Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.6 CrAccepted-AOC | ₹6.6 Cr Quoted ₹7.1 Cr | 1 | Accepted-AOC Lowest Negotiated Bidder |
| 2 | 2₹7.3 Cr+₹19.8 L (2.80%)Rejected-Finance | ₹7.3 Cr+₹19.8 L (2.80%) | 2 | Rejected-Finance Quoted amount is more. Not eligible for negotiation |
| 3 | 3₹7.5 Cr+₹46.1 L (6.54%)Rejected-Finance | ₹7.5 Cr+₹46.1 L (6.54%) | 3 | Rejected-Finance Quoted amount is more. Not eligible for negotiation |
Tender Value
₹6.8 Cr
EMD Value
₹3.4 L
Closing Date
1 Oct 2019, 3:00 pmClosed
Superintending Engineer H C and M Chennai Circle
No.299 Anna salai, Teynampet chennai - 600006
Construction of Drain including Improvements and Formation of Service Road in Tambaram (H) C and M Sub Division Jurisdiction
2019_HWAY_135962_1
package 11 / 2019-20
Open Tender
Civil Works - Highways
Percentage
270 days
Tambaram
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹3.4 L
5 Mar 2020
30 Aug 2019
4 Oct 2019
30 Aug 2019
1 Oct 2019
17 Sept 2019
3 Sept 2019 - 9 Sept 2019
eProcurement System Government of Tamil Nadu Created By: J Subramanian Created Date/Time: 13-Oct-2019 07:23 AM Tender Title: Package 11 Tender ID: 2019_HWAY_135962_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Chennai Circle
Name of work : Package 11 --Improvements, Construction of Macro Drain Formation of Service Road works including upkeeping in Tambaram (H) C&M Sub Division Jurisdiction A) Construction of Macro Drain at Km 5/535 - 5/575 of Marmlong Bridge - Irumbuliyur -Vandalur -Mudichur -Oragadam - Walajabad Road (SH 48 ) (01 -- CRIDP -- 19 -- 20 -- S -- 0039) B) Construction of Macro Drain at Km 5/575 -5/620 of Marmlong Bridge - Irumbuliyur -Vandalur -Mudichur -Oragadam - Walajabad Road (SH 48 ) (01 -- CRIDP -- 19 -- 20 -- S -- 0040) C) Formation of service road at Km 8/6 --9/0 of Marmlong Bridge - Irumbuliyur -Vandalur -Mudichur -Oragadam - Walajabad Road (SH 48 ) (01 -- CRIDP -- 19 -- 20 -- S -- 0008) D) Improvements to Riding Quality at Km 0/6 - 2/6 (LS) of Taramani Link Road including upkeeping for a period of 60 months (01 -- CRIDP -- 19 -- 20 -- I -- 3782)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SPL INFRASTRUCTURE PVT. LTD 58856741.730 10.000 72511506.000 Seven Crore Twenty Five Lakh Eleven Thousand Five Hundred and Six
2.00 Gurumurthy Engineering Enterprises 58856741.730 14.000 75148288.000 Seven Crore Fifty One Lakh Fourty Eight Thousand Two Hundred and Eighty Eight
3.00 D. TAMILRAJAN 58856741.730 7.000 70533920.000 Seven Crore Five Lakh Thirty Three Thousand Nine Hundred and Twenty
Lowest Amount Quoted BY: D. TAMILRAJAN(70533920.000)
BOQ Summary Details Tender Title: Package 11 Tender ID: 2019_HWAY_135962_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 D. TAMILRAJAN 70533920.000 L1
2 SPL INFRASTRUCTURE PVT. LTD 72511506.000 L2
3 Gurumurthy Engineering Enterprises 75148288.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .