Executive Engineer WD XIV(NH) PWD
Fatorda Margao Goa
RFP for Appointment of Safety Consultant for the project of Four Laning of Navelim to Cuncolim section of NH-66 from Km.554.245 to Km 561.480 in the State of Goa on Hybrid Annuity Mode
2026_MoRTH_918833_1
13/1/2026-27/PWD/ WDXIV/NH/ASW/07 dt 23.07.2026
Open Tender
Civil Works - Highways
Item Rate
Navelim to Cuncolim section of NH-66
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
payable to MoRTH via Bharatkosh.
Exempted
O/o The Chief Engineer (NH,RB)
1 Sept 2026
24 Jul 2026
2 Sept 2026
24 Jul 2026
1 Sept 2026
24 Jul 2026
24 Jul 2026 - 7 Aug 2026
7 Aug 2026
Figure
Total fee of assignment for Project (A+B+C) (Rs.)
Note: (i) Rate quoted shall include all expenditure required for assignment. (ii) The Financial Proposal shall take into account all types of tax liabilities including cost of insurance, except GST. (iii) The firms / organizations shall take full responsibility for accuracy in assessment of above amounts. (iv) GST will be reimbursed on demand and after the submission of proof of deposition of GST. (v) The payment shall be made as per payment schedule given in ToR. (vi) Break-up of the cost of assignment is to be given in Annexure-IV of Form-7. (vii) In case bidder does not submit breakdown of cost of the Assignment, then his bid will be considered as non-responsive. (viii) The payment of the consultant will be made as per deliverable made by them and it will be guided as per timeline of deliverables mentioned in RFP. (ix)For OMT Projects format of financial proposal will remain the same as per BOT of projects on DBFOT basis. (x) Bidder must ensure that the amount in figures and in words is the same.
Annexure-III
Summary of Cost
Name of the firm:
Amount in figures (Rs.)
Safety Consultant for Four Laning of Navelim to Cuncolim section of of NH-66 from Km.554.245 to Km 561.480 in the State of Goa on Hybrid Annuity Mode
Total fees of assignments
Note: Bidder must ensure that the amount in figures and words are the same. In case of discrepancy, amount indicated in words shall prevail (Refer Cl. 2.15)
Annexure-IV
Break-up of cost of assignment
Name of project:
Name of firm:
1(A) Remuneration of Key Personnel / Experts and Support Staff
At office
(i) Experts / Key Personnel
Road Safety Auditor / Team Leader
Traffic Planner
Sub Total (Ai)
(ii) Support Staff
Sub Total (Aii)
Total (Ai+Aii)
Annexure-IV
Break-up of cost of assignment
Name of project:
Name of firm:
1(A) Remuneration of Key Personnel / Experts and Support Staff
At office
(i) Experts / Key Personnel
Road Safety Auditor / Team Leader
Traffic Planner
Sub Total (Ai)
(ii) Support Staff
Sub Total (Aii)
Total (Ai+Aii)
Annexure-IV
Break-up of cost of assignment
Name of project:
Name of firm:
1(A) Remuneration of Key Personnel / Experts and Support Staff
At office
(i) Experts / Key Personnel
Road Safety Auditor / Team Leader
Traffic Planner
Sub Total (Ai)
(ii) Support Staff
Sub Total (Aii)
Total (Ai+Aii)
Annexure-V
Name of project:
Road Safety Auditor / Team Leader
Traffic Planner
Experts / Key Personnel
Support Staff
Sub Total 1(B)
Vehicle
Sub-total 2(A)
Experts / Key Personnel
Support Staff
Sub-total 2(B)
Reports and document costs
Draft Construction stage audit Report for the TMP/TCP prepared by the Contractor or Concessionaire
Final Construction stage audit Report for the TMP/TCP prepared by the Contractor or Concessionaire
Draft Construction stage road safety audit at every four months for work sites.
Final Construction stage road safety audit of worksites
Training Workshop for MoRT&H field officers, staff of IE, Concessionaire and Contractor
Submission of GAP report
Draft Pre-Opening stage audit report
Final Pre-Opening stage audit report
Sub Total 3
Note: Rate per copy should be as per Consultant's assessment from the current status of project.
Cost of office space, equipment, computer hardware/software etc. required for the assignment (Rs.)
Other cost (Pl. describe)
Annexure-V
Name of project:
Road Safety Auditor / Team Leader
Traffic Planner
Experts / Key Personnel
Support Staff
Sub Total 1(B)
Vehicle
Sub-total 2(A)
Experts / Key Personnel
Support Staff
Sub-total 2(B)
Reports and document costs
Carryout an existing stage audit at the end of 6th months of opening the highway to traffic and submit Draft report to RO(MoRT&H)/IE/AE and PD
Final Road Safety Audit of Existing Road based on comments received from RO/ PD(MoRT&H)/IE/AE
Prepare a Draft report of Blackspot Identification, etc after 12 months of opening the highway to traffic, based on accident data collection & analysis for the project highway with countermeasures for rectification including schematic design
Final Report of accident data collection and rectification of blackspots with detailed design
Carryout an existing stage audit at the end of 24th months of opening the highway to traffic and submit Draft report to RO/PD(MoRT&H)/IE/AE
Final Road Safety Audit of Existing Road/Operation Stage based on comments received from RO/PD(MoRT&H)/IE/AE
Prepare a Draft report of Blackspot Identification, etc after 36 months from of opening the highway to traffic, based on accident data collection & analysis for the project highway with countermeasures for rectification including schematic design
Final Report of accident data collection and rectification of blackspots with detailed design
Carryout an existing stage audit at the end of 36th months of opening the highway to traffic and submit Draft report to RO/PD(MoRT&H)/IE/AE
Final Road Safety Audit of Existing Road based on comments received from RO/PD(MoRT&H)/IE/AE
Sub Total 3
Note: Rate per copy should be as per Consultant's assessment from the current status of project.
Cost of office space, equipment, computer hardware/software etc. required for the assignment (Rs.)
Other cost (Pl. describe)
Annexure-V
Name of project:
Minimum man-months for projects on BOT/DBFOT/HAM/EPC/O&M/Item Rate basis for each Key Personnel are as under:
Road Safety Auditor / Team Leader
Traffic Planner
Experts / Key Personnel
Support Staff
Sub Total 1(B)
Vehicle
Sub-total 2(A)
Experts / Key Personnel
Support Staff
Sub-total 2(B)
Reports and document costs
Submission of Inception Report covering all safety audit activities including finalisation of methodology, implementing schedule, and training requirement as per TOR.
Draft Safety Report for Design Stage Audit
Final Safety Report for Design Stage Audit
Draft Safety Report for Design Stage Audit for those design forwarded later (that were not submitted in the development stage) during the construction stage
Final Safety Report for Design Stage Audit
Draft Safety Report for Design Stage Audit for those design forwarded later (that were not submitted in the development stage) during the construction stage
Final Safety Report for Design Stage Audit
Training Workshop for MoRT&H field officers, staff of IE/AE, Concessionaire and Contractor
Sub Total 3
Note: Rate per copy should be as per Consultant's assessment from the current status of project.
Cost of office space, equipment, computer hardware/software etc. required for the assignment (Rs.)
Other cost (Pl. describe)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
Tendernotice_2.pdf
PDF • 19.02 MB
Financial_Proposal.xls
Tender Documents • 0.10 MB
Corrigendum3.pdf
PDF • 0.28 MB
Corrigendum2.pdf
PDF • 0.42 MB
Corrigendum1Prebidqueriesreply.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].