Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC VILLAGE P O AMARPUR TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | L1 | Accepted-AOC WORKAWARD | |
| 2 | L2₹9.9 L+₹32,940 (3.45%)Rejected-Finance TEHSIL BHARMOUR DISTRICT CHAMBA HIMACHAL PRADESH | CHAMBA | HIMACHAL PRADESH | 176207 | L2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical VPO PATLANDER TEHSIL SUJANPUR DISTT HAMIRPUR H P | HAMIRPUR | HIMACHAL PRADESH | 174304 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical VILLAGE BHAMNA KAHANGARH ROAD SAMANA DISTT PATIALA | SAMANA | PATIALA | PUNJAB | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.9 L
EMD Value
₹15,750
Closing Date
22 Feb 2023, 9:00 amClosed
EXECUTIVE ENGINEER
Executive Engineer, Tauni Devi Division, HP.PWD., Tauni Devi
SH PL 2cm thick premix carpet with seal coat at RD 0000 to 0900
2023_PWD_69093_1
PWTDD-GA-NIT-22-23-16911-19 DT. 13.2.2023
Open Tender
Civil Works
Item Rate
60 days
TAUNI DEVI
Please refer Tender documents.
13 documents required · 13 mandatory
₹350
₹15,750
11 Mar 2023
16 Feb 2023
22 Feb 2023
16 Feb 2023
22 Feb 2023
16 Feb 2023
Amount
Providing and applying tack coat with bitumen emulsion using emulsion (RS-1) distributor at the rate of 0.25 to 0.30 kg. (zero point two five to zero point three zero kilogramme) per sqm on the prepared bitumen surfaces cleaned with Hydraulic broom as per technical specification clause 503 as per the direction of the Engineer-in-charge including entire carriage of material within all leads and lfts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government.
2 cm (two centimeter ) premix carpet surfacing with 1.8 cum(one point eight cubic metre) and 0.90 cum (zero point nine zero cubic metre) of stone chippings of 13.2 mm (thirteen point two millimeter) size and 11.2 mm (eleven point two millimeter) size respectively per 100 sqm (one hundred square metre) and 52 kg (fifty two kilograme) and 56 kg (fifty six kilograme) of hot bitumen per cum of stone chippings of 13.2 mm (thirteen point two millimeter) and 11.2 mm (eleven point two millimeter) size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG - 30 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt as per direction of Engineer- in -Charge, including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octroi, royality, Malkana, toll tax,sale tax, GST or other taxes imposed by the Government.
Anoop Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .