| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹21.6 L+₹1.3 L (6.64%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹22.0 L+₹1.7 L (8.51%)Rejected-Finance | L3 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | M/s Rahul Traders L1 | DIVESH HARISH SIRIAH L2 | Varsha G Nagphase L3 |
|---|---|---|---|---|---|---|
| 1.00 | Material and labour for providing anti-termite treatment (Post Construction) along the external wall below concrete apron/ plinth protection using chemical emulsion (for using Chloropyriohos emulsifiable concentrates conforming to IS-8944 - 2005) @ 2.25 Litre per linear metre, the hole 300mm apart including drilling and plugging 12mm dia holes with cement mortar (1:2) to match with the existing floors complete all as specified and directed.
(Note : To dilute chemical of 20 percent concentration, 19 parts of water to one part of the chemical shall be added to achieve 1 (one) percent concentration.) | 800 | RM | 88 ₹70,400 | 80 ₹64,000 Lowest | 95 ₹76,000 |
| 2.00 | Material and labour for providing anti-termite treatment (Post Construction) under existing floors using chemical emulsion (for using Chloropyriohos emulsifiable concentrates conforming to IS-8944 - 2005) @1.00 Litre per hole. 300mm apart including drilling and plugging 12mm dia holes with CM (1:2) to match with the existing floors complete all as specified and directed.
(Note : To dilute chemical of 20 percent concentration, 19 parts of water to one part of the chemical shall be added to achieve 1 (one) percent concentration.) | 80 | Sqm | 220 ₹17,600 | 120 ₹9,600 Lowest | 225 ₹18,000 |
| 3.00 | Material and labour for providing anti-termite treatment (Post Construction) at point of contact of wood work with floor or wall, using chemical emulsion (in oil or kerosene based solution of Chloropyriohos 1.0% by weight concentration shall be used for treatment of wood or wood based products) @ 0.50 Litre per hole by drilling 6mm dia holes at a downward angle angle of 45° at 150 centre to centre and sealing with CM (1:2) to match with the existing surface complete all as specified and directed.
(Note : To dilute chemical of 20 percent concentration, 19 parts of oil or kerosene to one part of the chemical shall be added to achieve 1 (one) percent concentration.) | 100 | RM | 90 ₹9,000 | 90 ₹9,000 | 88 ₹8,800 Lowest |
| 4.00 | Taking down cement plaster of any description including racking out joints hacking for key, scrubbing down with water etc complete all as specified and directed. | 430 | Sqm | 60 ₹25,800 | 48 ₹20,640 | 40 ₹17,200 Lowest |
| 5.00 | M&L Rendering 10 mm thick internal using cement plaster in CM 1:6 on fair faces of brick/concrete work surfaces to be finished even and smooth (without using extra lime or cement complete all as specified and directed. | 200 | Sqm | 300 ₹60,000 | 325 ₹65,000 | 230 ₹46,000 Lowest |
| 6.00 | M & L Rendering 15 mm thick on fair faces of brick work or concrete surfaces in CM (1:4) finished fair and even all as specified and directed. | 150 | Sqm | 280 ₹42,000 Lowest | 325 ₹48,750 | 300 ₹45,000 |
| 7.00 | M & L for 5mm thick rendering on fair faces of brick work or concrete surfaces in CM ( 1:3 ) finished even and smooth (without using extra lime or cement) on Ceiling complete all as specified and as directed. | 80 | Sqm | 240 ₹19,200 Lowest | 300 ₹24,000 | 260 ₹20,800 |
| 8.00 | M&L for preparing newly plastered surfaces and applying two coats of oil bound distemper over a coat of chalk whiting, white primer complete on walls complete all as specified and directed. | 200 | Sqm | 78 ₹15,600 | 68 ₹13,600 Lowest | 78 ₹15,600 |
| 9.00 | M&L for two coats of cement base paint over a coat of white wash on new plastered surfaces including preparation of surfaces complete all as specified and directed. | 150 | Sqm | 49 ₹7,350 | 15 ₹2,250 Lowest | 68 ₹10,200 |
| 10.00 | Material and labour for applying two coats of oil bound distemper on ceiling over a coat priming paint including preparation of new surfaces complete all as specified. | 80 | Sqm | 68 ₹5,440 Lowest | 90 ₹7,200 | 95 ₹7,600 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
11 Apr 2026, 6:00 pmClosed
GE Kamptee
GE Kamptee
REPAIRS TO SUNKEN SLAB, DPC, ATT, ROOF TREATMENT AND OTHER MISC WORKS AT FORT AREA NAGPUR UNDER GE KAMPTEE
2026_MES_757125_1
8909/E8
Open Tender
Civil Works
Item Rate
180 days
NAGPUR
AS PER NIT
8 documents required · 8 mandatory
₹500
GE Kamptee
₹40,000
Yes
12 May 2026
20 Mar 2026
13 Apr 2026
20 Mar 2026
11 Apr 2026
3 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Material and labour for providing anti-termite treatment (Post Construction) along the external wall below concrete apron/ plinth protection using chemical emulsion (for using Chloropyriohos emulsifiable concentrates conforming to IS-8944 - 2005) @ 2.25 Litre per linear metre, the hole 300mm apart including drilling and plugging 12mm dia holes with cement mortar (1:2) to match with the existing floors complete all as specified and directed.
(Note : To dilute chemical of 20 percent concentration, 19 parts of water to one part of the chemical shall be added to achieve 1 (one) percent concentration.) | - | RM | - | - |
| - | Material and labour for providing anti-termite treatment (Post Construction) under existing floors using chemical emulsion (for using Chloropyriohos emulsifiable concentrates conforming to IS-8944 - 2005) @1.00 Litre per hole. 300mm apart including drilling and plugging 12mm dia holes with CM (1:2) to match with the existing floors complete all as specified and directed.
(Note : To dilute chemical of 20 percent concentration, 19 parts of water to one part of the chemical shall be added to achieve 1 (one) percent concentration.) | - | Sqm | - | - |
| - | Material and labour for providing anti-termite treatment (Post Construction) at point of contact of wood work with floor or wall, using chemical emulsion (in oil or kerosene based solution of Chloropyriohos 1.0% by weight concentration shall be used for treatment of wood or wood based products) @ 0.50 Litre per hole by drilling 6mm dia holes at a downward angle angle of 45° at 150 centre to centre and sealing with CM (1:2) to match with the existing surface complete all as specified and directed.
(Note : To dilute chemical of 20 percent concentration, 19 parts of oil or kerosene to one part of the chemical shall be added to achieve 1 (one) percent concentration.) | - | RM | - | - |
| - | Taking down cement plaster of any description including racking out joints hacking for key, scrubbing down with water etc complete all as specified and directed. | - | Sqm | - | - |
| - | M&L Rendering 10 mm thick internal using cement plaster in CM 1:6 on fair faces of brick/concrete work surfaces to be finished even and smooth (without using extra lime or cement complete all as specified and directed. | - | Sqm | - | - |
| - | M & L Rendering 15 mm thick on fair faces of brick work or concrete surfaces in CM (1:4) finished fair and even all as specified and directed. | - | Sqm | - | - |
| - | M & L for 5mm thick rendering on fair faces of brick work or concrete surfaces in CM ( 1:3 ) finished even and smooth (without using extra lime or cement) on Ceiling complete all as specified and as directed. | - | Sqm | - | - |
| - | M&L for preparing newly plastered surfaces and applying two coats of oil bound distemper over a coat of chalk whiting, white primer complete on walls complete all as specified and directed. | - | Sqm | - | - |
| - | M&L for two coats of cement base paint over a coat of white wash on new plastered surfaces including preparation of surfaces complete all as specified and directed. | - | Sqm | - | - |
| - | Material and labour for applying two coats of oil bound distemper on ceiling over a coat priming paint including preparation of new surfaces complete all as specified. | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tenderdocument8809.pdf
Tender Documents • 1.12 MB
BOQ_848075.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .