| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.9 LAccepted-AOC 308 WARD NO 1 KRISHNA NAGAR DISTT HAMIRPUR HP | HAMIRPUR | HAMIRPUR | HP | 1 | Accepted-AOC L1 | |
| 2 | 2₹5.0 L+₹2,380.06 (0.48%)Rejected-AOC 1386 4 GULLIANA NEW DELHI CENTRAL DELHI 110006 | NEW DELHI | CENTRAL DELHI | DELHI | 110006 | 2 | Rejected-AOC L2 | |
| 3 | 3₹5.1 L+₹10,368.66 (2.09%)Rejected-AOC 1301 3 SHASTRI NAGAR MEERUT U P 250004 | MEERUT | UTTAR PRADESH | 250004 | 3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹4,220
Closing Date
26 May 2023, 3:30 pmClosed
Resident Engineer
Resident Engineer, Andhra Power House, Division, HPSEBL, Chirgaon.171208.
Repair of submersible pump ,Cooling Motors ,and Re-babiting of 40 Nos.thrust pads of thrust cum guide bearing of 2x1.5MW Gumma Power House under Andhra Power House Division HPSEBL, Chirgaon
2023_HPSEB_73691_1
APHD/DB-E tendering-2023-24-4011-15 dated 20.05.23
Limited
Power/Energy Projects/Products
Item Wise
45 days
Chirgaon
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
₹4,220
Yes
24 Jun 2023
20 May 2023
27 May 2023
20 May 2023
26 May 2023
20 May 2023
Amount
O&M OF Gumma Power House
Repair of Submersible pump, cooling motor and Re-babiting of 40 Nos Thrust pads of thrust cum guide bearing with white metal confirming to IS 25, grade 84 along with tapered washer and lock of pads(washer and lock as per sample) of 2x1.5MW Gumma Power House under Andhra Power House Division HPSEBL, Chirgaon The job consists of following works; - Job-I Repair of Submersible Pump Motor Specification of Submersible Pump Motor HP 2.5 Voltage 380 Frequency 50 Hz RPM 2850 LPM 300 i) Dismantling the submersible pump complete. ii) Replacement of all the worn out parts of submersible pump with new parts . iii) Re-winding of motor by replacing the burnt motor iv) Replacement of bearing with new ones and replacement and replacement of new check nut washer and locking ring. iv) Balance of rotor. v) Varnish of stator winding along with insulating paper and warmish etc. v) Assembly, alignment and testing of motor at required load and painting the same with epoxy paint.
Job- II . Repair od induction motor Cooling Capacity 2.2 KW, 3 HP, RPM 2840 ,415 Volt i) Dismantling the submersible pump complete. ii) Replacement of all bearing with new one iii) Re –winding of motor by replacing the burnt winding. iv) Balance the Rotor. v) Assembly, alignment and testing of motor at required load and paintingthe same with epoxy paint
Job-III Re-babiting of 40 Nos. Thrust Pads:- i) Removal of old damaged babit material from the shell. ii) Re-babiting of Thrust Pads. iii) Pouring of white metal after maintaining the temperature of 3500 to 4000 of white metal iv) Casting of shell with white metal of IS 25 Gr. 84 composition v) Thickness of white metal should be 3 mm to 5 mm. vi) Turning machining chipping so as to standard dimensions and finally U.T./D.P. test is to be conducted on the thrust padsso that there should not be any defect in the pads. Tapered washer along with lock must be provided in spare for all the thrust pads washer and lock should be high quality
Packaging of all material and loading of material , transportation of material, unloading of material, transit insurance of material from site ( Gumma Power House ) to the Works of bidder and back to the Power House.
R.R. SALES CORPORATION
V.L. ELECTRICALS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_110716.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .