Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.9 LAdmitted-Finance L I G 50 NIRALA NAGAR DISTT UNNAO | UNNAO | UNNAO | UTTAR PRADESH | -1.05% | ₹21.9 L | L1 | Admitted-Finance |
| 2 | L2₹22.2 LAdmitted-Finance | -0.10% | ₹22.2 L | L2 | Admitted-Finance |
| 3 | L3₹22.2 LAdmitted-Finance KURMIKHERA KALA CHAUBEPUR KANPUR NAGAR | -0.01% | ₹22.2 L | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
8 May 2026, 3:00 pmClosed
DDC mandi parishad Lucknow
3rd floor kisan mandi bhawan gomti nagar Lucknow
Construction of Link road Akohari mawal main road se thakurain kheda nahar puliya se maurawan gulhriha main road tak (L-0.35 KM)
2026_RKUMP_1135719_1
N.K./Lko/E-Nivida/2026-85 Dated 10.04.2026
Open Tender
Civil Works
180 days
purwa unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,012
DDC mandi parishad Lucknow
₹2.2 L
22 May 2026
17 Apr 2026
8 May 2026
17 Apr 2026
8 May 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing , laying ,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-0100 kN static roller in stages to proper grade and camber, applying and brooming , crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 | - | cum | - | - |
| 2 | Providing , laying ,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-0100 kN static roller in stages to proper grade and camber, applying and brooming , crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 | - | Cum | - | - |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m as directed by the E/I . All Kinds of soil..(SI ) | - | cum | - | - |
| 4 | First class brick work in 1:4 cement and coase sand mortar in foundation and plinth including suplly of all material, labour and T&P etc, required for proper completion. | - | cum | - | - |
| 5 | Providing and laying of cement concrete 1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20 mm nominal size) including curing supply of all material labour T&P etc. complete in all respect required for proper completion of the work. | - | cum | - | - |
| 6 | 12 mm thick cement plaster with cement mortarin propotion of 1:4 cement and coarse sand of single coat for interior reunded angles chamber and rounded angles not exceeding 80 mm in girttinished even and smooth. | - | sqm | - | - |
| 7 | Providing and laying of interlocking concrete block pavement having thickness 80 mm as per drawing and technical specification clause 1504. | - | sqm | - | - |
| 8 | Maintenance cost of 2ndyear @1% cost of work | - | Job | 5,409.96 | - |
| 9 | Maintenance cost of 3rd year @1.50% cost of work | - | Job | 10,819.92 | - |
| 10 | Maintenance cost of 4th year @2.00% cost of work | - | Job | 16,229.88 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.56 MB
Tendernotice_2.pdf
PDF • 0.94 MB
BOQ_2125629.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid