Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAdmitted-Finance | ₹8.6 L | L1 | Admitted-Finance |
| 2 | L2₹9.1 L+₹42,503.60 (4.93%)Admitted-Finance | ₹9.1 L+₹42,503.60 (4.93%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A.S.ENTERPRISES L2 | M.B. Enterprises L1 |
|---|---|---|---|---|---|
| 1.01 | Disconnection of HT supply from the main HT panel after proper switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required. | 1 | Job | 30,000 ₹35,400 | 28,350 ₹33,453 Lowest |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precautions to prevent the winding damage as required cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job | 82,000 ₹96,760 | 79,200 ₹93,456 Lowest |
| 1.03 | Cleaning of winding with DC 2-26 | 300 | Nos. | 97,500 ₹1,15,050 | 92,880 ₹1,09,598.4 Lowest |
| 1.04 | Replacements of top cover gasket, vertical vent gasket & missing hardware to stop the oil leakage. | 1 | Job | 32,000 ₹37,760 | 29,250 ₹34,515 Lowest |
| 1.05 | Replacement of silica gel. | 1 | Job | 3,500 ₹4,130 | 3,240 ₹3,823.2 Lowest |
| 1.06 | Repairing of tape changer. | 1 | Job | 30,000 ₹35,400 | 29,250 ₹34,515 Lowest |
| 1.07 | Repairing of LT copper bolt and pam, remateling and finishing the same as per original shape and size. | 4 | Jobs | 96,000 ₹1,13,280 | 90,000 ₹1,06,200 Lowest |
| 1.08 | Checking & Matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays testing the same. | 1 | Job | 18,500 ₹21,830 | 17,460 ₹20,602.8 Lowest |
| 1.09 | Complete assembling of transformer cleaning of complete 01 side and testing & checking of IR test with Meggierofowintting & transformer tightening of all connection of incoming Brit Burg BUDGET WAT cable of both sides with HI pot machine. | 1 | Job | 35,000 ₹41,300 | 33,390 ₹39,400.2 Lowest |
| 1.10 | Providing & fixing of winding protection pad. | 1 | Job | 21,500 ₹25,370 | 19,800 ₹23,364 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,400
Closing Date
6 Jul 2026, 11:15 amClosed
EE ENM M-7
MU BLOCK PITAMPURA, DELHI-34
Servicing overhauling dehydration of Bharat Bijli make 2000 KVA transformer No 2 at Peeragarhi BPS in AC 15
2026_DJB_294525_10
NIT No. 06(2026-27)M-VII
Open Tender
Miscellaneous Works
Item Rate
60 days
EE ENM M-7
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No 50448339804
₹17,400
Yes
9 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Disconnection of HT supply from the main HT panel after proper switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required. | 1 | Job | 80 | ₹80 |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precautions to prevent the winding damage as required cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job | 80 | ₹80 |
| 1.03 | Cleaning of winding with DC 2-26 | 300 | Nos. | 80 | ₹24,000 |
| 1.04 | Replacements of top cover gasket, vertical vent gasket & missing hardware to stop the oil leakage. | 1 | Job | 80 | ₹80 |
| 1.05 | Replacement of silica gel. | 1 | Job | 80 | ₹80 |
| 1.06 | Repairing of tape changer. | 1 | Job | 80 | ₹80 |
| 1.07 | Repairing of LT copper bolt and pam, remateling and finishing the same as per original shape and size. | 4 | Jobs | 80 | ₹320 |
| 1.08 | Checking & Matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays testing the same. | 1 | Job | 80 | ₹80 |
| 1.09 | Complete assembling of transformer cleaning of complete 01 side and testing & checking of IR test with Meggierofowintting & transformer tightening of all connection of incoming Brit Burg BUDGET WAT cable of both sides with HI pot machine. | 1 | Job | 80 | ₹80 |
| 1.1 | Providing & fixing of winding protection pad. | 1 | Job | 80 | ₹80 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_391604.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .