PUE School Building and PUM School Toilet and PUM Teacher Toilet in Ayikudi Panchayat
2025_RDTN_579377_1
2540/2025/A2
Open Tender
Civil Works
Item Rate
Needamangalam
SIUS 2025 26 Repairs to PUE School Building and PUM School Toilet and PUM Teacher Toilet in Ayikudi Panchayat
3 documents required · 3 mandatory
₹0
₹12,820
7 Oct 2025
8 Jul 2025
17 Jul 2025
8 Jul 2025
17 Jul 2025
8 Jul 2025
Amount
1.REPAIRS TO PUE SCHOOL BUILDING NORTH FACING EIGHT CLASS ROOM RCC BUILDING (G+1) AT AGARAPOTHAKKUDI IN AYIKUDI PANCHAYAT
Dismantling th existing damaged weathering course and tiles and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Chipping the existing damaged flooring and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Earth work excavation and all class of soil sub soil inlcuding cost and conveynace and all other labour charges etc., completed as per std., specification
CC 1:4:8 mix using 40mm ISS metal from approved quarry to work site including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers
Brick work in CM 1:5 mix using country bricks of size 8¾x4¼x2¾ including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of Machine pressed tiles of size 23x23x2cm in 1:3 12mm thick using WCC
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Blackboard Painting two coats over oldcement plastered surface with best approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete
Supply and Fixing of PVC Rain water Down fall Pipe 110mm
Repairs to window.
Repairs to Door.
Provision for Bala Painting
Providing Chappal Rack Arrangements (SUB ESTIMATE)
BriCK work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Students Cubboard (Sub Estimate)
BriCK work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Spring Bundal
Provision for Display Board
Provision for Name Board
2.REPAIRS TO P.U.M. SCHOOL GIRLS TOILET BUILDING AT AGARAPOTHAKKUDI IN AYIKUDI PANCHAYAT
Chipping the excisting damaged flooring Surface Including cost and conveyance etc. complete.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
White washing two coats using best shell lime incluiding cost and conveynace and all labour charges etc., completed as per std., specification
Supplying and painting the walls with Two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat old iron Works including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for Repair to Toilet Door Charges
Supplying and fixing of GI sheet roofing including cost and conveyance and all labour charges etc., completed as per std., specification
Provision for Water supply arrangement & Sanitary arrangement
Provision for septic tank Cover slab
Towards Name board charges
3.REPAIRS TO P.U.M. SCHOOL TEACHER TOILET BUILDING (N/F) AT AGARAPOTHAKKUDI IN AYIJUDI PANCHAYAT
Dismantling the excisting damaged wall plastering Including cost and conveyance etc. complete.
Chipping the excisting damaged flooring Surface Including cost and conveyance etc. complete.
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
White washing two coats using best shell lime incluiding cost and conveynace and all labour charges etc., completed as per std., specification
Supplying and painting the walls with Two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Painting two Coat old iron Works including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Provision for Repair to Toilet Door Charges
Provision for Water supply arrangement & Sanitary arrangement
Provision for Cleaning septic tank
Towards Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Venkatachalam J (BID ID -1402956)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .