Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 L+₹5,100 (1.02%)Rejected-Finance | ₹5.0 L+₹5,100 (1.02%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹5.1 L+₹6,350 (1.27%)Rejected-Finance LOWER KAFFER KALIMPONG | KALIMPONG | ₹5.1 L+₹6,350 (1.27%) | L3 | Rejected-Finance Rejected |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
19 Jun 2026, 6:55 pmClosed
BLOCK DEVELOPMENT OFFICER
OFFICE OF THE BLOCK DEVELOPMENT OFFICER, LAVA DEVELOPMENT BLOCK
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BHARAT CHETTRI HOCKEY ACADEMY TO MAIN ROAD AT 16TH MILE, PAIYONG BUSTY UNDER PAIYONG GRAM PANCHAYAT, LAVA DEVELOPMENT BLOCK.
2026_DMK_5015114_1
BDO/NIeTNo.37/2025-26
Open Tender
CIVIL WORKS
Percentage
PAIYONG
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
₹10,000
17 Aug 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation trenches or drains in all sorts of soils(Including mixed soils but excluding laterite or sandstone), including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. | - | m³ | 119.27 | - |
| 2 | (A) Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth. | - | m2 | 64 | - |
| 3 | B.Cost of Boulder | - | m³ | 1,526.4 | - |
| 4 | Cement concrete with graded jhama khoa(30 mm size) excluding shuttering in ground floor and foundation 1:3:6 propotion | - | m³ | 5,310 | - |
| 5 | Hire labour charges for Shuttering with hard wood for precast RC Slab curved or straight, and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc. complete in all respect. (Only the area in contact to concrete to be measured) | - | m2 | 400.8 | - |
| 6 | 18 % including GST | - | L.S | 75,514 | - |
| 7 | Labour Cess @ 1 % | - | L.S | 4,950.98 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.40 MB
BOQ_5083702.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .