| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹8.7 L+₹81,650.30 (10.3%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹9.6 L+₹1.7 L (22.0%)Rejected-AOC | L3 | Rejected-AOC L3 Bidder | |
| 4 | L4₹10.3 L+₹2.4 L (30.3%)Rejected-AOC | L4 | Rejected-AOC L4 Bidder |
Tender Value
₹10.6 L
EMD Value
₹21,260
Closing Date
19 May 2022, 4:00 pmClosed
Executive Engineer, PDA
Office of the Chief Executive Officer, Poonch Development Authority, Near Dak-Bunglow TRC Poonch.
Development of Landscaping, Pathing Tourist Arrival Centre at Ziyarat Sain Miran Baksh.
2022_Tourm_168978_1
e-NITNo04of2022-23Dt10-05-2022
Open Tender
Civil Works
Item Rate
60 days
Ziyarat Sain Miran Sahib Poonch
Please refer Tender documents.
6 documents required · 6 mandatory
₹600
Chief Executive Officer, PDA
₹21,260
5 Jun 2022
11 May 2022
20 May 2022
11 May 2022
19 May 2022
11 May 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth in all kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all work upto plinth level. 1:5:10 (1 cement: 5 fine sand : 10 graded stone aggregated 40mm nominal size)
Providing and laying in position cement concrete in M-10 grade concrete excluding the cost of centering and shuttering all work up to plinth level 1:3:6 (1 cement : 3 coarse sand: 6 graded stone 20 mm nominal size) including cost of centering, shuttering up to plinth v level and carriage of all material up to site of work complete.
Centering and shuttering including strutting, propping etc removing the same.
Cement concrete flooring 40mm thick in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone) finished with a floating coat of neat cement including . cement slurry, but excluding the cost of nosing of steps etc. Complete (crushed).
Providing & Fixing 20mm red stone laid in cement mortar 1:4mix includind all carriages labour rate, wastages, loading,unloadind complete job.
Providing & Flaying plinth protection 50mm thick of cement 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth and curing complete.
Construction of ornamental sitting type V.PT of wooden look in RCC M 1:1:5:3 mix and modelled as Tree Trunk with sloopy RCC roof of Bamboo Finish including wooden type ornamental railing of 2' - 6" height above floor and providing and fixing of 04No's ornamental stool/centre table complete job. Outer width 18' dia Pillar of 1ft dia and 8ft height above floor. Flooring wooden plank look in PCC. Floor level 1.6ft above ground and 2.5ft below ground. As per direction of Engineer In -charge.
Disposal of surplus excacated malba/ earth from site to a addtioon lead of 400mtr through MT including head load.
Carriages of different material by MT.
Cement through a lead of 30Kms by MT.
Carriage of Sand through a lead of 205Kms.
Stone/Bajree through a lead of 16Kms.
TAFAIL HUSSAIN KHAN
Mahnaz Akhter
Ummar Sohail
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .