Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 LAdmitted-Finance | ₹28.4 L | L1 | Admitted-Finance |
| 2 | L2₹34.1 L+₹5.6 L (19.8%)Admitted-Finance | ₹34.1 L+₹5.6 L (19.8%) | L2 | Admitted-Finance |
| 3 | L3₹38.0 L+₹9.6 L (33.6%)Admitted-Finance | ₹38.0 L+₹9.6 L (33.6%) | L3 | Admitted-Finance |
| 4 | L4₹38.3 L+₹9.9 L (34.7%)Admitted-Finance BAMBOOFLAT SOUTH ANDAMAN | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | ₹38.3 L+₹9.9 L (34.7%) | L4 | Admitted-Finance |
| 5 | L5₹43.0 L+₹14.6 L (51.2%)Admitted-Finance | ₹43.0 L+₹14.6 L (51.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHRI BALAJI ENTERPRISES L3 | JYOTI CONSTRUCTION INCORPORATION L5 | SELVARAJ L4 | A Palswamy L1 | M Mohammed Aslam L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : | ||||||||
| 1.01 | All kinds of soil | 331.3 | cum | 450 ₹1,49,085 | 500 ₹1,65,650 | 400 ₹1,32,520 | 1 ₹331.3 Lowest | 480 ₹1,59,024 |
| 2.00 | Carriage of earth by Mechanical Transport including loading, unloading and stacking with lead of 1.00 Km. | 331.3 | cum | 600 ₹1,98,780 | 800 ₹2,65,040 | 1,200 ₹3,97,560 | 300 ₹99,390 Lowest | 600 ₹1,98,780 |
| 3.00 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. | 1,164.8 | sqm | 210 ₹2,44,608 | 500 ₹5,82,400 | 150 ₹1,74,720 | 100 ₹1,16,480 | 60 ₹69,888 Lowest |
| 4.00Providing, Laying, Spreading and compacting stone aggregate of specified sizes to WBM specification in uniform thickness, hand picking,rolling with 3 wheeled road/vibratory roller 8 - 10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening/ binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | ||||||||
| 4.01 | Subbase with stone aggregate 90 mm to 45 mm including stone screening 13.2 mm size. | 116.48 | cum | 5,100 ₹5,94,048 | 2,500 ₹2,91,200 Lowest | 3,000 ₹3,49,440 | 4,500 ₹5,24,160 | 4,500 ₹5,24,160 |
| 4.02 | Subbase with stone aggregate 63 mm to 45 mm including stone screening 13.2 mm size. | 78.85 | cum | 5,100 ₹4,02,135 | 2,500 ₹1,97,125 Lowest | 3,000 ₹2,36,550 | 4,500 ₹3,54,825 | 4,600 ₹3,62,710 |
| 4.03 | Subbase with stone aggregate 53 mm to 22.4 mm including stone screening 11.2 mm size. | 70.34 | cum | 5,500 ₹3,86,870 | 2,500 ₹1,75,850 Lowest | 3,000 ₹2,11,020 | 4,500 ₹3,16,530 | 4,800 ₹3,37,632 |
| 5.00Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : | ||||||||
| 5.01 | On bituminous surface @ 0.50 Kg / sqm | 885 | sqm | 129 ₹1,14,165 | 180 ₹1,59,300 | 170 ₹1,50,450 | 165 ₹1,46,025 | 82 ₹72,570 Lowest |
Tender Value
₹34.8 L
EMD Value
₹69,646
Closing Date
6 Jul 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer (PRI) South Andaman Division-I No. J/4, Old Councilor Bungalow, Junglighat, Sri Vijaya Puram, South Andaman
Construction of Black Top Road from Village Road to Shambhunath Mondal house Sachin Pal house, Sanjay Biswas house at Bachrapahad Chouldari-05 under Gram Panchayat Chouldari.
2026_RDPRI_23101_1
EE/PRI/SAD-I/RR/2026-27/40
Open Tender
Civil Works - Roads
Works
365 days
Bachrapahad, Chouldari
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer, GPPS
₹69,646
10 Jul 2026
21 May 2026
6 Jul 2026
22 May 2026
6 Jul 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : | |||||
| 1.01 | All kinds of soil | - | cum | - | - |
| 2Carriage of earth by Mechanical Transport including loading, unloading and stacking with lead of 1.00 Km. | |||||
| 3 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. | 1 | sqm | - | - |
| 4Providing, Laying, Spreading and compacting stone aggregate of specified sizes to WBM specification in uniform thickness, hand picking,rolling with 3 wheeled road/vibratory roller 8 - 10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening/ binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | |||||
| 4.01 | Subbase with stone aggregate 90 mm to 45 mm including stone screening 13.2 mm size. | - | cum | - | - |
| 4.02 | Subbase with stone aggregate 63 mm to 45 mm including stone screening 13.2 mm size. | 1 | cum | - | - |
| 4.03 | Subbase with stone aggregate 53 mm to 22.4 mm including stone screening 11.2 mm size. | - | cum | - | - |
| 5Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : | |||||
| 5.01 | On bituminous surface @ 0.50 Kg / sqm | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Document.pdf
Tender Documents • 2.26 MB
BOQ_24490.xls
BOQ • 0.29 MB
Chouldari.pdf
PDF • 0.68 MB
Corrigendum.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .