Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.2 LAccepted-AOC | ₹5.2 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹5.2 L+₹571.89 (0.11%)Rejected-Finance | ₹5.2 L+₹571.89 (0.11%) | L-2 | Rejected-Finance L-2 |
Tender Value
₹5.2 L
EMD Value
₹10,500
Closing Date
20 Oct 2023, 1:00 pmClosed
Executive Engineer
Rapti Nahar Nirman Khand-1, Tulsipur Balrampur
CONSTRUCTION OF WELL AT KM 74.650 ON RIGHT BANK OF RMC
2023_UPIDC_846226_7
01/EE/2023-24
Open Tender
Civil Works
Item Rate
20 days
Tulsipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹10,500
Yes
29 Jan 2025
5 Oct 2023
20 Oct 2023
5 Oct 2023
20 Oct 2023
5 Oct 2023
Amount
CONSTRUCTION OF WELL AT KM 74.650 ON RIGHT BANK OF RMC.
Earth work in making Coffer Dam in canal in front of Head Wall in all types of soils including all lead and lift upto 5 m excluding mechanical compaction but inclusive of manual compaction and proper dressing to profiles.
Earth work in cutting of banks to lay pressure pipes/Kulawa pipes & Wells in all types of soils including all lead and lift upto 5 m excluding mechanical compaction but inclusive of manual compaction and proper dressing to profiles.
E/W in Backfilling of embankment over kulawa Pipes with mechanical compaction & dressing including all cost of labor T&P & etc.
Providing & laying of Plain Cement Concrete in M10 (1:3:6) with cement, Coarse sand of FM not less than 2 from Hamirpur site, crushed stone aggregate from Kabrai Quarry, etc including all the cost of material labor & T&P.
Providing and laying Reinforced Concrete M-25 (1:1.5:3) RCC including all labour material T&P required for proper completion of work.
Providing and binding Steel Reinforcement in R.C.C. works including cutting fixing in position bending etc. required for proper completion of work including all lead lift labour material T&P etc.
Centering & shuttering for R.C.C. Work including all labour material T&P with all lead and lift required for proper competion of work.
Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984/14151/ 12786/13488 with necessary jointing material like mechnical connector i.e. thread/insert joint/ quick relese coupler joint/ compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loding /unloading charges, conveneyence to departmental stores, and stacking the same in closed shade duly protecting from sunrays and rains excluding gst levied by GOI & GOM in all respect etc. complete. (Note:- H.D.P.E. Pipes shall be as per latest IS specifications.)
Dewatering hiring charges of 2 nos of 5 HP Diesel pump/ Gen set /including operator and POL @ 24 hours for 4 days.
Removal of Coffer Dam.
M/S KULDEEP SINGH CONTRACTOR AND SUPPLIERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .