Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.2 CrAccepted-Finance 308 302 1ST FLOOR LABH CHAMBERS STATION ROAD CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | L1 | Accepted-Finance Accept | |
| 2 | L2₹66.6 Cr+₹5.4 Cr (8.80%)Rejected-Finance 1 SANSKRUTI APPARTMENT MURKUTE LANE NEW PANDIT COLONY NASHIK TAL DIST NASHIL | NASHIK | NASHIK | MAHARASHTRA | 422001 | L2 | Rejected-Finance Reject | |
| 3 | L3₹72.1 Cr+₹10.9 Cr (17.8%)Rejected-Finance PLOT NO 1 2 AASHIYANA CO OP SOCIETY N 11 CIDCO AURANGABAD | AURANGABAD | AURANGABAD | MAHARASHTRA | L3 | Rejected-Finance Reject | |
| 4 | Not Admitted-Fee/PreQual/Technical FLAT NO 201 MANOHAR RESIDENCY MODEL COLONY SHIVAJI NAGAR PUNE 411005 | PUNE | PUNE | MAHARASHTRA | 411005 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical B 1 NEELA APARTMENT MANDPESHWAR INDL PREMISES S V P ROAD BORIVALI WEST MUMBAI 400 092 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Wonder Construction L3 | Hi Tech Infra, Aurangabad L1 | Harsh Constructions Pvt Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre) By Mechanical Means | 10,354.13 | One Cubic Metre | 231 ₹23,91,804 | 200 ₹20,70,826 Lowest | 213.01 ₹22,05,533 |
| 2.00 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 Metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.50 metre) By Mechanical Means | 725.02 | One Cubic Metre | 253 ₹1,83,430 | 220 ₹1,59,504 Lowest | 233.58 ₹1,69,350 |
| 3.00 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 Metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift from 1.5 to 3.0 metre.) By Mechanical Means | 3,520.88 | One Cubic Metre | 317 ₹11,16,119 | 260 ₹9,15,429 Lowest | 292.24 ₹10,28,942 |
| 4.00 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 Metre, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.50 metre.) By Mechanical Means | 1,481.94 | One Cubic Metre | 281 ₹4,16,425 | 280 ₹4,14,943 | 259.31 ₹3,84,282 Lowest |
| 5.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 Metre beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etcetera complete. (Lift from 1.50 metre To 3.0 metre) By Mechanical Means | 5 | One Cubic Metre | 584 ₹2,920 | 600 ₹3,000 | 539.21 ₹2,696 Lowest |
| 6.00 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20 centi metre to 30 centi metre breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50 metre to 300 metre inclusive from the site of excavation to the site of deposition as directed. | 9,576.35 | One Cubic Metre | 331 ₹31,69,772 | 300 ₹28,72,905 Lowest | 305.39 ₹29,24,522 |
| 7.00 | Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 22,252.88 | One Square Metre | 119 ₹26,48,093 | 100 ₹22,25,288 Lowest | 110.1 ₹24,50,042 |
| 8.00 | Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per Square Metre of surface area covering ten years guarantee on bond paper. | 8,868.49 | One Square Metre | 120 ₹10,64,219 | 100 ₹8,86,849 Lowest | 111.13 ₹9,85,555 |
| 9.00 | Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per Square Metre of vertical surface area covering 10 years guarantee on bond paper. | 11,291.56 | One Square Metre | 125 ₹14,11,445 | 100 ₹11,29,156 Lowest | 115.25 ₹13,01,352 |
| 10.00 | Providing soling using 80 mili metre size trap metal in 15 centi metre layer including filling voids with Crushed sand/grit, ramming, watering etcetera complete. | 2,606.86 | One Cubic Metre | 2,062 ₹53,75,345 | 1,800 ₹46,92,348 Lowest | 1,904.07 ₹49,63,644 |
Tender Value
₹67.4 Cr
EMD Value
₹33.6 L
Closing Date
16 Oct 2024, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer P.W.D.No.2 Beed
Executive Engineer P.W.D.No.2 Beed
Upgradation of 30 Bedded Sub District Hospital Into 100 Bedded Sub District Hospital and Officers/Staff Quarters at Ashti Tq. Ashti, Dist. Beed (IInd Call)
2024_PWR_1101619_1
PWD_Beed2/3C/2024-25
Open Tender
Civil Works
Item Rate
540 days
Beed
Please refer tender document
2 documents required · 2 mandatory
₹5,900
₹33.6 L
17 Mar 2026
2 Oct 2024
18 Oct 2024
2 Oct 2024
16 Oct 2024
2 Oct 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre) By Mechanical Means | 1 | One Cubic Metre | 100 | ₹99.9 |
| 2 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 Metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.50 metre) By Mechanical Means | 1 | One Cubic Metre | 100 | ₹99.9 |
| 3 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 Metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift from 1.5 to 3.0 metre.) By Mechanical Means | - | One Cubic Metre | 10 | - |
| 4 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 Metre, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.50 metre.) By Mechanical Means | - | One Cubic Metre | 10 | - |
| 5 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 Metre beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etcetera complete. (Lift from 1.50 metre To 3.0 metre) By Mechanical Means | - | One Cubic Metre | 10 | - |
| 6 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20 centi metre to 30 centi metre breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50 metre to 300 metre inclusive from the site of excavation to the site of deposition as directed. | - | One Cubic Metre | 10 | - |
| 7 | Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | - | One Square Metre | 10 | - |
| 8 | Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per Square Metre of surface area covering ten years guarantee on bond paper. | 1 | One Square Metre | 10 | ₹9.99 |
| 9 | Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per Square Metre of vertical surface area covering 10 years guarantee on bond paper. | 1 | One Square Metre | 10 | ₹9.99 |
| 10 | Providing soling using 80 mili metre size trap metal in 15 centi metre layer including filling voids with Crushed sand/grit, ramming, watering etcetera complete. | - | One Cubic Metre | 100 | - |
stage.html
html • 0.05 MB
technical_1923654.pdf
techsummary_1923654.pdf
finance_1923654.pdf
BOQ Comparative Chart
xlsx
finsummary_1923654.pdf
cancelled_1.pdf
pdf • 0.31 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
1_100_Bed_Hospital_Ashti_JV.pdf
Tender Documents • 3.58 MB
BOQ_1923654.xls
BOQ • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .