Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹34,800
Closing Date
9 Jul 2026, 2:30 pm
Similar tender results from the same govt authority in the past 3 years.
Comprehensive Annual Maintenance Contract of Air-Conditioning plant of capacity 112 HP (Make: Hitachi) in 1st & 2nd floor of New Building (G+5) at BRSH/SDAH for three (03) years.
ELEG-OT-1343-2026-27
ELEG-OT-1343-2026-27
Open
36 Months
Unknown (Unspecified Location)
₹0
₹34,800
18 Jun 2026
18 Jun 2026
25 Jun 2026
I-Non Schedule (CAMC Work)
Comprehensive Annual Maintenance Contract of 112 HP VRF system AC plant (Make: Hitachi) having top 1 discharge ODU and ceiling suspended IDU complete with all accessories for 1st year. (First floor of new (G+5) building capacity of ODU 16 HP x 2 Nos. + 24 HP x 1 no= Total 56 HP, Second floor of new (G+5) building capacity of ODU 16 HP x 2 Nos. + 24 HP x 1 no= Total 56 HP. Grand Total = 56+ 56= 112 HP) (Total HP= 112 HP) ( 112 HP x 12 months= 1344 HP.month, Assuming 1 HP.month= 1 Job, Hence 1344 HP.month= 1344 job)
Comprehensive Annual Maintenance Contract of 112 HP VRF system AC plant (Make: Hitachi) having top 2 discharge ODU and ceiling suspended IDU complete with all accessories for 2nd year. (First floor of new (G+5) building capacity of ODU 16 HP x 2 Nos. + 24 HP x 1 no= Total 56 HP, Second floor of new (G+5) building capacity of ODU 16 HP x 2 Nos. + 24 HP x 1 no= Total 56 HP. Grand Total = 56+ 56= 112 HP) (Total HP= 112 HP) ( 112 HP x 12 months= 1344 HP.month, Assuming 1 HP.month= 1 Job, Hence 1344 HP.month= 1344 job)
Comprehensive Annual Maintenance Contract of 112 HP VRF system AC plant (Make: Hitachi) having top 3 discharge ODU and ceiling suspended IDU complete with all accessories for 3rd year. (First floor of new (G+5) building capacity of ODU 16 HP x 2 Nos. + 24 HP x 1 no= Total 56 HP, Second floor of new (G+5) building capacity of ODU 16 HP x 2 Nos. + 24 HP x 1 no= Total 56 HP. Grand Total = 56+ 56= 112 HP) (Total HP= 112 HP) ( 112 HP x 12 months= 1344 HP.month, Assuming 1 HP.month= 1 Job, Hence 1344 HP.month= 1344 job)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Advance
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111.pdf Correction
ATTACHMENT
OpenETenderDocument.pdf
ATTACHMENT
LTHTElectricalBooklet.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14_07_20221.pdf
ATTACHMENT
FormatofGuaranteeBond.pdf
ATTACHMENT
GCC-April-2022.pdf
ATTACHMENT
2025_01_09IIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111.pdf
ATTACHMENT
Download all tender documents and submit your bid