Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹4,500
Closing Date
1 Oct 2026, 11:00 am4d left
DIVISIONAL FOREST OFFICER BATOTEDIVISIONAL FOREST
DIVISIONAL FOREST OFFICER BATOTE
BOQ
2026_FD_325597_1
RE TENDER NO 17 OF 2025-26
Open Tender
Civil Works
Percentage
MARMAT RANGE
SBD
2 documents required · 2 mandatory
₹300
DIVISIONAL FOREST OFFICER BATOTE
₹4,500
22 Sept 2026
22 Sept 2026
1 Oct 2026
22 Sept 2026
1 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed | 12.37 | Cum | 592.9 | ₹7,334.17 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed | 2.47 | Cum | 940.3 | ₹2,322.54 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift | 10.22 | Cum | 218.4 | ₹2,232.05 |
| 4 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 29 | Sqm | 24.12 | ₹699.48 |
| 5 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) | 21.75 | Cum | 281.3 | ₹6,118.28 |
| 6 | Supplying and stacking at site dump manure from approved source including carriage complete (manure measured in stacks will be reduced by 8% for payment) Screened through sieve of I.S. designation 4.75 mm | 21.75 | Cum | 134.9 | ₹2,934.08 |
| 7 | Spreading of sludge, dump manure or/and good earth in required thickness as per directions of officer in-charge (cost of sludge, dump manure or/and good earth to be paid separately) | 21.75 | Cum | 53.55 | ₹1,164.71 |
| 8 | Mixing earth and sludge or manure in proportion specified or directed by | 21.75 | Cum | 37 | ₹804.75 |
| 9 | Grassing with selection no. 1 grass including watering & maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds & fit for mowing including supplying of good earth if needed (the good earth shall be paid separately.) | 29 | Sqm | 17.98 | ₹521.42 |
| 10 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone Nallah | 30.9 | Cum | 3,262.1 | ₹1,00,798.89 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_1100563.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .