Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.6 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹4.3 L
EMD Value
₹42,511
Closing Date
9 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE
KMC
Imp. Of C.C. Sarvice lane With Nali from babau colony in Block No 345 to Block No 347 in ward 80 Zone 03
2026_NNKAN_1172719_2
37/A.A.3/26-27
Open Tender
Civil Works
Fixed-rate
30 days
zone 3
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹42,511
18 Nov 2026
28 Sept 2026
9 Oct 2026
28 Sept 2026
9 Oct 2026
28 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | desilting of Covered Nala including etc all comp desilting of covered nala etc all comp | 59.4 | cum | 200 | ₹11,880 |
| 2 | Earth Work in Surface excavation not exceeding 30 cm in depth but ceeding etc all comp | 38.25 | cum | 170 | ₹6,502.5 |
| 3 | R.C.C. Work providing and laying in position cement concrete of specified grade excluding etc all comp | 7.65 | cum | 4,380 | ₹33,507 |
| 4 | Class-150 brick Work in 1:4 cement & coarse sand mortar in foundation and plinth including etc all comp | 17.42 | cum | 6,600 | ₹1,14,998.4 |
| 5 | 15 mm cement plaster on rough side of single or half brick wall finished With a floating coat of neat cement etc all comp. | 118.8 | Sqm | 255 | ₹30,294 |
| 6 | Construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface comp | 9.9 | cum | 3,671 | ₹36,342.9 |
| 7 | R.C.C. work providing and laying in position Ready Mixed concrete manufactured etc all comp | 11.88 | cum | 8,538.54 | ₹1,01,437.86 |
| 8 | R.C.C. Work with cement approved coarse sand and 20 mm approved stone raft etc all comp | 0.86 | cum | 8,600 | ₹7,430.4 |
| 9 | M.S or iron in plain Work such as hevey size as fabrication of M.S or iron in plain Work such etc all comp | 0.68 | Qtl | 7,200 | ₹4,896 |
| 10 | Supply and fixing of Sign board With pedatal including all labour Work Supply and fixing of Sign board With etc all comp | 1 | Nos | 3,840 | ₹3,840 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.61 MB
BOQ_2244196.xls
BOQ • 0.22 MB
tn091026.pdf
Tender Documents • 6.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .