Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -43.65% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 LAdmitted-Finance | -40.00% | ₹1.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.7 LAdmitted-Finance | -39.40% | ₹1.7 L | L3 | Admitted-Finance |
| 4 | L4₹1.8 LAdmitted-Finance | -35.50% | ₹1.8 L | L4 | Admitted-Finance |
| 5 | L5₹2.0 LAdmitted-Finance | -27.91% | ₹2.0 L | L5 | Admitted-Finance |
Tender Value
₹3.2 L
EMD Value
₹6,360
Closing Date
23 Mar 2026, 6:00 pmClosed
EE PHED Division Jalore
EE PHED Division Jalore
PROPOSALS FOR O and M OF PUMP HOUSE, ALL DISTRIBUTION SYSTEM, ALL RISING MAINS OF COMPLETED JJM SCHEME, VILLAGE SAMTIPURA UNDER DISTRICT SUB DIVISION JALORE, DISTRICT JALORE
2026_PHCJO_545199_1
NIT No 102/2025-26
Open Tender
Civil Works
365 days
Jalore
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Secretary, RREIS
₹6,360
Yes
27 Mar 2026
11 Mar 2026
24 Mar 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
Based on O&M BSR
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department.
Minimum labour for a following kms pipelines to be deployed.
1 km to 50 km - one fitter-II & one beldar
51 km to 100 km - one fitter-II & Two beldar
101 km to 200 km - Two fitter-II & Four beldar
201km to 300 km - Three fitter-II & Six beldar
301 km to 400 km - Four fitter-II & Eight beldar
401 km to 500 km - Five fitter-II & Ten beldar
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department.
Maintenance of centrifugal pump sets and motor/ Monoblock including cost of rewinding of motor, material components & accessories required to repair pumpsets, starters etc. of electric panels, deinstallation and re installation of pumpsets complete in all respect for per Centrifugal pump set with pannel per month. maintenance of histroy sheet as directed by Engineer-in-charge for centrifugal pump set per month. Operated load of Centrifugal Pump sets (HP)
6.0 HP to 12.5 HP
One Year O& M
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.50 MB
tenderdocuments.pdf
Tender Documents • 9.05 MB
BOQ_972420.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid