Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹7.0 CrAWARDED | ₹7.0 Cr | AWARDED |
Tender Value
₹6.7 Cr
EMD Value
₹10.1 L
Closing Date
4 Apr 2025, 9:30 pmClosed
Public Works Department
Improvements to road SH-122 Maharashtra Border to Sedam taluk Handarki road from km 153.20 to 157.20 km in Chincholi taluk of Kalaburgi District. under 5054 SH Road Improvements for the year 2024-25.
PWD/2024-25/RD/WORK_INDENT18624
PWD/2024-25/RD/WORK_INDENT18624
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Sedam
₹5,000
₹10.1 L
26 Mar 2025
26 Mar 2025
7 Apr 2025
3 Apr 2025
1 Apr 2025
Estimates of Pavement
Providing and fixing of typical PMGSY informatory sign
board with Logo as per MORD specifications and drawing.
i) The board will be a composite unit consisting of three
plates of Aluminium Composite M...
Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable ...
Scarifying the existing bituminous road surface to a depth of 50
mm and disposal of scarified material by Mechanical Means using
Hydraulic excavator with in all lifts and lead
Earth work in surface excavation by mechanical means for lowering & leveling
the ground for all works other than foundation in all kinds of soils & upto depth
not exceeding 300mm as per drawing and te...
Loosening, leveling and Compacting original ground supporting
embankment to facilitate placement of first layer of embankment,
scarified to a depth of 150 mm, mixed with water at OMC and then
Construction of Embankment with approved materials deposited at site from
roadway cutting and excavation from drain and foundation of other structures
graded with desired compaction. (Royalty shall be...
Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all
lifts and lead, transportation to site, spreading...
Construction of sub-grade and earthen shoulders with approved
material obtained from borrow pits with all lifts & leads,
transporting to site, spreading, grading to required slope and
compacted to mee...
Construction of Granular Sub-Base of required grading as per
design spreading in uniform layers with motor grader on
prepared surface mixing by mix in place method with front end
loader at OMC and com...
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing
the Material with water at OMC in mechanical mix plant carriage
of mixed Materia...
Providing and applying primer coat with SS1 grade Bitumen
Emulsion on prepared surface of granular base including
cleaning of road surface and spraying primer at the rate of 0.70
kg/m2 using mechanica...
Providing and applying tack coat with RS1 Bituminous Emulsion
using emulsion pressure distributor at the rate of 0.25 kg/m2 on
Granular Surface
Providing and laying Dense Graded Bituminous Macadam with
40/60 TPH capacity HMP using crushed aggregates of specified
grading, premixed with bituminous binder VG-30, @ 4.5 per cent
by weight of total...
Providing and laying Bituminous Concrete with 40/60 TPH
capacity hot mix plant using crushed aggregates of specified
grading, premixed with bituminous binder VG-30, @ 5.4 per
cent of mix and filler, t...
Estimate of Traffic Saftey Measures
Providing and erecting direction and place identification retroreflectorised
sign as per IRC:67:2022 made of high intensity
grade sheeting vide clause 801.3, fixed over aluminium
sheeting, 2 mm thick ...
Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vi...
Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vi...
Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vi...
Providing and laying of hot applied thermoplastic compound
2.5 mm thick including reflectorising glass beads @ 250 g/m2
area, thickness of 2.5 mm is exclusive of surface applied glass
beads as per IRC...
Supplying and Fixing of Molded Shank Raised Pavement
Markers / Cat's Eye made of polycarbonate and ABS moulded
body and reflective panels with micro prismatic lens capable of
providing total internal ...
Reinforced cement concrete M15grade kilometre stone of
standard design as per IRC:8-1980, fixing in position including
painting and printing etc Ordinary kilometer stone (precast)
Reinforced cement concrete M15grade kilometre stone of
standard design as per IRC:8-1980, fixing in position including
painting and printing etc 200 m stone (precast)
Providing Speed Breakers/Raised pedestrian crossings in
Trapezoidal section with 2.5 m Top width and transition length
of 0.8 m length and height of 0.1 m as per IRC 99:2018 using
Dense Bituminous Mac...
Reinforced cement concrete M15 grade boundary pillars of
standard design as per IRC:25, fixed in position including
finishing and lettering but excluding painting
Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution li...
Providing and laying of a reinforced cement concrete pipe duct,
300 mm dia, across the road (new construction), extending
from drain to drain in cuts and toe of slope to toe of slope in fills,
Construction of Two Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 156.25
Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever
Removing all type of Hume Pipes and Stacking including Earthwork
and Dismantling of Masonry Works. Above 600 mm to 900 mm dia
Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution li...
Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all
lifts and lead, transportation to site, spreading...
Back filling behind abutment, wing wall and return wall
complete including compaction as per drawing and Technical
Specification Granular material
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. T...
Addendum I-Percentage Additionalities for Formwork,
Centering & Scaffolding for Culverts (Head walls) add 8%
Laying Reinforced cement concrete pipe NP4/prestressed
concrete pipe for culverts on first class bedding of granular
material in single row including fixing collar with cement mortar
1:2 but excluding...
Providing and laying boulders apron on river bed for protection
against scour with stone boulders weighing not less than 40 kg
each complete as per drawing and Technical specification. Boulder Laid Dr...
Providing and laying Pitching on slopes laid over prepared
filter media including boulder apron laid dry in front of toe
of embankment complete as per drawing and Technical
specifications Stone/Boulde...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tyin...
Reinforced cement concrete M15 grade boundary pillars of
standard design as per IRC:25, fixed in position including
finishing and lettering but excluding painting
Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete surfaces
Construction of Three Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 155.11
Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever
Removing all type of Hume Pipes and Stacking including Earthwork
and Dismantling of Masonry Works. Above 900 mm
Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution li...
Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all
lifts and lead, transportation to site, spreading...
Back filling behind abutment, wing wall and return wall
complete including compaction as per drawing and Technical
Specification Granular material
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. T...
Addendum I-Percentage Additionalities for Formwork,
Centering & Scaffolding for Culverts (Head walls) add 8%
Laying Reinforced cement concrete pipe NP4/prestressed
concrete pipe for culverts on first class bedding of granular
material in single row including fixing collar with cement mortar
1:2 but excluding...
Providing and laying boulders apron on river bed for protection
against scour with stone boulders weighing not less than 40 kg
each complete as per drawing and Technical specification. Boulder Laid Dr...
Providing and laying Pitching on slopes laid over prepared
filter media including boulder apron laid dry in front of toe
of embankment complete as per drawing and Technical
specifications Stone/Boulde...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tyin...
Reinforced cement concrete M15 grade boundary pillars of
standard design as per IRC:25, fixed in position including
finishing and lettering but excluding painting
Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete surfaces
Construction of Four Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 155.83
Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever
Removing all type of Hume Pipes and Stacking including Earthwork
and Dismantling of Masonry Works. Above 900 mm dia
Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution li...
Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all
lifts and lead, transportation to site, spreading...
Back filling behind abutment, wing wall and return wall
complete including compaction as per drawing and Technical
Specification Granular material
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. T...
Addendum I-Percentage Additionalities for Formwork,
Centering & Scaffolding for Culverts (Head walls) add 8%
Laying Reinforced cement concrete pipe NP4/prestressed
concrete pipe for culverts on first class bedding of granular
material in single row including fixing collar with cement mortar
1:2 but excluding...
Providing and laying boulders apron on river bed for protection
against scour with stone boulders weighing not less than 40 kg
each complete as per drawing and Technical specification. Boulder Laid Dr...
Providing and laying Pitching on slopes laid over prepared
filter media including boulder apron laid dry in front of toe
of embankment complete as per drawing and Technical
specifications Stone/Boulde...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tyin...
Reinforced cement concrete M15 grade boundary pillars of
standard design as per IRC:25, fixed in position including
finishing and lettering but excluding painting
Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete surfaces
Construction of Five Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 154.27, 154.63
Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever
Removing all type of Hume Pipes and Stacking including Earthwork
and Dismantling of Masonry Works. Above 900 mm dia
Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution li...
Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all
lifts and lead, transportation to site, spreading...
Back filling behind abutment, wing wall and return wall
complete including compaction as per drawing and Technical
Specification Granular material
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. T...
Addendum I-Percentage Additionalities for Formwork,
Centering & Scaffolding for Culverts (Head walls) add 8%
Laying Reinforced cement concrete pipe NP4/prestressed
concrete pipe for culverts on first class bedding of granular
material in single row including fixing collar with cement mortar
1:2 but excluding...
Providing and laying boulders apron on river bed for protection
against scour with stone boulders weighing not less than 40 kg
each complete as per drawing and Technical specification. Boulder Laid Dr...
Providing and laying Pitching on slopes laid over prepared
filter media including boulder apron laid dry in front of toe
of embankment complete as per drawing and Technical
specifications Stone/Boulde...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tyin...
Reinforced cement concrete M15 grade boundary pillars of
standard design as per IRC:25, fixed in position including
finishing and lettering but excluding painting
Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete surfaces
Estimates for Protection Works
Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution li...
Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all
lifts and lead, transportation to site, spreading...
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. T...
Addendum I-Percentage Additionalities for Formwork,
Centering & Scaffolding for Earth retaining structures add 10%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tyin...
Providing weep holes in Brick masonry/Plain/ Reinforced
concrete abutment, wing wall/ return wall with PVC Pipe
110mm outer dia at 2 kg per m2, extending through the full
width of the structure with s...
Estimates for Field Cds
Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution li...
Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all
lifts and lead, transportation to site, spreading...
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. T...
Addendum I-Percentage Additionalities for Formwork,
Centering & Scaffolding for Culverts (Head walls) add 8%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying reinforced cement concrete pipe NP3
for culverts on first class bedding of granular material in
single row including fixing collar with cement mortar 1:2
but excluding excavation,...
Estimate for periodic routine maintenance activities for 5 years for works
Road Maintenance for 3rd year for road with DBM+BC : as wearing coat Maintenance of Road for 3rd year by Clearing and uprooting Vegetation on either sides of the road, Maintenance of Surface drains fo...
Road Maintenance for 4th year for road with DBM+BC : as wearing coat Maintenance of Road for 4th year by Clearing and uprooting Vegetation on either sides of the road, Maintenance of Surface drains fo...
Road Maintenance for 5th year for road with DBM+BC : as wearing coat Maintenance of Road for 5th year by Clearing and uprooting Vegetation on either sides of the road, Maintenance of Surface drains fo...
Shifting of Electrical Poles
Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. Ordinary Soil
RCC Pole - 9 Mtr Long, 145 Kg WL
(Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785
Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth
PSCC Pole - 9 Mtr Long, 200 Kg WL
(Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018)
as per REC Standards
Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth
11 kV, Special 3 Pin Cross Arm - MS
(Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018)
11 kV, Cross Arm with HT Top Support
(glass reinforced hot pressed SMC compound)
11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod)
DISC Insulator 45 kN Porcelain
Digging of Pit for GUY SET Ordinary Soil
Releasing of Rabbit Conductor
ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM
Stringing of Rabbit Conductor (including pin binding, providing
jumps, dead ending, etc.,)
PG Clamp Rabbit to Rabbit
T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers
LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018)
LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018)
Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole
Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole
1.1 kV Ceramic Pin Insulator (Shell only)
No. 8 Strain Insulator
Spiral Earth Electrode
Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing
a) 200 Amps, Single Break
Labour for 11 kV, GOS
a) 200 Amps, Single Break
A) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm)
Pole base for 9 Mtr Square Pole (650x650x150mm)
Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm)
Guy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement)
Transporation by Head Load where ever there is no
accessability for transporation by vechicle for Poles 25 to 105 Mtr
For ACSR Conductors 25 to 105 Mtr
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot)
NOTE:- Consolidated amount for both loading and unloading. 9 Mtr RCC/PSCC Pole
Fixing of HT/LT Single Top Support
11KV, 5KN Polymeric Pin insulators (24mm Dia FRP Rod) DISC Insulator 45 kN Porcelain
GOS as per IS-9921, IS-1977
174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018)
ESCOM DEPOSITE & SUPERVISION CHARGES
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .