Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-Finance | L1 | Accepted-Finance Quoting Lowest rate | |
| 2 | L2₹11.6 L+₹4,944 (0.43%)Rejected-Finance DVC PARA MEMARI PURBA BARDHAMAN | MEMARI | PURBA BARDHAMAN | WEST BENGAL | L2 | Rejected-Finance Quoting Higher rate | |
| 3 | L3₹11.6 L+₹7,452 (0.65%)Rejected-Finance | L3 | Rejected-Finance Quoting Higher rate |
| Sl No | Description | Qty | Unit | SASTIK ENTERPRISE L1 | KOUSHIK MONDAL L2 | DURGAPUR POWER L3 |
|---|---|---|---|---|---|---|
| 1.00Total day to day E.I maintenance (Indoor & outdoor ) at the Court Premises & residences.First shift (9 Am to 5 Pm ) Office Hour for 30 days ……….Reliever staffs must be arranged by the Agency if required . | ||||||
| 1.01 | Skilled Workman : 01 man for 12 month | 12 | Month | 26,295 ₹3,15,540 Lowest | 26,485 ₹3,17,820 | 26,596 ₹3,19,152 |
| 1.02 | Unskilled Workman : 01 man for 12 month | 12 | Month | 21,735 ₹2,60,820 Lowest | 21,756 ₹2,61,072 | 21,845 ₹2,62,140 |
| 2.00Total day to day E.I maintenance (Indoor & outdoor ) at the Court Premises & residences.First shift (9 Am to 5 Pm ) Office Hour for 30 days ……….Reliever staffs must be arranged by the Agency if required . | ||||||
| 2.01 | Semi -Skilled Workman : 01 man for 12 month | 12 | Month | 26,295 ₹3,15,540 Lowest | 26,475 ₹3,17,700 | 26,395 ₹3,16,740 |
| 2.02 | Unskilled Workman : 01 man for 12 month | 12 | Month | 21,735 ₹2,60,820 Lowest | 21,756 ₹2,61,072 | 21,845 ₹2,62,140 |
| 3.00Works Permit -i(a) and /or i(b) and ( ii ) issued by DOE , Govt. of WB / ITI Certificate holder in Electrical form Govt. Recognized institute with sufficient practical work experience for semiskilled | ||||||
| 4.00Basic knowledge of electrical works with sufficient experience for unskilled | ||||||
| 5.00Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible. | ||||||
| 5.01A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets | ||||||
Tender Value
Refer Docs
EMD Value
₹23,058
Closing Date
21 Jul 2026, 11:00 amClosed
Sr.Superintending Engineer
Office of the Sr. Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Annual Maintenance of Electrical Installation by engaging manpower at the Old and New SDM Building , Treasury Building , Fire Station and the entire Court Campus and Residence of Asansol in the district of Pashim Bardhaman for One Year.
2026_WBPWD_5016520_1
WBPWD/SSEWEC /AED /NIQ-19 /2026-27
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Pashim Bardhaman
Please refer Tender documents.
5 documents required · 5 mandatory
₹23,058
Office of the Sr. Superintending Engineer, Western
27 Jul 2026
8 Jul 2026
23 Jul 2026
8 Jul 2026
21 Jul 2026
14 Jul 2026
8 Jul 2026 - 13 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Total day to day E.I maintenance (Indoor & outdoor ) at the Court Premises & residences.First shift (9 Am to 5 Pm ) Office Hour for 30 days ……….Reliever staffs must be arranged by the Agency if required . | |||||
| 1.01 | Skilled Workman : 01 man for 12 month | - | Month | - | - |
| 1.02 | Unskilled Workman : 01 man for 12 month | - | Month | - | - |
| 2Total day to day E.I maintenance (Indoor & outdoor ) at the Court Premises & residences.First shift (9 Am to 5 Pm ) Office Hour for 30 days ……….Reliever staffs must be arranged by the Agency if required . | |||||
| 2.01 | Semi -Skilled Workman : 01 man for 12 month | - | Month | - | - |
| 2.02 | Unskilled Workman : 01 man for 12 month | - | Month | - | - |
| 3Works Permit -i(a) and /or i(b) and ( ii ) issued by DOE , Govt. of WB / ITI Certificate holder in Electrical form Govt. Recognized institute with sufficient practical work experience for semiskilled | |||||
| 4Basic knowledge of electrical works with sufficient experience for unskilled | |||||
| 5Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible. | |||||
| 5.01 | A. Scope of Work :
The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.49 MB
new2911.pdf
Tender Documents • 0.51 MB
BOQ_5086105.xls
BOQ • 0.33 MB
CorrieBOQ.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .