| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.3 CrAdmitted-Finance 175 2 SOUTH STATE BANK NAGAR CHETTIPALAYAM ERODE TAMIL NADU 638002 | ERODE | TAMIL NADU | 638002 | ₹90.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹100.9 CrAdmitted-Finance NAMAKKAL | ₹100.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹102.0 CrAdmitted-Finance 29 A P T C ROAD NEAR BUS STAND MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | ₹102.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹102.3 CrAdmitted-Finance | ₹102.3 Cr | L4 | Admitted-Finance |
| 5 | L5₹103.7 CrAdmitted-Finance | ₹103.7 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PSK ENGINEERING CONSTRUCTION AND CO L4 | Ramalingam Construction Company Pvt Ltd L1 | Sri Balaji Constructions L7 | V SATHYAMOORTHY CO L8 | R R THULASI BUILDERS INDIA P LTD L6 | RPP INFRA PROJECTS LIMITED L9 | GRM CONSTRUCTIONS L2 | M/s Tharun Construction & Co L5 | SAI HRIDHAM INFRAA LIMITED L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the Engineer with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the Engineer.- Upto required Footing Depth. Data worked out for 48 m3 per day/8 hrs. | ||||||||||||
| 1.01 | With intial lead of 10 m and Intial lift of 2.40 m | 10,705.03 | M3 | 306 ₹32,75,739 | 112 ₹11,98,963 Lowest | 400 ₹42,82,012 | 500 ₹53,52,515 | 405 ₹43,35,537 | 515 ₹55,13,090 | 408 ₹43,67,652 | 300 ₹32,11,509 | 330 ₹35,32,660 |
| 1.02 | With intial lead of 10 m and additional lift of 2.40-3.40 m | 652.9 | M3 | 354 ₹2,31,127 | 130 ₹84,877 Lowest | 450 ₹2,93,805 | 500 ₹3,26,450 | 405 ₹2,64,425 | 507 ₹3,31,020 | 414.6 ₹2,70,692 | 350 ₹2,28,515 | 336 ₹2,19,374 |
| 2.00 | Supplying and filling in foundation, basement, etc with Quarry Dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the Engineer. | 1,201.34 | M3 | 900 ₹10,81,206 | 1,770 ₹21,26,372 | 500 ₹6,00,670 | 500 ₹6,00,670 | 460 ₹5,52,616 | 504 ₹6,05,475 | 412 ₹4,94,952 | 500 ₹6,00,670 | 354 ₹4,25,274 Lowest |
| 3.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the Engineer in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the Engineer. | 1,859.04 | M3 | 94 ₹1,74,750 | 83 ₹1,54,300 | 50 ₹92,952 Lowest | 60 ₹1,11,542 | 60 ₹1,11,542 | 66 ₹1,22,697 | 51 ₹94,811 | 125 ₹2,32,380 | 51 ₹94,811 |
| 4.00 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the Engineer. | 614.5 | M3 | 2,200 ₹13,51,900 | 2,360 ₹14,50,220 | 2,500 ₹15,36,250 | 2,500 ₹15,36,250 | 2,800 ₹17,20,600 | 2,550 ₹15,66,975 | 2,008 ₹12,33,916 | 1,500 ₹9,21,750 Lowest | 1,770 ₹10,87,665 |
| 5.00 | Cement Concrete 1:4:8 (One Cement, Four crushed stone sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the Engineer - Mixing by mechanical means | 1,273.09 | M3 | 7,250 ₹92,29,903 | 6,800 ₹86,57,012 | 6,500 ₹82,75,085 | 7,500 ₹95,48,175 | 6,820 ₹86,82,474 | 7,770 ₹98,91,909 | 6,102 ₹77,68,395 | 6,500 ₹82,75,085 | 5,900 ₹75,11,231 Lowest |
| 6.00 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost of centering shuttering reinforcement grills and fabrication charges but including Cost of Mortar Plasticizer, curing etc. complete and as directed by the Engineer. (Dummy columns should be at least 1 metre height)- Mixing by mechanical means | 394 | M3 | 7,500 ₹29,55,000 | 6,800 ₹26,79,200 Lowest | 7,000 ₹27,58,000 | 8,500 ₹33,49,000 | 7,080 ₹27,89,520 | 8,780 ₹34,59,320 | 6,898 ₹27,17,812 | 7,000 ₹27,58,000 | 7,080 ₹27,89,520 |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the Engineer.- Mixing by mechanical means | 565.78 | M3 | 8,000 ₹45,26,240 | 7,500 ₹42,43,350 | 8,500 ₹48,09,130 | 9,000 ₹50,92,020 | 8,565 ₹48,45,906 | 9,500 ₹53,74,910 | 7,480 ₹42,32,034 Lowest | 7,500 ₹42,43,350 | 8,260 ₹46,73,343 |
| 8.00 | Providing and laying in position, Standardised Concrete Mix M-30 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 400 kg/m3 and maximum water cement ratio of 0.45, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m') 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including Conveyance of concrete from batching plant to Work site, Electricity charges and other works & labour cost involved for concrete production, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the Engineer. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). For all Floors | 14,218.96 | M3 | 9,800 ₹13,93,45,808 | 9,200 ₹13,08,14,432 | 10,500 ₹14,92,99,080 | 12,000 ₹17,06,27,520 | 10,075 ₹14,32,56,022 | 11,100 ₹15,78,30,456 | 8,910 ₹12,66,90,934 Lowest | 9,000 ₹12,79,70,640 | 10,030 ₹14,26,16,169 |
Tender Value
Refer Docs
EMD Value
₹1.1 Cr
Closing Date
23 Feb 2026, 4:00 pmClosed
SE, PMU
Superintending Engineer, Project Monitoring Unit, 1st Floor, TNUHDB, No.5 Kamarajar Salai, Chennai - 600 005.
Construction of 719 tenements PS plus 5 floors with development works at Melakottaiyur scheme in Vandalur Taluk at Chengalpattu District
2026_TUHDB_646481_1
IRSHUPSP/MEL/08
Open Tender
Civil Works
Works
730 days
Chengalpattu
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.1 Cr
Yes
TNUHDB, Chennai
15 Jul 2026
23 Jan 2026
23 Feb 2026
23 Jan 2026
23 Feb 2026
12 Feb 2026
4 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the Engineer with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the Engineer.- Upto required Footing Depth. Data worked out for 48 m3 per day/8 hrs. | |||||
| 1.01 | With intial lead of 10 m and Intial lift of 2.40 m | 10,705.03 | M3 | - | - |
| 1.02 | With intial lead of 10 m and additional lift of 2.40-3.40 m | 652.9 | M3 | - | - |
| 2 | Supplying and filling in foundation, basement, etc with Quarry Dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the Engineer. | 1,201.34 | M3 | - | - |
| 3 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the Engineer in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the Engineer. | 1,859.04 | M3 | - | - |
| 4 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the Engineer. | 614.5 | M3 | - | - |
| 5 | Cement Concrete 1:4:8 (One Cement, Four crushed stone sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the Engineer - Mixing by mechanical means | 1,273.09 | M3 | - | - |
| 6 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost of centering shuttering reinforcement grills and fabrication charges but including Cost of Mortar Plasticizer, curing etc. complete and as directed by the Engineer. (Dummy columns should be at least 1 metre height)- Mixing by mechanical means | 394 | M3 | - | - |
| 7 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the Engineer.- Mixing by mechanical means | 565.78 | M3 | - | - |
| 8 | Providing and laying in position, Standardised Concrete Mix M-30 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 400 kg/m3 and maximum water cement ratio of 0.45, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m') 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including Conveyance of concrete from batching plant to Work site, Electricity charges and other works & labour cost involved for concrete production, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the Engineer. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). For all Floors | 14,218.96 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TechnicalBidMEL.pdf
Tender Documents • 18.63 MB
PriceBids.pdf
Tender Documents • 0.52 MB
BOQ_774945.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].