| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹12.5 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹12.5 L | H1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | H2₹12.3 L−₹13,592.30 (1.09%)Admitted-Fee/PreQual/Technical/Finance | -1.10% | ₹12.3 L−₹13,592.30 (1.09%) | H2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | H3₹9.7 L−₹2.8 L (22.1%)Admitted-Fee/PreQual/Technical/Finance | -22.09% | ₹9.7 L−₹2.8 L (22.1%) | H3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | H4₹9.7 L−₹2.8 L (22.3%)Admitted-Fee/PreQual/Technical/Finance | -22.35% | ₹9.7 L−₹2.8 L (22.3%) | H4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | H5₹9.6 L−₹2.9 L (23.0%)Admitted-Fee/PreQual/Technical/Finance | -23.00% | ₹9.6 L−₹2.9 L (23.0%) | H5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.5 L
EMD Value
₹24,940
Closing Date
10 Aug 2026, 2:00 pmClosed
Executive Engineer
Irrigation Division Kulgam
Reactivation of Supply channel of Tengwani Bumthan Ladh
2026_IFC_318978_4
e-NIT 08 of 2026-27
Open Tender
Civil Works - Canal
Percentage
20 days
Kulgam and Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Chief Engineer IFC Kashmir
₹24,940
18 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 0.6 | cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer. But excluding ramming and watering, lead upto 50 m and lift upto 1.5 m. | 0.8 | cum | - | - |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 1 | cum | 1 | ₹1 |
| 4 | Supply of stones Nallah( stack Measurement reduced by 15%) including CP + GST 18% | 1 | cum | - | - |
| 5 | Dumping stone excluding cost of stones.in Horizontal on level | 1 | cum | - | - |
| 6Supply of 4mm GI wire crates 4" X 4" Mesh 16 x16 sft size as per IS specification including all carriage | |||||
| 7Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | |||||
| 8Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | |||||
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | cum | 1 | - |
| 10Carriage of material by Mechanical transport and Headload from source to actual site of work including loading,unloading ,stacking complete job. | |||||
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_1054261.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .