Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.1 LAccepted-AOC | ₹83.1 L Quoted ₹99.0 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹99.9 L+₹84,903 (0.86%)Rejected-AOC | ₹99.9 L+₹84,903 (0.86%) | L2 | Rejected-AOC highest bidder |
| 3 | Rejected-Technical WARD NO 06 PURANI ABADI SRI GANGANAGAR | - | - | Rejected-Technical Bidder does not fulfill PQR |
| Sl No | Description | Qty | Unit | SHREE SAI KRIPA ENTERPRISES | SHRI LAXMI ASSOCIATES |
|---|---|---|---|---|---|
| 1.00 | Supply of material for replacement of Festoon Trolley system by High Performance energy chain system for side Arm Charger of WT#3&4 CHP, KaTPP, Jhalawar as per technical specification-Annexure-I and scope of work -Annexure-II attached | 2 | Set | 44,84,142.78 ₹89,68,285.56 | 44,78,100 ₹89,56,200 Lowest |
| 2.00 | ETC work for replacement of Festoon Trolley system by High Performance energy chain system for side Arm Charger of WT#3&4 CHP, KaTPP, Jhalawar as per technical specification-Annexure-I and scope of work -Annexure-II attached | 2 | Set | 5,08,408.9 ₹10,16,817.8 | 4,72,000 ₹9,44,000 Lowest |
Tender Value
₹97.9 L
EMD Value
₹2.0 L
Closing Date
28 Mar 2026, 3:00 pmClosed
SE(MM)
O/o of SE(MM), KaTPP, Jhalawar
REPLACEMENT OF FESTOON TROLLEY SYSTEM BY HIGH PERFORMANCE ENERGY CHAIN SYSTEM FOR SIDE ARM CHARGER OF WT 3 AND 4 IN CHP, AT KATPP, JHALAWAR
2026_RRVUN_543961_1
TN-1277(MM)
Open Tender
Electrical Goods/Equipments
Item Wise
180 days
KALISINDH THERMAL POWER PROJECT
As per tender documents of Pg. No.6
3 documents required · 3 mandatory
₹1,180
Sr.AO, KaTPP
₹2.0 L
18 Jun 2026
7 Mar 2026
28 Mar 2026
7 Mar 2026
28 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of material for replacement of Festoon Trolley system by High Performance energy chain system for side Arm Charger of WT#3&4 CHP, KaTPP, Jhalawar as per technical specification-Annexure-I and scope of work -Annexure-II attached | 2 | Set | - | - |
| 2 | ETC work for replacement of Festoon Trolley system by High Performance energy chain system for side Arm Charger of WT#3&4 CHP, KaTPP, Jhalawar as per technical specification-Annexure-I and scope of work -Annexure-II attached | 2 | Set | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.08 MB
BOQ_970036.xls
BOQ • 0.35 MB
ETN1277.pdf
Tender Documents • 5.52 MB
NITEXTENSION1.pdf
PDF • 15.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .