Loading…
Loading…
Tender Value
₹1.1 L
EMD Value
₹2,300
Closing Date
10 Sept 2026, 6:00 pmClosed
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI ROOM
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction P/Work NHO Bashir ud Din S/O Ab Aziz r/o Jamaslan w no 6 Pyt Jamslan A Block Mahore under scheme CDF For the year 2026-27
2026_RDPR_323121_4
e-NIT No. 150 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
REASl
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹2,300
Yes
2 Sept 2026
2 Sept 2026
11 Sept 2026
2 Sept 2026
10 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 4.88 | cum | 673.3 | ₹3,285.7 |
| 2 | P/L dry stone agg | 2.48 | cum | 1,500 | ₹3,720 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 80 % concrete | 9.12 | cum | 5,733.6 | ₹52,290.43 |
| 4 | 20% boulder | 3.48 | Cum | 937 | ₹3,260.76 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. including all leads, lift and carriage complete | 2.85 | Cum | 218.4 | ₹622.44 |
| 6 | Centring and shuttering including strutting propping etc and removal of formwork for: walls any thickness | 19 | sqm | 286.14 | ₹5,436.66 |
| 7 | Construction of CIB (includes concrete Pedestrial/Brick 3*2, Plastering,Painting complete job as per direction of Engineer in charge | 1 | No. | 3,000 | ₹3,000 |
| 8 | Carriage of cement from an avg. distance of 25 K.M by MT & 500 M by AT | 2.51 | MT | 753.39 | ₹1,891.01 |
| 9 | Carriage of sand & aggregates from an avg. distance of 25 K.M by MT & 500 Meter by AT | 16.56 | Cum | 1,611.02 | ₹26,678.49 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_1086579.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .