| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.4 LAccepted-AOC 81 1 1 MUTHUKRISHNAPURAM 6TH STREET THOOTHUKUDI 628 002 | THOOTHUKUDI | THOOTHUKUDI | TAMIL NADU | 628002 | ₹27.4 L | L1 | Accepted-AOC qualified |
| 2 | L2₹28.0 LRejected-AOC | ₹28.0 L | L2 | Rejected-AOC qualified |
| 3 | L3₹29.8 LRejected-AOC NO 6 I 24 AYYAKKARAN THOTTAM VAIGAI VADAKARAI MADURAI 625 002 | MADURAI | MADURAI | TAMIL NADU | 625002 | ₹29.8 L | L3 | Rejected-AOC qualified |
| Sl No | Description | Qty | Unit | Petchimuthu L3 | SELVAN AND CO L1 | SURYAVEL ASSOCIATES L2 |
|---|---|---|---|---|---|---|
| 1.00Name of Work: CONSTRUCTION OF 60000 of OHT (12.00m stage)litre capacity of OHT Borewell and 5HP Motor Extension of Pipeline (870 m)arrangement at Mangalakurichi village Panchayat in srivaikundam Panchayat Union Thoothukudi district underthe Scheme of 15th CFC 2025-2026 (BP) | ||||||
| 2.00Earth work excavation and depositing on bank with initial lead 10m and lift of 2.0m in the following classification of soils, bailing out water wherever necessary including providing danger lights etc., and as directed as per specification SS 20B and special specification. in Hard rock Rock requiring blasting as per standard specifications and as directed by the Engineer | ||||||
| 3.00 | First depth of 2m for column foundation | 62.72 | cum | 265 ₹16,620.8 | 261.14 ₹16,378.7 Lowest | 263.7 ₹16,539.26 |
| 4.00 | Second depth of 2m for column foundation | 9.41 | cum | 285 ₹2,681.85 | 273.44 ₹2,573.07 Lowest | 276.15 ₹2,598.57 |
| 5.00Sand filling for foundation with M sand including consolidation ramming etc. complete as per standard specifications and as directed by the Engineer-incharge | ||||||
| 6.00 | For column Foundation | 3.14 | cum | 1,780 ₹5,589.2 | 1,739.54 ₹5,462.16 Lowest | 1,757.1 ₹5,517.29 |
| 7.00Plain Cement concrete 1:4:8 for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing and curing etc., complete and as directed for works beyond 1.50m and upto 4.50m depth below ground level | ||||||
| 8.00 | For column Foundation | 4.7 | cum | 5,395 ₹25,356.5 | 5,334.16 ₹25,070.55 Lowest | 5,388 ₹25,323.6 |
| 9.00Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | ||||||
| 10.00 | (i) below 1.50m to 4.50m depth from G.L for Footing | 9.28 | cum | 9,290 ₹86,211.2 | 9,182.31 ₹85,211.84 Lowest | 9,275 ₹86,072 |
Tender Value
₹28 L
EMD Value
₹28,000
Closing Date
31 Dec 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(BP)
BLOCK DEVELOPMENT OFFICER (BP) SRIVAIKUNDAM Panchayat Union Office,SrivaikundamBlock,Thoothukudi District
CONSTRUCTION OF 60000 12.00m stagelitre capacity of OHTBorewell and 5HP Motor Extension of Pipe line (870m) arrangement at Mangalakurich village and Panchayat in srivaikundam Panchayat Union Thoothukudi district underthe Scheme of 15th CFC 2025-26(B
2025_RDTN_634599_1
SrivaiLr.No.m2/2950/2025 Dt 19.12.2025
Open Tender
Civil Works
Item Rate
150 days
srivaikundam block
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹28,000
13 Jul 2026
19 Dec 2025
31 Dec 2025
19 Dec 2025
31 Dec 2025
19 Dec 2025
Earth work excavation and depositing on bank with initial lead 10m and lift of 2.0m in the following classification of soils, bailing out water wherever necessary including providing danger lights etc., and as directed as per specification SS 20B and special specification. in Hard rock Rock requiring blasting as per standard specifications and as directed by the Engineer
First depth of 2m for column foundation
Second depth of 2m for column foundation
Sand filling for foundation with M sand including consolidation ramming etc. complete as per standard specifications and as directed by the Engineer-incharge
For column Foundation
Plain Cement concrete 1:4:8 for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing and curing etc., complete and as directed for works beyond 1.50m and upto 4.50m depth below ground level
For column Foundation
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
(i) below 1.50m to 4.50m depth from G.L for Footing
Below G.L upto 1.50m depth for column & G.L brace
Above 4.50m to 7.32m ht., from G.L for column & brace
Above 7.32m to 10.98m ht., from G.L for column & brace
Above 10.98m to 14.64m ht., from G.L for column
Above 14.64m ht., to 18.30m ht., for roof slab & side wall
Centering for soffits of reinforced cement concrete slabs or plain surface including strutting upto 3m ht., using MS sheet of size 90cm x 60cm and BG. 10 gauge stiffened with welded MS angles of size 25mm x 2mm x 3mm laid over silver oak (country wood) joints of 10cm x 6.5cm spaced at about 90cm c/c and supported by Casurina props of 10cm to 13cm dia. at 75cm c/c complying with standard specification and as directed.
Plain Surface
Upto 3.30m ht., from G.L for Column footing, G.L brace peripheral & I set of Brace above GL
From 3.30m to 4.30m ht., for brace & roof slab bottom
From 5.30m to 6.30m ht., for brace
From 6.30m to 7.30m ht., for brace
From 8.30m ht., to 9.30m ht., for brace
From 9.30m ht., to 10.30m ht., for brace
From 11.30m to 12.30m ht. for floor beam & floor slab bottom (including 1.5m working space)
Centering for square column
upto 3.30m ht.
From 3.30m to 4.30m ht
From 4.30m to 5.30m ht.,
From 5.30m to 6.30m ht.
From 6.30m to 7.30m ht
From 7.30m to 8.30m ht.,
From 8.30m ht to 9.30m ht
From 9.30m ht to 10.30m ht
From 10.30m ht to 11.30m ht
From 11.30m ht to 12.30m ht
Centering for curved surface
From 0 to 3.30m ht from floor level for side wall
From 3.3 to 4.30m ht from floor level for side wall & roof slab sides
Supplying, fabricating and placing in position of RTS grills for reinforcement for various members including cost of steel for all RCC works etc., complete as per standard specifications and as directed by Engineer. The rate to include the cost of binding wire also.
Emulsion Painting two coats including cost and conveyence and all labour charges etc
Provision for pipe connection arrangements for lnlet, outlrt, scour and overflow etc., including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete as detailed below.
Sub Estimate- Providing Borewell arrangement
Supply and delivery of 80mm GI Pipe
Laying and jointing the GI Pipe 80mm
Sub Estimate- Providing Extension of Pipe Linearrangement
Earth work excavation for narrow trench in all soils such as red earth hard stiff clay soil stiff black cotton soil hard redearth shales murrams gravel hard rock not requiring blasting etc
Supply and deliveryof 75mm PVC 4KSC pipe including cost and conveyence
Lowering pvc rigid pipes and specials into trench and laying to proper grade and alignment jointing with pvc couplers
Refilling the excavated earth into the trench after laying pipeline including all labour charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_759350.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
TechnicalBid.pdf
Tender Documents • 0.72 MB
BOQ_759350.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].