| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹5.2 L+₹2.2 L (74.3%)Accepted-Finance | 2 | Accepted-Finance L2 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
8 May 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E. EDC 1 MORADABAD
MORADABAD
Difference type of work in business plan 2024 25 in the area of EDD III Moradabad
2024_PVVNL_923092_2
88/2023-24/EDCIM
Open Tender
Electrical Works
Lump-sum
90 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
S.E. EDC 1 MORADABAD
₹5,000
25 May 2024
1 May 2024
8 May 2024
1 May 2024
8 May 2024
1 May 2024
Amount
Safe carriage of the following material from store center PVVNL to site of workwith loading and unloading at both ends.
PCC pole 8.5 meter long.
250 KVA transformer.
11 KV pin insulator with pin
11 KV disc insulator with fitting
Earthing set complete (MS earth rod 20x2500 mm and 06 SWG earthing wire etc.)
M.S angle for transformer base 75x75x6x2028 mm with clamp and bolts and nut.
M.S. Dropper channel 100x50x2028 mm.
Stay Rod set complete (Stay rod 16x1800 mm, stay wire 5 Kg 7/10 SWG, stay clamp, bolt and nut with grouting etc.)
M.S. Top channel 125x65x2240 mm.
25 KVA transformer
100 KVA transformer
Erection/Fixing & laying/Installation of following materials as per RESPO manual and as per direction to Supervising Engineer (complete in all respect). Work includes the cost of labour,T&P providing nut, bolt and all other acessaries/material for proper completion of work.
Double pole structure with PCC Pole 8.5 mtr with grouting by providing sand, cement and bricks etc. complete work as per RESPO norms.
Fixing of dropper channel on pole as per norms.
Filling stone pad in pits for errection of pole as per norms.
Fixing of MS angle on double pole on pole as per norms.
Earthing of pole by MS Earthing rod of 20x2500 mm and 6 swg earthing wire etc.
Construction of plinth of size 2x2x1.5 meter by providing sand, cement and bricks and all type of material and T&P complete work as per norms.
Safe installation of 250 KVA transformer on plinth, making H.T./L.T. connections and all other work as per norms by providing 20 meter L.T. XLPE of size 3.5x400 sq.mm. cable for connections..
Safe installation of 25 KVA transformer on plinth, making H.T./L.T. connections and all other work as per norms by providing 20 meter L.T. XLPE of size 3.5x400 sq.mm. cable for connections..
Fencing around 250 KVA transformer plinth by providing MS angle and mesh and and all type of material and T&P complete work as per norms.
Uninstalltion of 10 KVA transformer from double pole by opening H.T./L.T. connections and received back to store center majhola Moradabad with loading and unloading at both ends.
Uninstalltion of 100 KVA transformer from double pole by opening H.T./L.T. connections and received back to store center majhola Moradabad with loading and unloading at both ends.
Making jumper with ACSR weasel conductor on pole.
Installtion of 100 KVA transformer on double pole and making H.T./L.T. connections and all other work as per norms.
Inslation of Stay Rod set complete (Stay rod 16x1800 mm, stay wire 5 Kg 7/10 SWG, stay clamp, bolt and nut with grouting etc.)
sharma construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .