| Sl No | Description | Qty | Unit | Modern Infrastructure L2 | Thanush Ram Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 82.69 | Cum | 265 ₹21,912.85 | 263 ₹21,747.47 Lowest |
| 2.00 | Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 7.75 | Cum | 5,610 ₹43,477.5 | 5,606 ₹43,446.5 Lowest |
| 3.00Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum | |||||
| 4.00 | Below GL | 139.41 | Sqm | 550 ₹76,675.5 | 547 ₹76,257.27 Lowest |
| 5.00 | Above GL | 61.56 | Sqm | 1,100 ₹67,716 | 1,095 ₹67,408.2 Lowest |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance all charges etc | 83.55 | Cum | 6,365 ₹5,31,795.75 | 6,360 ₹5,31,378 Lowest |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance all charges etc | 3.38 | Cum | 6,910 ₹23,355.8 | 6,905 ₹23,338.9 Lowest |
| 8.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works with standard specification etc complete. | 1.1 | MT | 91,920 ₹1,01,112 | 91,910 ₹1,01,101 Lowest |
| 9.00 | Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 8.1 | Cum | 9,235 ₹74,803.5 | 9,230 ₹74,763 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,69,353 ₹1,69,353 | 1,69,099 ₹1,69,099 Lowest |
Tender Value
Refer Docs
EMD Value
₹11,220
Closing Date
20 Feb 2026, 3:30 pmClosed
Block Development Officer (V.P), Tiruchengode
Block Development Office ,Tiruchengode
Construction of 3m Span Culvert from Thachakattupalayam Kalivelampalayam Road SHG building near H/O Thokkavadi in Tiruchengode Block at Namakkal District under Pooled Assine Fund 2025-2026
2026_RDTN_657956_1
549/2026/T3
Open Tender
Civil Works - Others
Item Rate
Tiruchengode
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,220
23 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 82.69 | Cum | - | - |
| 2 | Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 7.75 | Cum | - | - |
| 3 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum | - | - | - | - |
| 4 | Below GL | 139.41 | Sqm | - | - |
| 5 | Above GL | 61.56 | Sqm | - | - |
| 6 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance all charges etc | 83.55 | Cum | - | - |
| 7 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance all charges etc | 3.38 | Cum | - | - |
| 8 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works with standard specification etc complete. | 1.1 | MT | - | - |
| 9 | Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 8.1 | Cum | - | - |
| 10 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
TechBid.pdf
Tender Documents • 0.33 MB
BOQ_789247.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].