| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAccepted-AOC | ₹9.9 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹13.4 Cr+₹3.5 Cr (35.1%)Rejected-Finance | ₹13.4 Cr+₹3.5 Cr (35.1%) | L2 | Rejected-Finance NOT L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical IN UPLOADED SUMMARY |
| 4 | Rejected-Technical BLOCK C32 VIKAS NAGAR VIKAS NAGAR NEW DELHI NEW DELHI WEST WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | - | - | Rejected-Technical IN UPLOADED SUMMARY |
| 5 | Rejected-Technical | - | - | Rejected-Technical IN UPLOADED SUMMARY |
Tender Value
₹14.4 Cr
EMD Value
₹18.0 L
Closing Date
22 Jul 2022, 11:00 amClosed
General Manager (Civil) HQ NCL
Office of the General Manager (Civil) HQ NCL P.O. Singrauli Colliery, Dist. Singrauli (M.P.) 486889 Phone No. 07805-256431,266588, Fax No. 07805-266640
Planning, Design, Engg., Construction, Fabrication, Erection, Supply, Installation, Testing, Trial Run and Commissioning towards upgradation/modification of existing ETP on turnkey basis incl. Operation and Maintenance for five years for Bina OCP,NCL
2022_NCL_245991_1
GM(C)/SGR/22-23/ETN-07 Date 09.06.2022
Turnkey
Civil Works - Others
Item Rate
2125 days
Bina OCP of NCL Located at Distt. Sonebhadra, UP
Please refer Tender documents.
8 documents required · 8 mandatory
₹18.0 L
Office of the General Manager (Civil) HQ NCL
30 Nov 2022
9 Jun 2022
23 Jul 2022
9 Jun 2022
22 Jul 2022
21 Jun 2022
9 Jun 2022 - 5 Jul 2022
20 Jun 2022
Amount
SURVEY, SOIL TESTING & DESIGN ENGINEERING COST
Detailed survey of the area within battery limit and submission of work
Sub-soil exploration, field & laboratory testing of samples and submission of report
Design Engineering cost for GA and detailed engineering design and drawing of all civil and structural works in the system
PRICE BREAKUP FOR CIVIL AND STRUCTURAL WORK
CIVIL WORK INCLUDING SITE DEVELOPMENT, ALL MATERIALS, LABOUR ETC.
Civil and Structural work including developmental work and infra-structure etc
Other misc. items (civil, structural, developmental & infrastructural) required to complete the project.
PRICE BREAKUP OF PLANT AND MACHINERY
SUPPLY: MECHANICAL SYSTEM
Pumps, motors, pipes, fitings etc. (as per NIT)
Process Equipment (as per NIT)
SUPPLY: ELECTRICAL SYSTEM
Electrical system incluseding transformer, power supply and illumination etc. (as per NIT)
ERECTION, INSTALLATION AND COMMISSIONING OF PLANT AND MACHINERY
Design Engineering cost for mechanical and electrical systems
Erection, installation and commissioning of all plant and machineries of mechanical and electrical systems
OPERATION AND MAINTENANCE COST OF EXISTING ETP AND PROPOSED NEW UNITS FOR A PERIOD OF 5 YEARS (DLP) DEFECT LIABILITY PERIOD
Cost of operation and maintenance of of the existing ETP and proposed new units including cost of consumables etc. of all plant and machinery during defect liability period, all work as per requirement but excluding the cost of item no. 5.2 and 5.3 below
Cost towards procurement of reagents, daily on site testing of raw and treated effluent of ETP for COD, pH, O&G & TSS by qualified environmental engineer/diploma holder/ chemist, weekly testing from authorised lab./ lab. recognised by the MOEF&CC/NABL/CPCB/UPSPCB/MPPCB as per Environmental Protection Act (EPA)/1986 or as per MOEF Notifications /Gazette notifications for obtaining consent letter of Air and Water from U.P. & M.P. state as per norms and specification, including cost of all during 5 years period. Manpower one no. daily.
Cost towards repairs and maintenance of equipment, pumps, motors and electric switch, panel (periodic preventing as per OEM guideline including breakdown maintenance) replacement of worn out/damage parts from OEM and housekeeping including supply of spare parts, lubricants, gland packing and gear oil by deploying minimum one labour daily and fitter/electrician in alternate days as per requirement and as per direction of EIC during 5 years period. Manpower two nos. daily.
FREIGHT, PACKING & FORWARDING COST
Freight, Packing & forwarding cost of all mechanical and electrical systems etc (as per NIT)
Total impact of GST for the purpose of CTC
Brij Engineering Works
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .