Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹2,910
Closing Date
19 Dec 2022, 4:30 pmClosed
ER GIAN SINGH
OFFICE OF THE EXECUTIVE ENGINEER REW RAMBAN MAITRA
AS PER THE NIT ATTACHED
2022_RDPR_199319_1
NIT NO 98 OF REW RAMBAN FRESH OF 90,91,92,93
Open Limited
Civil Works
Item Wise
30 days
RAMBAN
AS PER THE NIT ATTACHED
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER REW RAMBAN MAITRA
₹2,910
21 Dec 2022
12 Dec 2022
20 Dec 2022
12 Dec 2022
19 Dec 2022
12 Dec 2022
Amount
Earth work in excavation by manual means in areas, (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m in all kinds of soils.
Providing/Laying in position cement concreteof specified mix (1:5:10) using 40mm size aggregate including loading,unloading and carriage of materials
Providing/Laying in position reinforced cement concreteof specified mix (1:1.5:3) using 20mm size aggregate including loading,unloading and carriage of materials
Providing/Laying in position cement concreteof specified mix (1:3:6) using 20mm size aggregate including loading,unloading and carriage of materials,with 30% boulders
Fillling available excavated earth in plinth
Dry boulder stone filling laid on horizontal surface including cost of stone etc complete
Providing and laying reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Providing and fixing Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding etc
Centring and shuttering including struting and proping and removal of form work for foundation and plinth etc
Centring and shuttering including struting and proping and removal of form work for slabs etc
Centring and shuttering including struting and proping and removal of form work for edges of slabs etc
Centring and shuttering including struting and proping and removal of form work for beams ,columns etc
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 40mm thick with 20 mm nominal size stone aggregate. including loading,unloading and carriage of materials
15mm thick cement plaster in 1:6 mix
12mm thick cement plaster in 1:4 mix(1cement:6 fine sand)
Making plinth protection 50mm thick of concrete (1:3:6) mix
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shape
Provision for Citizen Information Board
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .