Loading…
Loading…
Tender Value
₹50.0 L
EMD Value
₹5.0 L
Closing Date
14 Jul 2026, 1:00 pmClosed
Executive Officer
NPP MAU
WARD NO 19 SALAHABAD ME ARAZI NO 03 ME POKHARE KA NIRMAN KA KARYA
2026_DOLBU_1152353_1
69-19
Open Tender
Civil Works
Percentage
180 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,080
Executive Officer
₹5.0 L
23 May 2026
23 May 2026
14 Jul 2026
23 May 2026
14 Jul 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing cost of dewatering including
cost of boaring, laying of 4" dia PVC Pipe,
Hire charges of 7.5 K.V. Diesel pumping
set, hire charges of pvc pipe and cost of 4"
dia plastic pipe for disposal of water as
required distance also including wages of
repairing leakage during operation with
hire charges of tractor including loading
and unloading of pumping set. Work S.I.
No. NSI A | 300 | HRS | 150 | ₹45,000 |
| 2 | E/W in excavation in foundation with hard mixed soil etc all complete.
S.I. No 251 | 256.73 | CUM | 115 | ₹29,523.95 |
| 3 | C.C. Work in 1:6:12 in cement, fine sand
and 40 mm Gauge Brick Ballast including
labour and matrials , T/P with all com.
Work SI No. 273 | 16 | CUM | 3,250 | ₹52,000 |
| 4 | E/W in filling including cutting cartage up to 8.00 km etc all complete. | 1,450.22 | CUM | 301 | ₹4,36,516.22 |
| 5 | RCC work in Raft Foundation & Footing
with cement approved coarse sand &
20mm gauge dala stone grit in the
proportion of 1:1.5:3 S.I. No. 287 | 20.25 | CUM | 7,070 | ₹1,43,167.5 |
| 6 | RCC work in Column with cement approved
coarse sand & 20mm gauge dala stone grit in
the proportion of 1:1.5:3 S.I. No. 289 | 15.09 | CUM | 7,170 | ₹1,08,195.3 |
| 7 | RCC work in Column with cement approved
coarse sand & 20mm gauge dala stone grit in
the proportion of 1:1.5:3 S.I. No. 286 b | 12.1 | CUM | 9,690 | ₹1,17,249 |
| 8 | RCC work in Slab with cement approved
coarse sand & 20mm gauge dala stone grit
in the proportion of 1:1.5:3 S.I. No. 288 | 116.64 | CUM | 8,680 | ₹10,12,435.2 |
| 9 | MS work in R.C.C. work including
labour and matrials , T/P with all com.
Work SI No.504 | 128.8 | QNTL | 5,650 | ₹7,27,720 |
| 10 | M-150 B/W in 1:4 in cement and coar sand
mortar including labour and matrials , T/P
with all com. Work SI No.305 | 202.43 | CUM | 4,980 | ₹10,08,101.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
tech69.pdf
Tender Documents • 2.13 MB
BOQ_2158718.xls
BOQ • 0.26 MB
corridate2.pdf
PDF • 0.16 MB
corridate6901.pdf
PDF • 0.15 MB
corridate69.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .