Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-Finance | 1 | Accepted-Finance ok | |
| 2 | 2₹5.5 L+₹41,760 (8.25%)Accepted-Finance | 2 | Accepted-Finance ok | |
| 3 | Not Admitted-Fee | - | Not Admitted-Fee EMD/Instrument is not valid |
Tender Value
₹5.7 L
EMD Value
₹11,420
Closing Date
25 Nov 2021, 6:00 pmClosed
Sr. RM Bikaner
Sr. Regional Manager Riico office Industrial Area, Bichhwal, Bikaner
Regular Operation Maintenance of street lights at Industrial area Rani Baza in Bikaner.
2021_RIICO_248394_1
22/2021-22 e
Open Tender
Civil Works
Item Rate
730 days
RaniBazar
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
Riico Ltd.
₹11,420
Yes
8 Dec 2021
24 Nov 2021
30 Nov 2021
24 Nov 2021
25 Nov 2021
24 Nov 2021
Amount
LED (Single tube - 45 - 90 W) Maintenance of Street light fixtures in Industrial Areas including labour. as per the following terms and conditions:- 1. At any moment, a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 48 hours failing which three times of the maintenance charges payable for each fixture for the month shall be panelized & recovered from the agency 2. Contractor shall arrange at his own cost for put on & off the street light fixture at the appropriate time regularly as per instructions of Engineer-in-charge. 3. A register shall be maintained at RIICO/association office and complaint lodged must be attended by Contractor within 24 Hours. 4. The person deputed by Contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly. 5. Contractor will have to employ trained and qualified electricians for the work. 6. Corporation shall not be responsible for any kind of accident during execution of work. 7. Contractor will be responsible for safety and security of fixtures and all concerned materials. 8. Contractor will be responsible for arrangement of all T&P required for the work 9. All material required for the work shall not be below the category – II of concerned BSR item. 10. Streetlight fixtures handed over to contractor will have to be maintained by the contractor. No extra payment will be made for fixing/removal of extra/existing fixture in the Industrial Area. 11. Contractor will be responsible for timely collection & deposition of electric bills of areas in each month. In case of delay in payment and JdVNL/BkESL impose surcharge for delay payment the same will be recovered from the Current bill of the contractor. 12. Contractor has to maintain power factor as per norms of JdVNL/BkESL. The contractor is required to arrange the suitable capacitor and other necessary equipment for maintaining power factor at his own cost. No extra payment will be allowed for this arrangement. In the case of any power factor surcharge is imposed by JdVNL/BkESL in electric bill same will be deducted from the payment of contractor, but in case of power factor incentive, the same will not be given to the contractor. 13. Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. 14. During execution of work penalty imposed by JdVNL/BkESL due to theft or any other reason same will be recovered from contractor. 15.In Every week contactor must be joint inspection of street light with Association & corporation authorized officer, otherwise payment will not release. 16. Payment is given to contractor bimonthly after providing satisfactory performance certificate from industrialists and photos of street lights, otherwise payment will not release. 17. Contractor should have maintained the register for no. of points on/off daily reports and complaints. 18. If work found satisfactory than time period may increase further 6 months(on mutual Satisfaction) on same rate. 19. Rate for maintenance of fixture per month including all materials, scaffolding,labour etc. But Corporation provides only material (from Riico Store Room) in case of existing material not in repairable condition.
Tube light fixtures (Single tube - 40 W) Maintenance of Street light fixtures in Industrial Areas including labour. as per the following terms and conditions:- 1. At any moment, a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 48 hours failing which three times of the maintenance charges payable for each fixture for the month shall be panelized & recovered from the agency 2. Contractor shall arrange at his own cost for put on & off the street light fixture at the appropriate time regularly as per instructions of Engineer-in-charge. 3. A register shall be maintained at RIICO/association office and complaint lodged must be attended by Contractor within 24 Hours. 4. The person deputed by Contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly. 5. Contractor will have to employ trained and qualified electricians for the work. 6. Corporation shall not be responsible for any kind of accident during execution of work. 7. Contractor will be responsible for safety and security of fixtures and all concerned materials. 8. Contractor will be responsible for arrangement of all T&P required for the work 9. All material required for the work shall not be below the category – II of concerned BSR item. 10. Streetlight fixtures handed over to contractor will have to be maintained by the contractor. No extra payment will be made for fixing/removal of extra/existing fixture in the Industrial Area. 11. Contractor will be responsible for timely collection & deposition of electric bills of areas in each month. In case of delay in payment and JdVNL/BkESL impose surcharge for delay payment the same will be recovered from the Current bill of the contractor. 12. Contractor has to maintain power factor as per norms of JdVNL/BkESL. The contractor is required to arrange the suitable capacitor and other necessary equipment for maintaining power factor at his own cost. No extra payment will be allowed for this arrangement. In the case of any power factor surcharge is imposed by JdVNL/BkESL in electric bill same will be deducted from the payment of contractor, but in case of power factor incentive, the same will not be given to the contractor. 13. Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. 14. During execution of work penalty imposed by JdVNL/BkESL due to theft or any other reason same will be recovered from contractor. 15.In Every week contactor must be joint inspection of street light with Association & corporation authorized officer, otherwise payment will not release. 16. Payment is given to contractor bimonthly after providing satisfactory performance certificate from industrialists and photos of street lights, otherwise payment will not release. 17. Contractor should have maintained the register for no. of points on/off daily reports and complaints. 18. If work found satisfactory than time period may increase further 6 months(on mutual Satisfaction) on same rate. 19. Rate for maintenance of fixture per month including all materials, scaffolding,labour etc. But Corporation provides only material (from Riico Store Room) in case of existing material not in repairable condition.
Sodium vapour lamp fixtures (Single tube - 70 W/150 W) LED (Single tube - 45 - 90 W) Maintenance of Street light fixtures in Industrial Areas including labour. as per the following terms and conditions:- 1. At any moment, a minimum of 85% of total fixture must be in order. The defective fixture must be repaired within 48 hours failing which three times of the maintenance charges payable for each fixture for the month shall be panelized & recovered from the agency 2. Contractor shall arrange at his own cost for put on & off the street light fixture at the appropriate time regularly as per instructions of Engineer-in-charge. 3. A register shall be maintained at RIICO/Association office and complaint lodged must be attended by Contractor within 24 Hours. 5. Contractor will have to employ trained and qualified electricians for the work. 4. Contractor will be responsible for safety and security of fixtures. 8. Contractor will be responsible for arrangement of all T&P required for the work 5. All material required for the work shall not be below the category – II of concerned BSR item. 6. Streetlight fixtures handed over to contractor will have to be maintained by the contractor. No extra payment will be made for fixing/removal of extra/existing fixture in the Industrial Area. 7. Contractor will be responsible for timely collection & deposition of electric bills of areas in each month. In case of delay in payment and JdVNL/BkESL impose surcharge for delay payment the same will be recovered from the Current bill of the contractor. 8. Contractor has to maintain power factor as per norms of JdVNL/BkESL. The contractor is required to arrange the suitable capacitor and other necessary equipment for maintaining power factor at his own cost. No extra payment will be allowed for this arrangement. In the case of any power factor surcharge is imposed by JdVNL/BkESL in electric bill same will be deducted from the payment of contractor, but in case of power factor incentive, the same will not be given to the contractor. 9. During execution of work penalty imposed by JdVNL/BkESL due to theft or any other reason same will be recovered from contractor. 10. In Every week contactor must be joint inspection of street light with Association & corporation authorized officer, otherwise payment will not release. 11. Payment is given to contractor bimonthly after providing satisfactory performance certificate from industrialists and photos of street lights, otherwise payment will not release. 12. If work found satisfactory than time period may increase further 6 months(on mutual Satisfaction) on same rate. 13. Rate for maintenance of fixture per month including all materials, scaffolding,labour etc. But Corporation provides only material (from Riico Store Room) in case of existing material not in repairable condition.
Engineer Corporation Of India
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .