Loading…
Loading…
Tender Value
₹66.0 L
EMD Value
₹1.3 L
Closing Date
12 Feb 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TRACK
14 conditions · 3 needing a document upload
For works costing more than Rs.50 lakhs - The tenderer must have minimum average annual contractual turnover of V/N or 'V' which ever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
A-1 Any track work
22 conditions · 3 needing a document upload
Submission of Annexure-V under Document Verification Certificate- As per Advance Correction Slips to GCC - 2022, the tenderers shall submit copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of the certificate to be submitted by the bidder in form of Annexure V. Non-submission of the above Certificate(s) by the bidder shall result in summarily rejection of his/their bid.
Submission of Annexure-V(A) under Document Verification Certificate : In case of other than Company/Proprietary firm, Annexure-V(A) shall also be submitted by the each member of a Partnership Firm/Joint Venture (JV) /Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc., as the case may be. Non-submission of the above Certificate (s) by the bidder shall result in summarily rejection of his/their bid.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Copies of the following documents are to be uploaded: (i) Details such as Name of the tenderer/ Contractor, Validity of DSC, Complete address with pin code, Contact Number (ii) Copy of PAN Card (iii) Copy of GSTIN card
A copy of NEFT form duly filled in the details as necessary to be uploaded. (The Tenderer/ Contractor not having NEFT form may down load the empty NEFT form available in document site)
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family( HUF) / Limited Liability Partnership (LLP)etc. The tenderer(s) shall enclose the attested copies of the requisite documents(including Power of Attorney, if opted) for constitution of their concern as per clause 14 of GCC Part I and as per a) Clause 17 of GCC Part I, for JV b) Clause 18 of GCC Part I, for Partnership firm
All the instructions furnished in the Technical compliance/ Commercial Compliance/ Check-list/ Undertakings are only indicative and not exhaustive; The Tenderer shall read the GCC/Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere to the instructions and directions given therein.
If the Tenderer(s) deliberately give(s) wrong information/ or create incorrect documents in his/their offer or create circumstances for the acceptance of his/their offer, the Railway reserves the right to reject such offer at any stage.
All terms and conditions in the tender documents are binding on the Tenderers
Railway reserves the right to accept or reject any or all the tenders and to award the work in whole or in part without assigning any reason.
Unreleased Bid Security, if any, held with the Railway Administration, shall not be adjusted towards the Bid Security to be remitted.
Bid Security shall be deposited either in cash through e-payment gateway or e-BG or submitted as Bank Guarantee bond from a scheduled bank of India or as mentioned in tender documents subject to exemptions provided under para5(1) (a) of Part-1 (ITT) of GCC.
In case of submission of Bid Security in the form of Bank Guarantee, the Original Bank Guarantee (other than e-BG) should be delivered in person to the Official nominated as indicated in the Tender document within 5 working days before the closing date of submission of bids.
MS - VM - Section:-TFR - 29.200 Km (Plain Track), T/O 1in 8.5 (52kg) -4 nos (TMV- 63A, 52A & CGL- 137B, 136B), T/O 1in 12 (52kg) - 5 nos (CGL - 133A, 133B, 132A, 139B,136A), T/O 1in 12 (60kg) 3 nos (CGL-129A, 130A,116B) & T/O 1in 16 (60kg) - 2 nos (CGL - 129B, 109A) and TBR (Plain Track) - 0.981 km ( CGL siding 1- 0.432 Km & CGL siding 2 - 0.549 Km)
MAS03OF26016S~SR
MAS03OF26016S
Open
Works - General
12 Months
Chennai, Tamil Nadu
₹0
₹1.3 L
12 Feb 2026
20 Jan 2026
29 Jan 2026
41 items across 6 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 62,69,966.39 | ||
| — | — | — | Above/ 380214.98 Below/P | ||
| 1) MS - VM section : Through Fitting Renewal (Plain Track) 60kg/(M+8)perkm for a length of 1.807 km - at CTM- Common loop Rd 1-60kg- 0-0.099km, SKL- Rd 4 - 60kg - 0-0.45km, CGL- ROAD 5-60kg - 0-0.090km, CGL-ROAD 7- 60kg - 0-0.04km, OV-COMMON LOOP RD 1- 60kg- 0-0.30km, KGZ- Common loop Rd 1- 60kg - 0-0.43km, MLMR-Common loop Road2- 60kg - 0-0.08km, PEI-ROAD 4 DN LOOP- 60kg - 0-0.12km, CGL-SL- 60kg - 0-0.198km. | details. | Breakup for | — | — | |
| — | — | — | Above/ 4845523.11 Below/P | ||
| 2) MS - VM section : Through Fitting Renewal (Plain Track) 52kg/(M+7) per km for a length of 27.393 km from CTM- Common loop Rd 1 52kg- 0.83km, SKL- SKL LOOP RD 1 -52kg- 0.93km, BUFFER STOP 2 SKL ROAD 2- 52kg- 0.13km, BUFFER STOP 1 SKL ROAD 1- 52kg- 0.14km, SKL- Rd 4- 52kg- 0.62km, CGL-ROAD 3- 52kg- 1.24km, CGL-ROAD 5- 52kg -1.09km, CGL-ROAD 7 - 52kg- 0.23km, CGL-ROAD 8 -52kg- 0.99km, CGL-ROAD 9 TMS -52kg- 0.35km, CGL- Road 2 - 52kg - 1.002Km, CGL- Siding 2- 52kg- 0.22km, CGL-Siding 3 -52kg - 0.17km, CGL-Towerwagon siding-52kg- 0.09km,OV-COMMON LOOP RD 1-52kg- 0.83km, OV-DN LOOP RD 4- 52kg - 1.055km,KGZ- Common loop Rd 1-52kg- 0.92km, KGZ-Down loop Rd 4-52kg- 1.3km, MLMR-Common loop Road2-52kg- 1.2km, TZD-Road 1 UP LOOP- 52kg- 0.93km, TZD-Road 4 DNLOOP-52kg- 0.98km, OLA- ROAD 5 UP LOOP-52kg- 1.14km, TMV-ROAD 3 DOWN LOOP- 52kg- 0.93km, MTL-ROAD 1 DN LOOP- 52kg- 0.85km, MTL-ROAD 4 UP LOOP- 52kg- 0.94km, PEI-ROAD 1 UP LOOP- 52kg- 0.96km, PEI-ROAD 4 DN LOOP- 52kg- 0.86km, VVN-Road1DOWN LOOP- 52kg- 1.13km, VVN -Road 4 UPLOOP-52kg-1.096km, MYP- ROAD 1 UP LOOP- 52kg- 0.96km, MYP-ROAD 3 COMMON LOOP- 52kg- 0.98km, MYP-ROAD 5 DOWN LOOP-52kg- 0.99km, MYP-SIDING- 52kg= 0.71km, CGL-SL-52kg- 0.60km. | details. | Breakup for | — | — | |
| — | — | — | Above/ 247476.52 Below/P | ||
| 3) (i) MS- VM Section - Through Fitting Renewal of 52 kg 1 in 8.5 Points & Crossings - 4 nos (TMV- 63A, 52A & CGL- 137B, 136B)(ii) MS- VM Section - Through Fitting Renewal of 52 kg 1 in 12 Points & Crossings - 5 nos (CGL - 133A, 133B, 132A, 139B,136A) | details. | Breakup for | — | — | |
| — | — | — | Above/ 147186.33 Below/P | ||
| 4) (i) MS- VM Section - Through Fitting Renewal of 60 kg 1 in 12 Points & Crossings - 3 nos (CGL-129A, 130A,116B)(ii) MS- VM Section - Through Fitting Renewal of 60 kg 1 in 16 Points & Crossings - 2 nos (CGL - 129B, 109A) | details. | Breakup for | — | — | |
| — | — | — | Above/ 649565.45 Below/P | ||
| 5) MS-VM Section - TBR (Plain Track) - 0.981 km ( CGL siding 1- 0.432 Km & CGL siding 2 - 0.549 Km) with Deep screening by BCM/Manual deep screening. | details. | Breakup for | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NEFTForm.pdf
ATTACHMENT
ProcedureforLCModeofPayment.pdf
ATTACHMENT
GCCApril2022_compressed.pdf
ATTACHMENT
eTenderformApril2022.pdf
ATTACHMENT
CTRTRRandTSRworks.pdf
ATTACHMENT
SNWmasterlistason09012026.pdf
ATTACHMENT
IRGCCACS1to10_compressed.pdf
ATTACHMENT
specialconditionsofcontractfortrackworksDEC2025.pdf
ATTACHMENT
FORMATIONBUILDINGBRIDGEPWAYWORKSJULY2024_1.pdf
ATTACHMENT
MOVEMENTOFVEHICLESNEARRAILWAYTRACK.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .