Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.2 LAdmitted-Finance | -46.89% | ₹15.2 L | L1 | Admitted-Finance |
| 2 | L2₹17.2 LAdmitted-Finance | -39.99% | ₹17.2 L | L2 | Admitted-Finance |
| 3 | L3₹18.4 LAdmitted-Finance | -35.87% | ₹18.4 L | L3 | Admitted-Finance |
| 4 | L4₹20.7 LAdmitted-Finance | -28.00% | ₹20.7 L | L4 | Admitted-Finance |
| 5 | L5₹20.7 LAdmitted-Finance | -27.99% | ₹20.7 L | L5 | Admitted-Finance |
Tender Value
₹28.7 L
EMD Value
₹57,365
Closing Date
4 Feb 2026, 3:00 pmClosed
Executive Engineer, Civil Division-X
Executive Engineer, Civil Division-X
Desilting and disposal of Molar Bund Drain including maintenance for the period of 06 months from RD 0m to RD 1335m
2026_IFC_285773_1
EE/CD-X/2025-26/81
Open Tender
Civil Works
300 days
Molar Bund
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹57,365
4 Feb 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
Desilting /removal of silt/earth/manure/sludge etc. from the bed of Drain in entire width of Drain including in or under foul condition upto desired level as per direction of Engineer -in-Charge using suitable and adequate and latest technology machinery without obstructing the flow of drain. Including leveling and dressing of stacking area on the bank/berm and construction of dykes within the reach if required for drying. Desilted/excavated material to take away by agency for environmental safe disposal with all lead and lift to okhla SLF.
Maintenance of Molar Bund Drain by deploying manpower (labour)/machinery as per requirement of site for removal of all types of obstructions including garbage, floating material and dead animals above water level and cleaning of all existing culverts etc. from the bank of drain regularly to maintain the drain neat and clean and disposal of removed/collected material to the near by MCD collection point/dhalao by handcart/tractor trolley including all leads and lifts in foul condition complete as per site requirement and directed by Enginner-in-charge. Note 1: If any part of the reach found not clear upto the satisfaction of Engineer-in-charge for consecutive 03 days, a recovery of 3000 per km/per day for each side shall be made from the bills.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
NIT.pdf
Tender Documents • 0.82 MB
BOQ_378210.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid