Tender Value
Refer Docs
EMD Value
₹5.1 L
Closing Date
22 Nov 2022, 2:00 pmClosed
Superintending Engineer
Office of the S.E. B.S.C.C.C.-2, MZP
SUPPLY AND LAYING (SUPPLY AND FIXING) 400MM DIA D.I. PRESSURE PIPE CLASS K-9 BETWEEN KM. 1.060 TO 1.718 OF HARRAI MAIN CANAL
2022_UPIDC_749705_1
04/SE/2022-23
Open Tender
Civil Works
Item Rate
180 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹5.1 L
31 Jan 2023
16 Nov 2022
22 Nov 2022
16 Nov 2022
22 Nov 2022
16 Nov 2022
Amount
E/W for excavation on soil mixed with boulder including all lead and lifts labour T&P etc and disposal of exavated materialas per direction of engineer in charge required for proper completion of work.
E/W for excavation in hard rock required blasting including all lead and lifts labour T&P etc and disposal of exavated materialas per direction of engineer in charge Required for proper completion of work.
Providing and laying cement concrete 1:3:6 (M-10) grade including cost all material, labour, T&P etc. required for proper completion of work.
Providing and laying 400mm dia ISI marked D.I. Pressure pipe class-K9 including all cost of material, laying, charges, making joint, feeter charges, labour charges, T&P etc. required for proper completion of work.
Centering and shuttering for C.C./R.C.C work base on pipe junction and other required position to support for pipe and cover joint of pipe.
Carriage, Cutting, Bending, Binding, and placing steel for reinforcemet with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of work.
Providing and laying cement concrete 1:2:4 in base with 4.75 mm. to 20 mm. size graded hard stone grit and coarse sand including centering and shuttering, cost of all material, labour T&P etc. required for proper completion of work.
Filling of earth to fill gap after laying of pipe including cost of material, Labour charges, T&P etc. Required for proper completion of work.
Dismantling stone work or cement mortar including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60m.
CR stone masonary 1:3 with cement and mortar including cost of material, Labour charges, T&P etc. Required for proper completion of work.
Deep struck Cement pointing 1:2 with cement and mortar including cost of material, Labour charges, T&P etc. Required for proper completion of work.
Laying R.C.C. 1:1.5:3 with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit of size 4.75-20 mm. including cost of all material, labour, T&P etc. required for proper completion of work.
Dismantling old D.I/C.I pipes including excavation and refilling trenches after taking out the pipes breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre.
Fabrication of Mild Steel/iron work in grill including cutting,drilling,welding/revetting & hinges,where necessary and fixing in position including cost of all material,labour,T&P etc required for proper complrtion of work.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .