Loading…
Loading…
Tender Value
₹84.0 L
EMD Value
₹84,100
Closing Date
30 Sept 2026, 5:00 pm3d left
Divisional Officer
RURAL WORKS DIVISION, DHENKANAL
Renovation of Additional Class Room Building Over Science Block at Hindol College Khajuriakata Dhenkanal under PM-USHA
2026_CERWI_141395_1
TCN-09/2026-27
Open Tender
Civil Works - Buildings
Percentage
240 days
Dhenkanal
2 documents required · 2 mandatory
₹10,000
₹84,100
Yes
22 Sept 2026
22 Sept 2026
1 Oct 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
22 Sept 2026 - 29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cement concrete (1:2:4) using 12mm hard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. First Floor | 0.11 | cum | 8,174.28 | ₹899.17 |
| 2 | Second Floor | 0.31 | cum | 8,687.22 | ₹2,693.04 |
| 3 | Flyash Brick masonary in cement mortar (1:6) flyash Bricks including cost of materials, all taxes of labour, T&P, cess, Royalty, DMF, EMF & additional charges as applicable etc complete as per specification and as directed by the Engineer in Charge. In Superstructure First Floor | 26.57 | cum | 6,418.88 | ₹1,70,549.64 |
| 4 | Second Floor | 151.08 | cum | 6,862.75 | ₹10,36,824.27 |
| 5 | R.C.C. M-25 using 20mm and down graded hard granite Crusher broken chips including laying, hoisting, Centring & shuttering including cost of materials, all taxes of labour, T&P, cess, Royalty, DMF, EMF & additional charges as applicable etc complete as per specification and as directed by the Engineer in charge.
First Floor Column and Beam | 6.26 | cum | 21,379.72 | ₹1,33,837.05 |
| 6 | Lintel | 1.19 | cum | 16,456.86 | ₹19,583.66 |
| 7 | Chajja | 6.48 | sqm | 1,457.03 | ₹9,441.55 |
| 8 | Shelves | 3.05 | sqm | 1,273.05 | ₹3,882.8 |
| 9 | Roof Slab | 10.57 | cum | 15,982.58 | ₹1,68,935.87 |
| 10 | Second Floor Column and Beam | 40.77 | cum | 24,461.12 | ₹9,97,279.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 1.54 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_610367.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .