| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 CrAccepted-AOC MOHSINPUR MANSURPUR AKBARPUR AMBEDKAR NAGAR | ₹16.9 Cr | L1 | Accepted-AOC bond |
| 2 | L2₹19.7 CrRejected-Finance | ₹19.7 Cr | L2 | Rejected-Finance reject |
| 3 | L3₹20.3 CrRejected-Finance 0 | ₹20.3 Cr | L3 | Rejected-Finance reject |
| 4 | L4₹20.9 CrRejected-Finance | ₹20.9 Cr | L4 | Rejected-Finance reject |
| 5 | L5₹22.0 CrRejected-Finance | ₹22.0 Cr | L5 | Rejected-Finance reject |
Tender Value
₹27 Cr
EMD Value
₹40.5 L
Closing Date
26 Dec 2024, 12:30 pmClosed
SE Ayodhya Ambedkarnagar Circle PWD Ayodhya
SE Ayodhya Ambedkarnagar Circle PWD Ayodhya
Widenging and Strenthening of Baskhari Jalalpur Surhurpur Road (ODR) Ch. 20.000 to 29.550 and 29.675 to 38.130
2024_CEUFZ_980496_1
8103/1(1) Com Ayo.Amb. Circle/24 Dated 30-11-2024
Open Tender
Civil Works
455 days
EE CD PWD Ambedkarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹40.5 L
Yes
SE Ayodhya Ambedkarnagar Circle PWD Ayodhya
22 Jan 2025
6 Dec 2024
26 Dec 2024
6 Dec 2024
26 Dec 2024
6 Dec 2024
25 Dec 2024
Amount
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 of Morth specification
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of Morth specification
Providing,laying, spreading and compacting graded stone aggregate to wet mix mcacdam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC Cement+3.50% Emulsion in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of Morth specification. (ETA)
Providing and laying dense graded bituminous macadam grade-II with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying bituminous concrete grade-II with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Providing and laying of 350mm dia RCC NP-3 hume pipe in position including fixing of collar and cartage of pipe complete work.
P/L of 600mm dia RCC NP-3 hume pipe in position including fixing of collar and cartage of pipe complete work.
P/L of of 900mm dia RCC NP-3 hume pipe including fixing of collar and cartage of pipe complete work.
Furnishing and Placing Reinforced cement concrete in super-structure of Grade M-25 as per drawing and Technical Specification
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Furnishing and Placing Reinforced cement concrete in sub-structure of Grade M-20 as per drawing and Technical Specification
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as per G.O. No. 17/2024/सा०-113/23-1-2024-23-1099/113/2023 Dated-16.01.2024 and as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0% for items of sl no 1 to 22 of civil cost.
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as per G.O. No. 17/2024/सा०-113/23-1-2024-23-1099/113/2023 Dated-16.01.2024 and as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @0.25% for items of sl no 1 to 22 of civil cost.
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as per G.O. No. 17/2024/सा०-113/23-1-2024-23-1099/113/2023 Dated-16.01.2024 and as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.5% for items of sl no 1 to 22 of civil cost.
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as per G.O. No. 17/2024/सा०-113/23-1-2024-23-1099/113/2023 Dated-16.01.2024 and as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75%for items of sl no 1 to 22 of civil cost.
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as per G.O. No. 17/2024/सा०-113/23-1-2024-23-1099/113/2023 Dated-16.01.2024 and as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.0% for items of sl no 1 to 22 of civil cost.
Note: GST Shall be paid Extra as per G.O. No. 1614/23-10-2017-12(samanya)2017 Date 08-11-2017
VINDHYACHAL SINGH (BID ID -4811069)
RAJ CONSTRUCTION (BID ID -4813129)
M/s Alok Infra Projects (BID ID -4811668)
M/s Raj Laxmi Enterprises (BID ID -4814235)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid