Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC | ₹19.9 L Quoted ₹4.3 L | L1 | Accepted-AOC Approved |
| 2 | L2₹10.5 L+₹6.2 L (143.2%)Rejected-Finance | ₹10.5 L+₹6.2 L (143.2%) | L2 | Rejected-Finance Above Estimate |
| Sl No | Description | Qty | Unit | FINE AIR SYSTEM L1 | GREEN ENVIRO SYSTEM L2 |
|---|---|---|---|---|---|
| 1.00 | LPG Burner - SEMI AUTOMATIC Operated for LPG Crematorium - for Option II Supply:
we design, supply and fixing of manually operated lpg burners with auto ignition system, regulators, adaptors ncvs, fecvs, pressure switches, pressure gauges, nrvs, flange sets and other accessories lpg supply to the burners will be sourced from cylinder manifold system with grouping cylinders and through ms pipes
supply and fixing of control panel mcb contractor overload relays push button unit on/off switches indicatting lambs, 1 point temperature controller and meter and panel board to all burners and motor cable work with materials.
automatic burners -4nos | 1 | No | 8,19,200 ₹8,19,200 Lowest | 8,19,600 ₹8,19,600 |
| 2.00 | FURNACE SERVICE WORK
old crematorium furnace fully service work remove the old casting body brick and resetting casting body bricks with materials castable and aquoset - 50 and fire clay and blanket etc.. The Front side of the Furnance will be covered by moving MS Fabricated Door Filled with ceramic blankets of 64kg/m3 Density. Door Operation is of Manuel Main Door Shaft and Bearing and Chian sparket and chain etc | 1 | No | 2,19,070 ₹2,19,070 Lowest | 2,19,570 ₹2,19,570 |
| 3.00 | PIPE LINE FROM SS SCRUBBER TO CHIMNEY
we design and supply the ms pipe line to send the flue gas furnace to scrubber the pipe line inside weldmesh support and castable insulaction work with materials and cleaned flue gas from ss scrubber to blower & blower to chimmney | 1 | No | 1,78,950 ₹1,78,950 Lowest | 1,79,450 ₹1,79,450 |
| 4.00 | Double throat SS VENTURE SCRUBBER AND WET SCRUBBER - as per TNPCB norms
we design, supply and erect double throat ss venture and wet scrubbing arrangement after the furnace capable of removing fine dust particles through wet washing.
the venture scrubber shall be connected to a wash column for gas wash water seperation the venture scrubber shall be ss of 2.5 mm thick plate suitably manufactured and tested at fabrication shop 6 nos of water bozzle, inner side filter ceramic layer centrifugal pump of suitable to circulate to mild alkaline water through the vebture scrubber at a rate of bot less than 2lit/s with a discharge pressure head of (3kg/cm2min) in the | 1 | No | 4,12,500 ₹4,12,500 | 4,12,000 ₹4,12,000 Lowest |
| 5.00 | SERVICE WORK AND LABOUR
crematorium old machine dismandling work and new machine erection and labour and tansport and accommodation | 1 | No | 1,59,035 ₹1,59,035 Lowest | 1,59,535 ₹1,59,535 |
| 6.00 | PAINTING WORK
crematorium furnance side frame and trollery surubber unit and pipeline and 100 feet chimney cleaning painting work with materials | 1 | No | 99,005 ₹99,005 Lowest | 99,505 ₹99,505 |
| 7.00 | ID BLOWER
we design supply and erect 5hp id blower - ss to exhaust the flue gas to chimney after the flue cooled and cleaned in the ss venture scrubber | 1 | No | 1,05,790 ₹1,05,790 Lowest | 1,06,290 ₹1,06,290 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
24 Feb 2025, 3:00 pmClosed
Executive Officer
Town Panchayat Office Harur
Maintenance Work of LPG Crematorium at Varunatheertham in Harur Town Panchayat
2025_DTP_526669_1
74/2025/A1
Open Tender
Civil Works
Works
Harur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,000
23 Sept 2025
21 Feb 2025
24 Feb 2025
21 Feb 2025
24 Feb 2025
21 Feb 2025
Amount
LPG Burner - SEMI AUTOMATIC Operated for LPG Crematorium - for Option II Supply: we design, supply and fixing of manually operated lpg burners with auto ignition system, regulators, adaptors ncvs, fecvs, pressure switches, pressure gauges, nrvs, flange sets and other accessories lpg supply to the burners will be sourced from cylinder manifold system with grouping cylinders and through ms pipes supply and fixing of control panel mcb contractor overload relays push button unit on/off switches indicatting lambs, 1 point temperature controller and meter and panel board to all burners and motor cable work with materials. automatic burners -4nos
FURNACE SERVICE WORK old crematorium furnace fully service work remove the old casting body brick and resetting casting body bricks with materials castable and aquoset - 50 and fire clay and blanket etc.. The Front side of the Furnance will be covered by moving MS Fabricated Door Filled with ceramic blankets of 64kg/m3 Density. Door Operation is of Manuel Main Door Shaft and Bearing and Chian sparket and chain etc
PIPE LINE FROM SS SCRUBBER TO CHIMNEY we design and supply the ms pipe line to send the flue gas furnace to scrubber the pipe line inside weldmesh support and castable insulaction work with materials and cleaned flue gas from ss scrubber to blower & blower to chimmney
Double throat SS VENTURE SCRUBBER AND WET SCRUBBER - as per TNPCB norms we design, supply and erect double throat ss venture and wet scrubbing arrangement after the furnace capable of removing fine dust particles through wet washing. the venture scrubber shall be connected to a wash column for gas wash water seperation the venture scrubber shall be ss of 2.5 mm thick plate suitably manufactured and tested at fabrication shop 6 nos of water bozzle, inner side filter ceramic layer centrifugal pump of suitable to circulate to mild alkaline water through the vebture scrubber at a rate of bot less than 2lit/s with a discharge pressure head of (3kg/cm2min) in the
SERVICE WORK AND LABOUR crematorium old machine dismandling work and new machine erection and labour and tansport and accommodation
PAINTING WORK crematorium furnance side frame and trollery surubber unit and pipeline and 100 feet chimney cleaning painting work with materials
ID BLOWER we design supply and erect 5hp id blower - ss to exhaust the flue gas to chimney after the flue cooled and cleaned in the ss venture scrubber
GREEN ENVIRO SYSTEM (BID ID -1257136)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .