Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-AOC 0 MANPUR CHITBARAGAON CHITBARAGAON BALLIA UTTAR PRADESH 221713 | BALLIA | UTTAR PRADESH | 221713 | ₹32.3 L Quoted ₹33.1 L | L1 | Accepted-AOC Being L1 bidder |
| 2 | L2₹33.1 L+₹653.94 (0.02%)Rejected-Finance | ₹33.1 L+₹653.94 (0.02%) | L2 | Rejected-Finance Being other than L1 bidder |
| 3 | L3₹33.8 L+₹68,976 (2.08%)Rejected-Finance | ₹33.8 L+₹68,976 (2.08%) | L3 | Rejected-Finance Being other than L1 bidder |
| 4 | L4₹34.8 L+₹1.7 L (5.27%)Rejected-Finance | ₹34.8 L+₹1.7 L (5.27%) | L4 | Rejected-Finance Being other than L1 bidder |
| 5 | L5₹36.5 L+₹3.4 L (10.3%)Rejected-Finance | ₹36.5 L+₹3.4 L (10.3%) | L5 | Rejected-Finance Being other than L1 bidder |
| Sl No | Description | Qty | Unit | CHAND CONSTRUCTION CO L3 | Ankit Sagar L5 | Sanjeev Kumar Verma L4 | NATIONAL TRADING COMPANY L1 | M/S Darshan Kumar L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Sch 'A' Part-I (B/R works)
Demolition of cement concrete (unreinforced) in ground floors and paving n exc 15 cm th (below or above ground level), complete all as specified and directed.
Note: No extra cost shall be borne by Govt in r/o flooring overleaped with tile including screed. Thickness shall be considered as total thickness of overleaping. | 138.02 | Cum | 200 ₹27,604 | 100 ₹13,802 | 60 ₹8,281.2 Lowest | 100 ₹13,802 | 247 ₹34,090.94 |
| 2.00 | Demolition of Reinforced Cement Concrete in Roofs, floors ( other than ground floors), beams, staircases, landings, chajjas, lintel band and similar suspended works(reinforcement cut as required to facilitate demolition), complete all as specified and directed. | 7.3 | Cum | 250 ₹1,825 | 100 ₹730 | 60 ₹438 Lowest | 100 ₹730 | 100 ₹730 |
| 3.00 | Demolition of Brick/stone work built in cement morter of any descrption including all necessary quions arches piilars etc, complete all as specified and directed. | 16.6 | Cum | 200 ₹3,320 | 100 ₹1,660 | 60 ₹996 Lowest | 100 ₹1,660 | 100 ₹1,660 |
| 4.00 | Dismantling of timber scantling 40 sq cm and over in section, in any position, complete all as specified and directed. | 1.94 | Cum | 600 ₹1,164 | 450 ₹873 | 60 ₹116.4 Lowest | 100 ₹194 | 500 ₹970 |
| 5.00 | Dismantling of plain or corrugated steel sheeting or any other type, any gauge, thickness, including Nainital or similar pattern roof coverings, complete all as specified and directed. | 450 | Sqm | 15 ₹6,750 | 20 ₹9,000 | 10 ₹4,500 | 40 ₹18,000 | 7 ₹3,150 Lowest |
| 6.00 | Dismantling of existing false ceiling of any type etc, complete all as specified and directed. | 200 | Sqm | 15 ₹3,000 | 20 ₹4,000 | 10 ₹2,000 Lowest | 10 ₹2,000 Lowest | 10 ₹2,000 Lowest |
| 7.00 | Taking down cement plaster on brick/stone or concrete surfaces including racking out joints hacking for key to any thickness scrubbing down with water etc, complete all as specified and directed.
Note : No extra cost shall be borne by Govt exchequer for any no of layers over leaping of tiles/mosiac finish. | 871 | Sqm | 15 ₹13,065 | 15 ₹13,065 | 10 ₹8,710 | 10 ₹8,710 | 7 ₹6,097 Lowest |
| 8.00 | Taking down chowkhats with shutter (without taking off from shutter) n exc 1.5 sqm each and removing to store, complete all as specified and directed. | 35 | Each | 100 ₹3,500 | 50 ₹1,750 | 10 ₹350 Lowest | 50 ₹1,750 | 100 ₹3,500 |
| 9.00 | Taking down chowkhats with shutter (without taking off from shutter) exc 1.5 sqm and n exc 4 sqm each and removing to store and making good to surface disturbed due taking down, complete all as specified and directed. | 7 | Each | 100 ₹700 | 50 ₹350 | 10 ₹70 Lowest | 50 ₹350 | 120 ₹840 |
| 10.00 | Taking down GI tubing of 15 mm bore and connection and including cleaning for refixing or removel, complete all as specified and directed. | 25 | Rm | 50 ₹1,250 | 35 ₹875 | 10 ₹250 Lowest | 20 ₹500 | 10 ₹250 Lowest |
Tender Value
₹41.2 L
EMD Value
₹82,400
Closing Date
21 May 2026, 6:00 pmClosed
GE 862 EWS
GE 862 EWS PIN-914862 c/o 56 APO
SPECIAL REPAIR TO BLDG NO T-19 AND T-37 AT JHANGER AND SPECIAL REPAIR TO FLOORING IN BLDG NO P-99 AT 201 FD WORKSHOP UNDER AGE BR DETT-A OF GE 862 EWS
2026_MES_762807_1
GER-15/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE 862 EWS
As per NIT
9 documents required · 9 mandatory
₹500
GE 862 EWS
₹82,400
Yes
29 Jun 2026
30 Apr 2026
25 May 2026
30 Apr 2026
21 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sch 'A' Part-I (B/R works)
Demolition of cement concrete (unreinforced) in ground floors and paving n exc 15 cm th (below or above ground level), complete all as specified and directed.
Note: No extra cost shall be borne by Govt in r/o flooring overleaped with tile including screed. Thickness shall be considered as total thickness of overleaping. | 138.02 | Cum | - | - |
| 2 | Demolition of Reinforced Cement Concrete in Roofs, floors ( other than ground floors), beams, staircases, landings, chajjas, lintel band and similar suspended works(reinforcement cut as required to facilitate demolition), complete all as specified and directed. | 7.3 | Cum | - | - |
| 3 | Demolition of Brick/stone work built in cement morter of any descrption including all necessary quions arches piilars etc, complete all as specified and directed. | 16.6 | Cum | - | - |
| 4 | Dismantling of timber scantling 40 sq cm and over in section, in any position, complete all as specified and directed. | 1.94 | Cum | - | - |
| 5 | Dismantling of plain or corrugated steel sheeting or any other type, any gauge, thickness, including Nainital or similar pattern roof coverings, complete all as specified and directed. | 450 | Sqm | - | - |
| 6 | Dismantling of existing false ceiling of any type etc, complete all as specified and directed. | 200 | Sqm | - | - |
| 7 | Taking down cement plaster on brick/stone or concrete surfaces including racking out joints hacking for key to any thickness scrubbing down with water etc, complete all as specified and directed.
Note : No extra cost shall be borne by Govt exchequer for any no of layers over leaping of tiles/mosiac finish. | 871 | Sqm | - | - |
| 8 | Taking down chowkhats with shutter (without taking off from shutter) n exc 1.5 sqm each and removing to store, complete all as specified and directed. | 35 | Each | - | - |
| 9 | Taking down chowkhats with shutter (without taking off from shutter) exc 1.5 sqm and n exc 4 sqm each and removing to store and making good to surface disturbed due taking down, complete all as specified and directed. | 7 | Each | - | - |
| 10 | Taking down GI tubing of 15 mm bore and connection and including cleaning for refixing or removel, complete all as specified and directed. | 25 | Rm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
TD.pdf
Tender Documents • 1.11 MB
BOQ_854466.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .