Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LQualified | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹8.4 L+₹45,283 (5.71%)Qualified 0 TAMBESHWAR NAGAR VIP ROAD TAMBESHWAR NAGAR FATEHPUR UTTAR PRADESH 212601 | FATEHPUR | UTTAR PRADESH | 212601 | L2 | Qualified MSE, MII, Category: OBC | |
| 3 | L3₹8.4 L+₹46,428 (5.86%)Qualified KOTLI BHAGWANA TEH ARNIA JAMMU JAMMU KASHMIR 181132 | JAMMU | JAMMU AND KASHMIR | 181132 | L3 | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
16 Aug 2022, 8:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CONSTRUCTION AND DECORATIVE ITEMS
3664156
GEM/2022/B/2420906
CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUCTION,CONSTRUC
90 days
Punjab; Gurdaspur
Total value wise evaluation
BOQ
1 document required · 1 mandatory
Exempted
16 Aug 2022
8 Aug 2022
16 Aug 2022
80 days from bid end date (until 5 Nov 2022)
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | CONSTRUCTION | Excavation in trenches for wall base (0.60m wide and 0.50m wide) | 25 | RM | rksharma.616 | 90 |
| 2 | CONSTRUCTION | Material and Labour for PCC 1x3x6 100mm thick below brick work. | 13 | Sqm | rksharma.616 | 90 |
| 3 | CONSTRUCTION | Excavation and Surface dressing and leveling Area 14 mtr x 11 mtr | 154 | Sqm | rksharma.616 | 90 |
| 4 | CONSTRUCTION | Material and Labour for brick work with sub class ‘B’ bricks built in cement mortar 1x6, complete all as specified and directed. | 17 | Cum | rksharma.616 | 90 |
| 5 | CONSTRUCTION | Material and labour for 15mm thick plaster in cement mortar 1x5 on fair faces of brick wrk or concrete surfaces finishing the surfaces even and smooth without using extra cement complete all as specified and directed. | 140 | Sqm | rksharma.616 | 90 |
| 6 | CONSTRUCTION | Material and labour for hard core of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 10 cm thick, watered and rammed to a true surfaces complete. | 16 | Cum | rksharma.616 | 90 |
| 7 | CONSTRUCTION | Material and Labour for PCC 1x4x8, 75mm thick type D-2 using 40mm graded crushed stone aggregate, as in Sub Base all as specified & directed. | 154 | Sqm | rksharma.616 | 90 |
| 8 | CONSTRUCTION | Material and labour for Cement concrete type B1 1x2x4 (using 20mm graded crushed stone aggregate) 75 mm thick as in Floor finished surface even and smooth without using extra cement complete all as specified and directed. | 154 | Sqm | rksharma.616 | 90 |
| 9 | CONSTRUCTION | Material and labour for two coats of cement base paint to newly plastered surfaces including preparation of surfaces and Curing after each Coat, complete all as specified and directed | 70 | Sqm | rksharma.616 | 90 |
| 10 | CONSTRUCTION | Material and labour for two coats of oil bound distemper on newly plastered surface of wall over a coat of primer over 1 to 2mm thick wall care putty incl preparation of surface complete all as specified and directed. | 70 | Sqm | rksharma.616 | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3664156.pdf
GEM_BID
bid-2_2022-08-06-18-52-11_802bffaf52fcc3ff94dc2d99605fce95.pdf
BOQ
boq_item_sample_file_2022-08-06-18-52-11_5c67458099efd319f8435d032d182eb9.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .