| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.1 LAccepted-Finance | ₹63.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹74.1 LAccepted-Finance SHRI RAM VILA UDAI SINGH JAIN RAOD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹74.1 L | L2 | Accepted-Finance L2 |
| 3 | L3₹75.3 LAccepted-Finance | ₹75.3 L | L3 | Accepted-Finance L3 |
| 4 | L4₹75.4 LAccepted-Finance | ₹75.4 L | L4 | Accepted-Finance L4 |
| 5 | Rejected-Technical 505 A VIKAS NAGAR ETAH | - | - | Rejected-Technical As Per Check List |
Tender Value
₹76.8 L
EMD Value
₹5.8 L
Closing Date
6 Feb 2026, 5:00 pmClosed
Dy. Director (Const.)
Mandi Parishad Aligarh
Construction of Link Road from Utherpukta Gram Nagla Patia Shiv Mandir to Gaupura Road.
2026_RKUMP_1107452_1
2026-2589-9/14.01.2026
Open Tender
Civil Works - Roads
180 days
Kasganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹13,600
Dy. Director(Const.) Mandi Parishad
₹5.8 L
Yes
24 Feb 2026
20 Jan 2026
7 Feb 2026
20 Jan 2026
6 Feb 2026
20 Jan 2026
Part A - Earth work in cutting in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50m n depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slops and also including lift 1.5m and lead 30m the earth inform of cutting to be used as spoil banks within 50m distance as directed by the E/I . S.I. No 253 (a)
Construction of granular sub-base by providing well graded material, mixing in a uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the disired density, complete as per technical specification clause 401
Water Bound Macadam Sub-base (A) W.B.M. Grade-2 Providing laying spreading and compacting stone aggregates of specific size to water bound macadam, specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 Km in stages to proper grad and camber, applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggretate, watering and compecting to the required density grading 2 as Per Technical specification clause 405 (2)
Water Bound Macadam Sub-base (A) W.B.M. Grade-3 Providing laying spreading and compacting stone aggregates of specific size to water bound macadam, specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 Km in stages to proper grad and camber, applying and brooming stone screeing/binding materials to fill-up the interstices of coarse aggretate, watering and compecting to the required density grading 3 as Per Technical specification clause 405 (2)
Providing and applying Tack coat with bitumen VG-10 using bitumen pressuredistriutor at the rate of 0.30kg/sqm on the prepared primed granular/old painted surface, cleaned with Machanical broom including all Taxes, Material, Labour, T&P etc. required for proper completion of the work, as per MORD specification No. 503 (Rates Including of Bitumen VG-10)
Providing and laying & rolling of open graded premix carpet of 20mm thickness composed of 13.20 to 5.60 mm aggregates including mixing in a suitable plant, laying with a three wheele 80-100KN static Rooler capacity, finished to required leve & grades Bitumen @ 14.6Kg/10Sqm agea for premixing including Taxesx, Material, Labour and T&P etc required for proper completion of the work as per MORD specification No. 508 ( Rates including of Bitumen VG-10)
Providing and laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 513
Brick edging on both side of the road of M-150 bricks 8cm (3") wide and 12cm (4 1/2) deep laid with mud nortar including all labour and supply of brick finished to reqired template & ramming the excavated eart as directed by the Engineer-in- Charge.
Providing & fixing Typical informatory sign board asper MORD specification and drawing. Three M.S. plate of 1.6 mm thick, top and middle plate duty welded with M.S. flat iron 25mm x 5 mm size on back on edges. The lower plate will be welded with M.S angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75mm of 12 SWG sheet tubes post duly embedded in cement conc. M-15 grade black of 450mm x 450mm x 600mm below ground level. All M.S. will be stove enametat on both sides. Lettering and Printing arrows, border etc.will be painted with ready mixed sign thick enamd paints of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paints as per drawing clause 1701 and annexure 1700.
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m & lead upto 30m & including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or into the plinth & removal & disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. (SI 251)
Providing & laying cement concrete in 1:6:12 (1 cement : 6 coarse sand : 12 graded stone ballast 40mm nominal size) & curing complete, including cost of form work. In Foundation & floors. (SI 273) A
Class-150 brick work in 1:4 cement & Coarse sand of 2.25 fineness modulus mortar in foundation & plinth including supply of all material, labour & T&P etc. required for proper completion of the work.
Struck pointing in 1:2 cement and fine sand including supply of all materials labour and T&P etc. required for proper completion of work.
Supply of 350MM dia R.C.C. Hume pipe including supply of all materials labour and T&P etc. required for proper completion of work.
Laying & fixing of 350MM dia R.C.C. Hume pipe including supply of all materials labour and T&P etc. required for proper completion of work.
Maintainance of First Year (@0.00% of Total Work Amount of Part A
Maintainance of Second Year (@0.75% of Total Work Amount of Part A
Maintainance of Third Year(@1.50% of Total Work Amount of Part A
Maintainance of Fourth Year (@2.25% of Total Work Amount of Part A
Maintainance of Fifth Year (@3.00% of Total Work Amount of Part A
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
BOQ_2043898.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid