| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5 LAccepted-AOC | ₹5 L Quoted ₹4.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.2 L+₹1,027.66 (0.25%)Rejected-AOC | ₹4.2 L+₹1,027.66 (0.25%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | D RAJENDRAN L2 | PNAT CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation in all soild with initial lead and lift etc., complete for drain | 70 | M3 | 220 ₹15,400 Lowest | 220 ₹15,400 Lowest |
| 2.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 11 | M3 | 5,962.42 ₹65,586.62 | 5,962 ₹65,582 Lowest |
| 3.00 | Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m length including cost of nails etc., | 177 | M2 | 535 ₹94,695 | 534 ₹94,518 Lowest |
| 4.00 | Plain Cement concrete 1:3:6 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 31 | M³ | 6,721.56 ₹2,08,368.36 | 6,721 ₹2,08,351 Lowest |
| 5.00 | Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications. | 43 | M2 | 310 ₹13,330 | 309 ₹13,287 Lowest |
| 6.00 | Plain Cement concrete 1:2:4 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 2 | M³ | 7,266.84 ₹14,533.68 | 7,266 ₹14,532 Lowest |
| 7.00 | Conveyance of excavated earth from the site 5Km lead including loading and unloading etc completed | 56 | M3 | 104 ₹5,824 | 90 ₹5,040 Lowest |
| 8.00Add :- GST @ 18% | |||||
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
8 Jan 2026, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Construction of Strom Water Drain at Kumaran Street West Side Cut Road 1 and 2 in Ward No 21, North Zone
2026_MAWS_638844_33
E7/NorthZone/2025-26
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
22 Sept 2026
5 Jan 2026
9 Jan 2026
5 Jan 2026
8 Jan 2026
5 Jan 2026
Earth work Excavation in all soild with initial lead and lift etc., complete for drain
Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification.
Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m length including cost of nails etc.,
Plain Cement concrete 1:3:6 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications.
Plain Cement concrete 1:2:4 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Conveyance of excavated earth from the site 5Km lead including loading and unloading etc completed
Add :- GST @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
NITE7-SWD.pdf
Tender Documents • 0.40 MB
BOQ_765401.xls
BOQ • 0.28 MB
ITBE7.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .