Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BLOCK M PHASE 15TH FLOOR NEW ALIPUR MARKET COMPLEX KOLKATA WEST BENGAL INDIA 700053 | KOLKATA | WEST BENGAL | 700053 | Admitted-Finance |
| 2 | Admitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 1 PARSWADA POST SHAHAGANJ VILLAGE | INDORE | INDORE | MADHYA PRADESH | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
15 Jun 2021, 2:00 pmClosed
VIKAS DESHPANDE
Toyo Engineering India Pvt. Ltd. Toyo Technology Centre, 71, Kanjur Village Road, Kanjurmarg (E), Mumbai-400 042
EFFLUENT TREATMENT PLANT UNDER 1.2 MMTPA PX PTA PROJECT
2020_REFHQ_123595_1
IPPX-6394-8840-SC-236-0001
Limited
Lump Sum TurnKey
Lump-sum
790 days
IOCL PARADIP REFINERY
Please refer Tender documents.
3 documents required · 3 mandatory
Exempted
ONLINE OR AT IOCL RHQ DELHI
14 Jul 2021
8 Mar 2021
16 Jun 2021
8 Mar 2021
15 Jun 2021
17 May 2021
10 Mar 2021 - 23 Mar 2021
26 Mar 2021
Amount
PACKAGE-4 ON EPCC BASIS WITH SINGLE POINT RESPONSIBILITY AS DEFINED IN THE BIDDING DOCUMENT
FOREIGN CURRENCY-1
FOREIGN CURRENCY-2
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lump-sum Price for Supply portion for completion of scope of work as per Bidding Document
IN FOREIGN CURRENCY -1
IN FOREIGN CURRENCY -2
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
Engineering Price (Residual Process Design and Detailed Engineering of EPCC Package-4 as per requirements detailed out in various sections of Bidding Document)
IN FOREIGN CURRENCY-1
IN FOREIGN CURRENCY-2
IN INDIAN CURRENCY
Lumpsum Price For Construction Portion as per requirements detailed out in various sections of Bidding Document
IN FOREIGN CURRENCY-1
IN FOREIGN CURRENCY-2
IN INDIAN CURRENCY
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 + 2]
IN FOREIGN CURRENCY-1
IN FOREIGN CURRENCY-2
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
GST on supply of Indigenous goods (part break up of SP-1)
Basic Customs Duty, other import duties and SWS on Duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-1)
IGST / (CGST+SGST) on (Foreign component of SP-1 + (Duties at Sr. 2.1 above)
GST on supply of Services offered by Indian Bidder/ Indian member of consortium/JV, quoted in Indian Currency and Foreign Currency (part break up of SP-2 calculated based on percentage quoted in SP-5)
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for DCS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for ESD Post Warranty maintenance as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for FDAS/GDAS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Analyzers package/AMADAS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for MMS as per Technical Part of Bidding Document for the following
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES FOR EPCC- 03 PACKAGE – 4 AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION FOR EPCC- 03 PACKAGE-4
Description of Work / Item(s)
Amount
Annual charges for Operation & Maintenance of ETP after commissioning
Monthly fixed O&M charges for First year after Commissioning
Monthly fixed O&M charges for Second year after Commissioning
LARSEN AND TOUBRO LIMITED
VA TECH WABAG LIMITED
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
VA TECH WABAG LIMITED
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
VA TECH WABAG LIMITED
PARAMOUNT LIMITED
PARAMOUNT LIMITED
VA TECH WABAG LIMITED
Ion Exchange India Ltd
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
PARAMOUNT LIMITED
VA TECH WABAG LIMITED
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
Ion Exchange India Ltd
VA TECH WABAG LIMITED
PARAMOUNT LIMITED
VA TECH WABAG LIMITED
Ion Exchange India Ltd
PARAMOUNT LIMITED
Bidder Name
PARAMOUNT LIMITED
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
VA TECH WABAG LIMITED
US Dollar
European Euro
Japanese yen
Portion of Quoted Rate in Currency
US Dollar
US Dollar
US Dollar
European Euro
European Euro
US Dollar
US Dollar
US Dollar
European Euro
European Euro
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .