Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.9 LAdmitted-Finance | -46.86% | ₹41.9 L | L1 | Admitted-Finance |
| 2 | L2₹45.3 L+₹3.4 L (8.20%)Admitted-Finance | -42.50% | ₹45.3 L+₹3.4 L (8.20%) | L2 | Admitted-Finance |
| 3 | L3₹48.2 L+₹6.3 L (15.1%)Admitted-Finance 583 PURVAVALI GANESHPUR ROORKEE 583 PURVAVALI GANESHPUR ROORKEE GANESHPUR ROORKEE ROORKEE HARIDWAR UTTARAKHAND 247667 | HARIDWAR | UTTARAKHAND | 247667 | -38.82% | ₹48.2 L+₹6.3 L (15.1%) | L3 | Admitted-Finance |
| 4 | L4₹48.9 L+₹7.0 L (16.7%)Admitted-Finance | -38.00% | ₹48.9 L+₹7.0 L (16.7%) | L4 | Admitted-Finance |
| 5 | L5₹49.0 L+₹7.1 L (16.9%)Admitted-Finance | -37.88% | ₹49.0 L+₹7.1 L (16.9%) | L5 | Admitted-Finance |
Tender Value
₹78.8 L
EMD Value
₹1.6 L
Closing Date
7 Jul 2026, 2:00 pmClosed
AGM(CE) FCI RO Lucknow
TC-3V Vibhuti Khand Gomti Nagar Lucknow-226010
Construction of boundary wall repair of platforms and miscellaneous civil works at FSD Hathras
2026_FCI_913266_3
CE/01/2026-27
Open Tender
Civil Works
Works
180 days
Hathras
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.6 L
7 Sept 2026
16 Jun 2026
8 Jul 2026
16 Jun 2026
7 Jul 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. | 509.07 | kg | 35.81 | ₹18,229.8 |
| 2 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: Channels, angles, tees and flats | 266 | kg | 2.24 | ₹595.84 |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 58.95 | Cum | 2,004.57 | ₹1,18,169.4 |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 290 | Sqm | 53.17 | ₹15,419.3 |
| 5 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | 794.2 | Sqm | 347.7 | ₹2,76,143.34 |
| 6 | 15 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | 507.94 | Sqm | 400.63 | ₹2,03,496 |
| 7 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 43.95 | Cum | 3,455.37 | ₹1,51,863.51 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : - 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 64.75 | Cum | 8,801.51 | ₹5,69,897.77 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform | 75.6 | Sqm | 902.21 | ₹68,207.08 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc | 54.4 | Sqm | 819.75 | ₹44,594.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
dnit_hathras.pdf
Tender Documents • 1.26 MB
BOQ_959774.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .