| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.1 LAccepted-AOC | ₹11.1 L | 1 | Accepted-AOC WORKORDER |
| 2 | 2₹11.1 LRejected-Finance | ₹11.1 L | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Modern Infrastructure L2 | Thanush Ram Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 82.69 | Cum | 265 ₹21,912.85 | 263 ₹21,747.47 |
| 2.00 | Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 7.75 | Cum | 5,610 ₹43,477.50 | 5,606 ₹43,446.50 |
| 3.00Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum | |||||
| 4.00 | Below GL | 139.41 | Sqm | 550 ₹76,675.50 | 547 ₹76,257.27 |
| 5.00 | Above GL | 61.56 | Sqm | 1,100 ₹67,716 | 1,095 ₹67,408.20 |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance all charges etc | 83.55 | Cum | 6,365 ₹5.3 L | 6,360 ₹5.3 L |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance all charges etc | 3.38 | Cum | 6,910 ₹23,355.80 | 6,905 ₹23,338.90 |
| 8.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works with standard specification etc complete. | 1.1 | MT | 91,920 ₹1.0 L | 91,910 ₹1.0 L |
| 9.00 | Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 8.1 | Cum | 9,235 ₹74,803.50 | 9,230 ₹74,763 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,69,353 ₹1.7 L | 1,69,099 ₹1.7 L |
Tender Value
Refer Docs
EMD Value
₹11,220
Closing Date
20 Feb 2026, 3:30 pmClosed
Block Development Officer (V.P), Tiruchengode
Block Development Office ,Tiruchengode
Construction of 3m Span Culvert from Thachakattupalayam Kalivelampalayam Road SHG building near H/O Thokkavadi in Tiruchengode Block at Namakkal District under Pooled Assine Fund 2025-2026
2026_RDTN_657956_1
549/2026/T3
Open Tender
Civil Works - Others
Tiruchengode
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,220
23 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum
Below GL
Above GL
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance all charges etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance all charges etc
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works with standard specification etc complete.
Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
TechBid.pdf
Tender Documents • 0.33 MB
BOQ_789247.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid