| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-AOC FLAT NO 2450 KRISHNA COLONY JIND 126102 | JIND | HARYANA | 126102 | ₹1.3 Cr | 1 | Accepted-AOC Rates are reasonable |
| 2 | 2₹1.3 CrRejected-Finance HISAR PHE CIRCLE HARYANA | ₹1.3 Cr | 2 | Rejected-Finance Rates are on higher side as compare to L1 |
| 3 | 3₹1.7 CrRejected-Finance VPO DAULATPUR DISTT HISAR 125122 | DAULATPUR | HISAR | HARYANA | 125122 | ₹1.7 Cr | 3 | Rejected-Finance Rates are on higher side as compare to L1 |
| 4 | 4₹1.7 CrRejected-Finance VPO KHARAK POONIA DISTT HISAR 125121 | HISAR | HARYANA | 125121 | ₹1.7 Cr | 4 | Rejected-Finance Rates are on higher side as compare to L1 |
| Sl No | Description | Qty | Unit | NASEEB SINGH CONTRACTOR L3 | KAILASH SINGLA CONTRACTOR L2 | THE GILL CO-OP L AND C SOCIETY LTD L4 | M/S AAR PEE CONSTRUCTION COMPANY JIND L1 |
|---|---|---|---|---|---|---|---|
| 1.10 | Less credit of old Steel | 67.01 | Kg | 15 ₹-1,005.15 | 40 ₹-2,680.4 | 13 ₹-871.13 | 20 ₹-1,340.2 |
| 1.20 | Less credit of old material RCC pipes | 408 | Mtrs. | 60 ₹-24,480 | 200 ₹-81,600 | 40 ₹-16,320 | 70 ₹-28,560 |
| 1.30 | Mechanical works Replacement of existing pumping machineries floculator pump motor with gear supply, erection and testing complete in all respect.
3.00 BHP Motor | 3 | Nos. | 2,00,000 ₹6,00,000 | 1,80,000 ₹5,40,000 | 2,00,000 ₹6,00,000 | 1,25,000 ₹3,75,000 |
| 1.40 | Mechanical works Replacement of existing pumping machineries air blower motor supply, erection and testing complete in all respect.
10.00 BHP Motor | 1 | Nos. | 3,25,000 ₹3,25,000 | 2,50,000 ₹2,50,000 | 3,25,000 ₹3,25,000 | 2,20,000 ₹2,20,000 |
| 1.50 | Mechanical works Replacement of existing pumping machineries air blower,floculator pump motor supply, erection and testing complete in all respect. less credit air blower 10.00 BHP Motor 1 Nos., less credit floculator pump 3.00 BHP Motor 3 Nos. | 4 | Nos. | 25,000 ₹-1,00,000 | 25,000 ₹-1,00,000 | 25,000 ₹-1,00,000 | 20,000 ₹-80,000 |
| 1.60 | Providing , Installation and Commissioning of 150 Wattage LED lights outdoor with Lamp Operation Mode ON, OFF Light Source High Power SMD LED, Lamp Life span of LEDs used in the Luminaire shall be 0 ) 50000 hours. @l L70 ,Color rendering index (CRI) of the LEDs used in the luminaire shall be ) 70 including Cost of all accessors wiring and other material complete in all respect.1 | 6 | Each | 7,500 ₹45,000 | 2,000 ₹12,000 | 8,500 ₹51,000 | 12,500 ₹75,000 |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
7 May 2026, 2:00 pmClosed
ADARSH KUMAR SINGLA
Hisar PHED No. 2
Const. of 1 No. RCC CWT size 11.59 x 7.62x 2.44 mtr., Repair of 400mm RCC Pipe 1453 Mtr.,Repair of Brick Linning S and S Tank No. 4 Nos. ,Repair of Suction Well for R/W and C/W size 1.52 mtr dia, Repair of 2 Nos. Clear Water Tank 4.72 Mtr. Dia , Rep
2026_HRY_517338_1
2026BBBB6AAA 46F8 41C6 AC8A 9CC370D61E55565PUH
Open Tender
Civil Works
420 days
TALWANDI RANA
As per DNIT
3 documents required · 3 mandatory
₹15,000
₹2.9 L
Yes
24 Jun 2026
24 Apr 2026
7 May 2026
24 Apr 2026
7 May 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Less credit of old Steel | - | Kg | - | - |
| 1.2 | Less credit of old material RCC pipes | - | Mtrs. | - | - |
| 1.3 | Mechanical works Replacement of existing pumping machineries floculator pump motor with gear supply, erection and testing complete in all respect.
3.00 BHP Motor | - | Nos. | - | - |
| 1.4 | Mechanical works Replacement of existing pumping machineries air blower motor supply, erection and testing complete in all respect.
10.00 BHP Motor | - | Nos. | - | - |
| 1.5 | Mechanical works Replacement of existing pumping machineries air blower,floculator pump motor supply, erection and testing complete in all respect. less credit air blower 10.00 BHP Motor 1 Nos., less credit floculator pump 3.00 BHP Motor 3 Nos. | - | Nos. | - | - |
| 1.6 | Providing , Installation and Commissioning of 150 Wattage LED lights outdoor with Lamp Operation Mode ON, OFF Light Source High Power SMD LED, Lamp Life span of LEDs used in the Luminaire shall be 0 ) 50000 hours. @l L70 ,Color rendering index (CRI) of the LEDs used in the luminaire shall be ) 70 including Cost of all accessors wiring and other material complete in all respect.1 | - | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html