Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹4.2 Cr+₹45.2 L (12.2%)Rejected-Finance 86 PURUSOTTAM ROY STREET KOLKATA 700007 | KOLKATA | WEST BENGAL | 700007 | ₹4.2 Cr+₹45.2 L (12.2%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹4.7 Cr+₹94.3 L (25.3%)Rejected-Finance | ₹4.7 Cr+₹94.3 L (25.3%) | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
Refer Docs
EMD Value
₹9.3 L
Closing Date
11 Mar 2025, 1:00 pmClosed
THE DIRECTOR GENERAL (WATER SUPPLY)
OFFICE OF THE DIRECTOR GENERAL (WATER SUPPLY) THE KOLKATA MUNICIPAL CORPORATION, 5, S. N. BANERJEE ROAD, KOLKATA-700013
Operation and maintenance of 15 MGD capacity Water Treatment Plant, Clear Water Pumping Station and other installations of phase-III at Garden Reach Water Works.
2025_KMC_810823_1
KMC/WS/GRWW/PH-III/T-01/24-25
Open Tender
Project Work
Item Rate
1096 days
PHASE -III, GRWW
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9.3 L
OFFICE OF THE DIRECTOR GENERAL (WATER SUPPLY)
8 Jul 2025
4 Feb 2025
13 Mar 2025
4 Feb 2025
11 Mar 2025
11 Feb 2025
7 Feb 2025
Amount
Operation & maintenance of 15 MGD capacity Water Treatment Plant, Clear Water Pumping Station and other installations of phase-III at Garden Reach Water Works. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 15 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 15 MGD WTP. (For the period of first 12 months).
Labour component:(37% of Total cost) This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the first increment will be in effect.
Non-labour component: (63% of Total cost) This monthly rate/cost will remain unaltered from the date of commencement of the O&M-work till end of the first twelve months. This also indicates the base-cost upon which monthly cost of second year of O&M-work will be determined.
Operation & maintenance of 15 MGD capacity Water Treatment Plant, Clear Water Pumping Station and other installations of phase-III at Garden Reach Water Works. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 15 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 15 MGD WTP. For the period of Second 12 months.
Labour component: This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequient increment will be in effect.
Non-labour component: This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
Operation & maintenance of 15 MGD capacity Water Treatment Plant, Clear Water Pumping Station and other installations of phase-III at Garden Reach Water Works. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 15 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 15 MGD WTP. For the period of Third 12 months.
Labour component: This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequient (if any) increment will be in effect.
Non-labour component: This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
OM CORPORATION (BID ID -6197135)
Traders and Engineers Private Limited (BID ID -6204638)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .