Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹44.4 LAdmitted-Finance | -1.21% | ₹44.4 L | L1 | Admitted-Finance |
Tender Value
₹45.0 L
EMD Value
₹4.2 L
Closing Date
11 Aug 2026, 4:00 pmClosed
CHIEF ENGINEER
VARANASI NAGAR NIGAM
WARD NO 34 NADESHAR ANTARGAT ARAZI NO 271 MAUJA CANTOMENT ME CHOWKIDAR KAKCH SAUCHALAY SAMARSIBLE NALI NIRMAN TATHA PARISHAR ME INTERLOCKING CHOWKA RESSETING KARYA
2026_NNVAR_1174867_1
61_2026-27_T2
Open Tender
Civil Works
Percentage
90 days
VARANASI NAGAR NIGAM
AS PER TENDER DOC
3 documents required · 3 mandatory
₹4,496
TENDER COST, Account no- 50100642535388
₹4.2 L
19 Sept 2026
6 Aug 2026
11 Aug 2026
6 Aug 2026
11 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1okMZ la[;k&34 unslj ds vUrxZr vkjkth la[;k&271 ekStk dS.VksaesaV esa pkSdhnkj d{k] 'kkSpky;] leflZcy] ukyh fuekZ.k rFkk ifjlj esa b.Vjykfdax@pkSdk fjlsfVax dk;ZA | |||||
| 1.01 | Excavation foundation in ordinary soil including lift up to 1.5 m and lead up to 30m and including all compete work.SOR-251 | 18.23 | Cum | 130 | ₹2,369.9 |
| 1.02 | P/L Cement concrete in 1:6:12 with cement sand & brick ballast etc all complete (S.O.R. 2020 REF 305 SI NO. 4) & NNV-Sr No-1.04 | 13.22 | Cum | 4,060 | ₹53,673.2 |
| 1.03 | P/L Cement concrete in 1:4:8 with cement sand & brick ballast etc all complete. SI NO.281 | 10.13 | Cum | 5,550 | ₹56,221.5 |
| 1.04 | R.C.C work in 1:1.5:3 with cement ,c/sand and 20 mm stone grit with all complete, SOR SI No. 284 B | 9.72 | Cum | 9,100 | ₹88,452 |
| 1.05 | Mild steel work or iron in plain for R.C.C work etc. all complete. SOR SI No.504 | 7.63 | qtl | 6,350 | ₹48,450.5 |
| 1.06 | M-150 class brick work in 1:4 cement & f-sand etc all cpmlete.(Rate Tendar-I.N.1.10) | 106.49 | Cum | 5,500 | ₹5,85,695 |
| 1.07 | P/L D.P.C. work in 1:1.5:3 with cement c.sand & 13 mm gauge stone grit etc all complete .NNV-Sr No-1.15 | 138.95 | Sqm | 330 | ₹45,853.5 |
| 1.08 | Plaster work in 1:4 cement coase sand etc all compt. Work.SOR SI No.584 | 384.76 | sqr | 165 | ₹63,485.4 |
| 1.09 | C.C work in 1:2:4 with cement ,c/sand and 20 mm stone grit with all complete. NNV-Sr No-1.56 | 2.2 | Cum | 6,800 | ₹14,960 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
ULB_t_2.pdf
Additional Documents • 4.42 MB
BOQ_2207748.xls
BOQ • 0.32 MB
TD61.pdf
Tender Documents • 3.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .